Responds to Request for Addl Info Re 950317 Application for Amend to TSs to Allow Containment Airlock Doors to Be Open During Fuel Movement
ML20094R317
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/30/1995
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TAC-M92172, NUDOCS 9512040356
Download: ML20094R317 (2)


Text

, . _ .- - ~ ~ .- - . . _ - . -

4
  1. e Gebrea Power Company 40 inverress Center Parkway Post Offee Bos 1295 *

?

BirmirWm. Alabama 35201

' Telephone 205 877 7122 c.K.McCoy Georgia Power 1 the southem electre system November 30, 1995 LCV-0527-C Docket Nos. 50-424 50-425 b TAC Nos. M-92172 M-92173 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk '

Washington, D. C. 20555 Gentlemen:  ;

> - VOGTLE ELECTRIC GENERATING PLANT ADDITIONAL'INFORMATION CONCERNING  !

REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO ALLOW CONTAINMENT AIRLOCK DOORS TO BE OPEN DURING FUEL MOVEMENT i By letter LCV-0527, dated March 17,1995, Georgia Power Company (GPC) proposed an .

< amendment to the Vogtle Electric Generating Plant (VEGP) Unit I and Unit 2 Technical i Specifications to allow the personnel airlock (PAL) doors to be open during fuel movement. As stated in LCV-0527, the estimated doses for a failure to close the door -

during the entire 2-hour release period of a Fuel Handling Accident has similar radiological consequences to a Fuel Handling Accident in the Spent Fuel Pool which has already been approved by the NRC. To assure that reasonable action will be taken to minimize the effects of a Fuel Handling Accident inside containment, a commitment was  ;

i ~

ma de to maintain a designated person for closing the door. Procedures will be developed to provide administrative controls to ensure that the designated person will be available to

, close the airlock door. These administrative controls will include guidance to allow the individual to perform other duties to the extent that they do not compromise the ability to operate the airlock door in a timely manner.

This additional information is being provided to the NRC in response to a teleconference with the NRC staff on November 11,1995.

cc: (See next page) '\ 1 0 05C001  :

~

9512040356 951130 PDR ADOCK 05000424 o P._ _ _ PDR _ _

. . -; d.

-1.,

GeorgiaLbwer b U.' S. Nuclear Regulatory Commission Page 2 i

l CKM/HWM/gmb -

cc: ~ Geornia Power Company Mr. J. B. Beasley, Jr. -

Mr. M. Sheibani 1 NORMS I U. S. Nuclear Regulatory Commission  :

Mr. S. D. Ebneter, Regional Administrator  !

Mr. L.- L. Wheeler, Licensing Project Manager, NRR Mr. C. R. Ogle, Senior Resident Inspector, Vogtle ,