Required Response 2 for Near-Term Task Force Recommendation 2.1: Flooding - Hazard Re-Evaluation Report
ML15106A681
Person / Time
Site: Palisades Entergy icon.png
Issue date: 03/11/2015
From: Vitale A J
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML15114A209 List:
References
PNP 2015-018
Download: ML15106A681 (3)


Text

SNEntergy Entergy Nuclear Operations, Inc.Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530 Tel 269 764 2000 Anthony J. Vitale Site Vice President PNP 2015-018 March 11,2015 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852

SUBJECT:

Required Response 2 for Near-Term Task Force Recommendation 2.1: Flooding -Hazard Re-Evaluation Report Palisades Nuclear Plant Docket 50-255 License No. DPR-20

REFERENCES:

1.NRC letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012 (Adams Accession No. ML12056A046).

2. Entergy Nuclear Operations, Inc. letter, PNP 2012-049, Response to NRC Request for Information (RFI) Pursuant to 10 CFR 50.54(f)Regarding the Flooding Aspects of Recommendations 2.1 and 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated June 8, 2012 (ADAMS Accession No. ML12163A533).

Dear Sir or Madam:

On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued a 50.54(f) letter to all power reactor licensees and holders of construction permits in active or deferred status. Enclosure 2 of Reference 1 contains specific requested actions, requested information, and required responses associated with Recommendation 2.1: Flooding.Pursuant to Required Response 2 of Enclosure 2 in Reference 1, Entergy Nuclear Operations, Inc. (ENO) is providing the Palisades Nuclear Plant Flooding Hazard Re-Evaluation Report in the attachment.

No interim action plan is included as discussed in Required Response 2 because there were no evaluations or actions required to address any higher flooding hazards relative to the design basis.

PNP 2015-018 Page 2 of 2 Summary of Commitments This letter contains no new or revised commitments.

This letter completes the following commitment made in Reference 2: 0 Submit flood hazard evaluation to the NRC by March 12, 2015.I declare under penalty of perjury that the foregoing is true and correct. Executed on March 11,2015.Sincerely, ajv/jse

Attachment:

Palisades Nuclear Plant Flooding Hazard Re-Evaluation Report cc: Director of Office of Nuclear Regulation Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC Attachment to PNP 2015-018 Palisades Nuclear Plant Flooding Hazard Re-Evaluation Report 143 pages follow