Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18101A593 + (Responds to Request for Addl Info Re 940819 TS Amend Request to Add New Action Statement to TS 3.1.3.2.1, Position Indication Sys)
- GO2-94-116, Responds to Request for Addl Info Re 940217 Request for Amend to TS to Support Hydrostatic Testing + (Responds to Request for Addl Info Re 940217 Request for Amend to TS to Support Hydrostatic Testing)
- ML20094R317 + (Responds to Request for Addl Info Re 950317 Application for Amend to TSs to Allow Containment Airlock Doors to Be Open During Fuel Movement)
- ML20065K986 + (Responds to Request for Addl Info Re ASME Class 1 Block Forged Tees,Per 940218 Telcon Request.Fittings Meet ASME Code Requirements)
- NPL-98-0510, Responds to Request for Addl Info Re ASME Section XI Relief Requests PTP-3-01 & 3-02 for Units 1 & 2.Relief Request PTP-3-01 Deals W/Testing of ASME Code Class 1,2 & 3 Bolting. Util Withdrawing Relief Request + (Responds to Request for Addl Info Re ASME Section XI Relief Requests PTP-3-01 & 3-02 for Units 1 & 2.Relief Request PTP-3-01 Deals W/Testing of ASME Code Class 1,2 & 3 Bolting. Util Withdrawing Relief Request)
- ML20216F049 + (Responds to Request for Addl Info Re Accident Dose Analysis & CR Habitability Analyses Analyses for Max Hypothetical Accident,Fuel Handling Accident & Control Element Assembly Ejection Event)
- ML18065A603 + (Responds to Request for Addl Info Re Actions Taken to Ensure Effective Mgt Oversight of Plant Activities Per Insp Rept 50-255/95-14)
- A08060, Responds to Request for Addl Info Re Actions Taken to Address Problems Noted in Insp Rept 50-423/89-03.Corrective Actions:Procedure Sp 3641D.3 Revised to Include Smoke Detectors + (Responds to Request for Addl Info Re Actions Taken to Address Problems Noted in Insp Rept 50-423/89-03.Corrective Actions:Procedure Sp 3641D.3 Revised to Include Smoke Detectors)
- ML18046B111 + (Responds to Request for Addl Info Re Adequacy of Station Power,Per 811009 Telcon.Ka Joner & Pk Smith Encl)
- ML20134P862 + (Responds to Request for Addl Info Re Alternate Shutdown Capabililty for Fire Area 34B,per 10CFR50,App R.Util Upgrading Emergency Operating Procedures Per NUREG-0737, Item 1.C.1)
- ML20215F448 + (Responds to Request for Addl Info Re Alternate Radwaste Bldg (ARB) Preoperational Tests.Waste Water Demineralization, Resin Dewatering & Dry Active Waste Compaction Sys Constitute Three Operating Sys in ARB)
- ML20113C366 + (Responds to Request for Addl Info Re Amend Request for FOL R-108)
- ML20095C098 + (Responds to Request for Addl Info Re Analysis to Determine Gas & Water Clearing Thrust Loads Concerning Second Safety Relief Valve Actuations in Discharge Lines,Per NUREG-0661. Containment Adequate for Five & Addl Five Valve Actuation)
- ML20154Q502 + (Responds to Request for Addl Info Re Application for Renewal of License SNM-1531.Use of Cordis Nuclear Omni-Stanicor Model 184A & Coratomic Model C-101 Not Planned.Arco Nuclear NU-5 Must Remain on License Due to Implantation in Patient)
- ML20204H316 + (Responds to Request for Addl Info Re Application for License to Implant Medtronic Tm Laurens Alcatel Model 9000 Isotopic Pulse Generator)
- ML20058G699 + (Responds to Request for Addl Info Re Application for Amend to Certificate of Compliance 6678 Allowing Shipment of LP-50 Containers from Uk to Doe.Shipment of 10 Containers Will Take Place by 910228 & Not 901130.Info Listed)
- ML20204H255 + (Responds to Request for Addl Info Re Application for Renewal of License SNM-1375)
- ML17158A683 + (Responds to Request for Addl Info Re App R Safe Shutdown Analysis Fire Protection Review Rept,Rev 4)
- PLA-4321, Responds to Request for Addl Info Re App R Safe Shutdown Analysis Fire Protection Review Rept,Rev 4 + (Responds to Request for Addl Info Re App R Safe Shutdown Analysis Fire Protection Review Rept,Rev 4)
