ML20094R317
| ML20094R317 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 11/30/1995 |
| From: | Mccoy C GEORGIA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| TAC-M92172, NUDOCS 9512040356 | |
| Download: ML20094R317 (2) | |
Text
,.
~
~
- 4 e
Gebrea Power Company 40 inverress Center Parkway Post Offee Bos 1295
?
BirmirWm. Alabama 35201
' Telephone 205 877 7122 c.K.McCoy Georgia Power 1
the southem electre system November 30, 1995 LCV-0527-C Docket Nos. 50-424 50-425 b
TAC Nos.
M-92172 M-92173 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
- VOGTLE ELECTRIC GENERATING PLANT ADDITIONAL'INFORMATION CONCERNING REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO ALLOW CONTAINMENT AIRLOCK DOORS TO BE OPEN DURING FUEL MOVEMENT i
By letter LCV-0527, dated March 17,1995, Georgia Power Company (GPC) proposed an amendment to the Vogtle Electric Generating Plant (VEGP) Unit I and Unit 2 Technical Specifications to allow the personnel airlock (PAL) doors to be open during fuel i
movement. As stated in LCV-0527, the estimated doses for a failure to close the door -
during the entire 2-hour release period of a Fuel Handling Accident has similar radiological consequences to a Fuel Handling Accident in the Spent Fuel Pool which has already been approved by the NRC. To assure that reasonable action will be taken to minimize the effects of a Fuel Handling Accident inside containment, a commitment was i
~
de to maintain a designated person for closing the door. Procedures will be developed ma to provide administrative controls to ensure that the designated person will be available to close the airlock door. These administrative controls will include guidance to allow the individual to perform other duties to the extent that they do not compromise the ability to operate the airlock door in a timely manner.
This additional information is being provided to the NRC in response to a teleconference with the NRC staff on November 11,1995.
cc: (See next page)
'\\ 1 0 05C001 9512040356 951130
~
PDR ADOCK 05000424 P._
_ _ PDR _ _
o
d.
-1.,
GeorgiaLbwer b U.' S. Nuclear Regulatory Commission Page 2 i
CKM/HWM/gmb cc: ~ Geornia Power Company Mr. J. B. Beasley, Jr.
Mr. M. Sheibani 1
NORMS I
U. S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. L.- L. Wheeler, Licensing Project Manager, NRR Mr. C. R. Ogle, Senior Resident Inspector, Vogtle State of Georgia Mr. J. D. Tanner, Commissioner, Dept. of Natural Resources t
I LCV-0527-C 3
L i
i F00775