Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20002B327 + (Requests,On Behalf of Util,Extension Until 810108 to Request Hearing Re NRC 801118 Order for Mod to License.Requested Extension Would Allow for Better Understanding of Order Requirements)
- ML20002B350 + (Requests,On Behalf of Util,Extension Until 810108 for Hearing on 801118 Order for Mod of License to Allow More Reasoned Determination)
- ML20002B450 + (Requests,On Behalf of Util,Nrc Promptly Establish Licensing Board to Consider Util License Amend Request for Facility Chemical Cleaning Project.Cleaning Should Proceed Prior to Evidentiary Hearings on Basis of NRC Safety Evaluation)
- ML20211C581 + (Requests,On Behalf of Util,Reevaluation of Finding That No Significant Changes Occurred in Licensee Activities or Proposed Activities Since Completion of Previous Antitrust Review Re Cp,Based on Listed Reasons)
- ML19347B639 + (Requests,On Behalf of Util,That Board Hold Conference Call Involving All Parties to Discuss & Resolve Serious Questions Re Trial Brief & Related Filings Submitted by Tx Util Generating Co.Certificate of Svc Encl)
- ML19343A962 + (Requests,On Behalf of Util,That New General Counsel,Dp Cameron,Be Added to Svc List)
- ML19343C511 + (Requests,Per 10CFR50.12,extension of Specified Schedule Dates of Newly Enacted Fire Protection Regulations in 10CFR50.48.Extension Not Detrimental to Health & Safety.No Urgent Considerations Mandate Use of App R Requirements)
- ML20206T288 + (Requests,Per 910425 NRC Ltr from J Lubinski to O Mcdonald & 910522 Telcon,Please Remove Name from List of Companies Needing to Rept Transfers of Gauges Under 10CFR31.5.Company Is User of Gauges & Does Not Transfer or Distribute Same)
- ML19210A970 + (Requests,Per Conditions of Contract AT(49-5)2667,analysis of Engineering Factors of Proposed Design to Minimize Damage from seismically-induced Ground Motions,Rept on Same,Svc as Expert Witness at Hearing.Forwards Psar,Vols 1-111.W/o Encl)
- ML20079R920 + (Requests,Per County Resolution 302,immediate Suspension of Licenses Based on FEMA Rept Findings.Resolution Encl)
- ML20062J776 + (Requests,Per GL 90-05,relief from ASME Boiler & Pressure Vessel Code Section XI Requirements.Description of Actions Taken by Util to Make Temporary non-code Repairs to Leak in SWS Line 1801-6-153-3 Encl)
- ML20217E905 + (Requests,Pursuant to 10CFR2.206,that NRC Take Immediate Action to Suspend CYAPCO License to Operate Connecticut Yankee Nuclear Power Station in Haddam Neck,Connecticut)
- ML19260C846 + (Requests,Submitted on Behalf of Georgians Against Nuclear Energy,That NRC Suspend CPs Due to Recent Evidence That Plants Are Unnecessary.Hearings Should Be Conducted Re Need for Facilities & Compliance W/Regulations)
- ML19305D342 + (Requests,Submitted on Behalf of Util Group for Regulatory Applications,That NRC Review Retran Computer Code.Code Will Be Used for Transient Analysis & Supportive Activities Required for Plant Mod or Reload Licensing)
- ML20217E900 + (Requests,Under 10CFR110.20(a)(2) & 10CFR110.32,issuance of License to Import Combustible Matl Contained with Low Enriched U from Germany)
- ML19326D459 + (Requests,Upon Instruction of Aslab,Inclusion of Info in NRC Brief in Response to Aslab 750819 Order,Including Number of Show Cause Orders Issued & Number of Such Orders Referred to Adjudicatory Hearing at Applicant,Intervenor or NRC Request)
- ML17213B077 + (Requests,Within 15 Days,Assessment of Operability of Henry Pratt R1A Butterfly Valves Used for Purging & Venting of Containment & Commitment That Subj Valves Will Be Sealed Closed Per SRP Section 6.2.4,II.6.f)
- ML19345A343 + (Requests,Within 20 Days of Receipt of Ltr,Info on Reactor Re Max Excess Reactivity of Reactor,Total Control Rod Worth & Min Shutdown Margin Both at Room & Operating Temps)
- ML18043A926 + (Requests,Within 60 Days,Submission of Info Providing Assurance That Water Hole Peaking Has Been Considered in Calculation of Flux Distribution)
- ML13261A043 + (Requesty for Additional Information Regarding License Amendment Request for Extended Power Uprate)
- ML17157B114 + (Requets Addl Info on Proposed Changes to Plant Tech Spec Requirements Re Rwcu/Hpci/Rcic Temp Setpoints for Leak Detection)
- ML20078C035 + (Requets Exemption from 10CFR50,App J,Type B Local Leak Rate Testing Requirements for Containment Air Locks. Supporting Info Encl)