- ML20095L047 + (Responds to Request for Addl Info Re Application for Amend to License R-66.Resubmittal of Nonconversion Changes to Current TS Delayed Beyond 30-day Request)
- ML20083C011 + (Responds to Request for Addl Info Re Application for Amend to License NPF-42,revising TS Tables 2.2-1,4.3-1 & Associated Bases to Accommodate Replacement of Existing RCS RTD Bypass Sys W/Rtd Thermowell Sys.Encl Withheld)
- ML20127C272 + (Responds to Request for Addl Info Re Application for Approval of Prototype Coke Drum Level Gauge.Gauge Utilizes Backscatter Technique Where Both Source & Detector on Outside of Vessel)
- 2CAN018801, Responds to Request for Addl Info Re Application for Amend to License NPF-6.Time from Actuation of Control Room Alarm to Loss of Shutdown Margin for Modes 3,4,5 & 6 Listed.Values Satisfy Acceptance Criteria of SRP + (Responds to Request for Addl Info Re Application for Amend to License NPF-6.Time from Actuation of Control Room Alarm to Loss of Shutdown Margin for Modes 3,4,5 & 6 Listed.Values Satisfy Acceptance Criteria of SRP)
- ML20043G174 + (Responds to Request for Addl Info Re BAW-10174, Mark-BW Reload LOCA Analysis for Catawba & Mcguire. Correct RCS Operating Pressure Would Be 2,250 Psia as Identified in Table 3-1)
- ML20034B660 + (Responds to Request for Addl Info Re Bailey solid-state Logic Module Reliability During 1988 & 1989.Reduction in Failure Rate of Modules Observed Since Implementation of Design Changes to Ventilation Supply to Equipment Room)
- LD-92-020, Responds to Request for Addl Info Re C-E Std SAR-Design Certification + (Responds to Request for Addl Info Re C-E Std SAR-Design Certification)
- ML20024G334 + (Responds to Request for Addl Info Re Cask Drop Accident Analysis)
- ML20102C000 + (Responds to Request for Addl Info Re Compliance W/Guideline 5 of NUREG-0612, Control of Heavy Loads. Evaluation of Potential Routine Dynamic Loading for Lifting Devices Found to Be Small Fraction of Max Static Loads)
- ML18153C839 + (Responds to Request for Addl Info Re Component Cooling HX Channel Head Replacement.Matl Condition of Channel Heads Will Be Periodically Monitored.If Degradation Noted,Heads Will Be Repaired During Operating Cycle)
- ML20198C186 + (Responds to Request for Addl Info Re Containment Leakage Testing Program Tech Spec.Info Supporting Finding of NSHC Encl & Supercedes 861010 Amend Application)
- ML20206D501 + (Responds to Request for Addl Info Re Confirmatory Issue 41 on NUREG-0737,Item III.D.1.1, Sys Outside Containment Containing Radioactive Matl. Sys Will Be Inspected During Preoperational Testing Phase)
- ML20005B184 + (Responds to Request for Addl Info Re Containment Purge Valve Mechanical Operability.Util Estimate Indicates Insignificant Torque Increase of Approx 6%.Rockwell Valve Disc & Fisher 7600 Valve Disc Is Symmetrical to Shaft)
- ML19351A206 + (Responds to Request for Addl Info Re Concrete Repair Program Utilized in Repair of Reactor Containment Bldg Shell Walls. Adequacy of Repairs Required as Result of Lift 8 Concrete Void Investigation Verified Following Repair of Lift 15)
- RBG-20-080, Responds to Request for Addl Info Re Confirmatory Item 33 of Table 1.4 of Ser,Concerning Standby Liquid Control Sys (Slcs).Util Will Install Addl Annunciator (Valve C41-F031 Not Fully Closed) for SLCS Test Tank Suction Valve + (Responds to Request for Addl Info Re Confirmatory Item 33 of Table 1.4 of Ser,Concerning Standby Liquid Control Sys (Slcs).Util Will Install Addl Annunciator (Valve C41-F031 Not Fully Closed) for SLCS Test Tank Suction Valve)
- ML20137T215 + (Responds to Request for Addl Info Re Concentration of Combustibles Inside Containment,Per Util Request Not to Install Automatic Sprinkler Sys Inside Containment.Safe Shutdown Analysis Will Be Completed by May 1986)
- ML20245H825 + (Responds to Request for Addl Info Re Consideration of Severe Accident Mitigation Design Alternatives.Tables Listing Current Estimated Core Damage Frequency Per Reactor Yr & Dominant Population Dose Sequences Encl)
- NLS9400026, Responds to Request for Addl Info Re Confirmatory Action Ltr 4-94-06B + (Responds to Request for Addl Info Re Confirmatory Action Ltr 4-94-06B)
- ML20059H575 + (Responds to Request for Addl Info Re Copes-Vulcan Valve Weight & center-of-gravity Issue Discussed at 930929 Enforcement Conference in Rockville,Md & Per 931013 & 20 Telcons)
- HL-5019, Responds to Request for Addl Info Re Core Shroud Mod Scheduled for Installation During Fall 1995 Unit 2 Refueling Outage.Also,Forwards Proprietary Stress Corrosion Cracking Evaluation of XM-19 in BWR Environment. Encl Withheld + (Responds to Request for Addl Info Re Core Shroud Mod Scheduled for Installation During Fall 1995 Unit 2 Refueling Outage.Also,Forwards Proprietary Stress Corrosion Cracking Evaluation of XM-19 in BWR Environment. Encl Withheld)
- ML17059A701 + (Responds to Request for Addl Info Re Core Shroud Repair. Suppl 1 to GE-NE-B13-01739-04, Suppl 1 to Nine Mile Unit 1 Shroud Encl)
- ML17059A702 + (Responds to Request for Addl Info Re Core Shroud Repair. Suppl 1 to GE-NE-B13-01739-04, Suppl 1 to Nine Mile Unit 1 Shroud Encl)
- ML20247M753 + (Responds to Request for Addl Info Re Cost Estimates for Severe Accident Mitigation Design Alternatives.Forwards Bechtel Rept, Cost Estimate for Severe Accident Mitigation Design Alternatives. W/O Rept)
- W3P85-2175, Responds to Request for Addl Info Re Dcrdr Audit on 850603-06.Info Concerning Relationship Between Control Room Instrumentation Characteristics & Plant Safety Analyses Discussed + (Responds to Request for Addl Info Re Dcrdr Audit on 850603-06.Info Concerning Relationship Between Control Room Instrumentation Characteristics & Plant Safety Analyses Discussed)
- ML20115F765 + (Responds to Request for Addl Info Re Decommissioning Plan. Surface Contamination Will Be Monitored W/Suitable Alpha, Beta & Gamma Sensitive Instruments)
- ML20246E555 + (Responds to Request for Addl Info Re Defueling Analysis, Including Core Physics Analyses & Preliminary Evaluation of Boronated Defueling Elements.Lumped Poison Pins Provide Passive Method of Ensuring Reactivity Control)
- ML20040B488 + (Responds to Request for Addl Info Re Degraded Grid Voltage Protection.Action Plan Finalized in 800505 Meeting Outlined in Attachments 1 & 2.Misunderstanding Apparently Exists Between NRC & Util)
- ML19209C227 + (Responds to Request for Addl Info Re Degraded Grid Voltage. Discusses Onsite Test Procedure.Forwards Rept on Voltage Drop Study, Revision 1)
- ML19209C228 + (Responds to Request for Addl Info Re Degraded Grid Voltage. Discusses Onsite Test Procedure.Forwards Rept on Voltage Drop Study, Revision 1)
- ML18033B179 + (Responds to Request for Addl Info Re Denial of Violation 50-260/89-10-01.Encl Analysis Demonstrates That Emergency Equipment Cooling Water Design Flow Would Be Maintained Following Postulated Seismic Event)
- AECM-84-0276, Responds to Request for Addl Info Re Diesel Generator Reliability Issues.Figures Encl Denote Response of Various Parameters,As Function of Time,Analyzed for Nondesign Basis Event + (Responds to Request for Addl Info Re Diesel Generator Reliability Issues.Figures Encl Denote Response of Various Parameters,As Function of Time,Analyzed for Nondesign Basis Event)
- ML20108D211 + (Responds to Request for Addl Info Re Draft SER Open Item 46 Re Conformance to Reg Guide 1.133,Paragraph C.4.K Concerning Loose Parts Monitoring Sys.Sys Generically Seismically Qualified by B&W.Item Closed)