- TSTF-197 + (Require Containment Closure When Shutdown Cooling Requirements Are Not Met)
- TSTF-018-A + (Require Only One -SECONDARY - Containment Access Door PER Access Opening to Be Closed)
- TSTF-018 + (Require Only One -SECONDARY - Containment Access Door PER Access Opening to Be Closed)
- L-MT-09-096, Required 30-Day Offsite Dose Calculation Manual Report for the Monticello Nuclear Generating Plant + (Required 30-Day Offsite Dose Calculation Manual Report for the Monticello Nuclear Generating Plant)
- BSEP 11-0061, Required 30-Day Response to NRC Bulletin 2011-01, Mitigating Strategies + (Required 30-Day Response to NRC Bulletin 2011-01, Mitigating Strategies)
- ML11166A069 + (Required 30-Day Response to NRC Bulletin 2011-01, Mitigating Strategies)
- 3F0711-03, Required 60-Day Response to NRC Bulletin 2011-01, Mitigating Strategies + (Required 60-Day Response to NRC Bulletin 2011-01, Mitigating Strategies)
- ML18114A176 + (Required Analyses for Informing Emergency Planning Zone Size Determinations)
- 05000251/FIN-2015007-03 + (Required Appendix R Instrumentation Not Functional on Unit 4 Alternate Shutdown Panel)
- 05000285/FIN-2015001-03 + (Required In-Service Testing for Steam Generator Auxiliary Feedwater Inlet Valves)
- ML20126K831 + (Required Initial Conditions for Energetic Steam Explosions)
- 05000263/LER-2008-004, Required Manual Isolation Time for High Energy Line Break Calculation Not in Procedure + (Required Manual Isolation Time for High Energy Line Break Calculation Not in Procedure)
- L-17-169, Required Notification of Receipt of All Required Regulatory Approvals of the Proposed Transfer Actions and Documentary of Required Insurance + (Required Notification of Receipt of All Required Regulatory Approvals of the Proposed Transfer Actions and Documentary of Required Insurance)
- L-16-171, Required Notification of Receipt of All Required Regulatory Approvals of the Proposed Transfer Actions and Documentary Evidence of Required Insurance + (Required Notification of Receipt of All Required Regulatory Approvals of the Proposed Transfer Actions and Documentary Evidence of Required Insurance)
- RA-15-0033, Required Notification of Receipt of All Required Regulatory Approvals of the Proposed Direct Transfer Action + (Required Notification of Receipt of All Required Regulatory Approvals of the Proposed Direct Transfer Action)
- ENS 55713 + (Required Offsite and Both Onsite Emergency AC Power Paths Inoperable)
- 05000269/FIN-2008003-01 + (Required Pressure Tests Not Performed)
- ENS 54492 + (Required Procedural Controls Were Not Followed)
- ML20136B025 + (Required Procedures for Radiation Protection)
- ML021650211 + (Required Report, Transmitted within 30 Days. University of Arizona Deficiency Report for Defiency Discovered on 05/20/2002, in Implementation of University of Arizona Operator Re-qualification Program as Required in 10 CFR 55)
- NL-13-053, Required Response 2 for NTTF Recommendation 2.1: Flooding - Hazard Reevaluation Report + (Required Response 2 for NTTF Recommendation 2.1: Flooding - Hazard Reevaluation Report)
- GNRO-2013/00020, Required Response 2 for Near-Term Task Force Recommendation 2.1: Flooding - Hazard Reevaluation Report + (Required Response 2 for Near-Term Task Force Recommendation 2.1: Flooding - Hazard Reevaluation Report)
- ML15106A681 + (Required Response 2 for Near-Term Task Force Recommendation 2.1: Flooding - Hazard Re-Evaluation Report)
- 0CAN031401, Required Response 2 to March 12, 2012, Request for Information (Rfi), Enclosure 2, Recommendation 2.1, Flood Hazard Evaluation Report Arkansas Nuclear One - Units 1 and 2 + (Required Response 2 to March 12, 2012, Request for Information (Rfi), Enclosure 2, Recommendation 2.1, Flood Hazard Evaluation Report Arkansas Nuclear One - Units 1 and 2)
- 0CAN041402, Required Response 2 to March 12, 2012, Request for Information (Rfi), Enclosure 2, Recommendation 2.1, Flood Hazard Evaluation Report + (Required Response 2 to March 12, 2012, Request for Information (Rfi), Enclosure 2, Recommendation 2.1, Flood Hazard Evaluation Report)
- ML20003F738 + (Required Response Spectra Used for Equipment Qualification)
- ML13364A006 + (Required Response for NTTF Recommendation 2.1: Flooding - Hazard Reevaluation Report)
- 05000528/LER-2007-006 + (Required Shutdown due to Inoperable Steam Admission Bypass Supply Valve to Auxiliary Feedwater Pump)