Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Repository Operational Criteria Analysis". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20147B131  + (Reports on 780915 Underwriters Lab full-scale Vertical Cable Tray Fire Test Including Fire Barriers & Sprinklers.Addl Requirements for Seals & Sprinklers May Be Needed.Final Rept Will Be Issued 780929.W/encl.(encl to 7810050359)
  • ML19326C724  + (Reports on 781116 Site Visit & Meeting W/Util Re SEP Review)
  • ML19256A559  + (Reports on 781130 Meeting of Vessel Integrity Group to Review J-R Curve Data,Proposed Test Plan for 2nd & 3rd Irradiation Specimen & Proposed Experiment Design for the 4th Irradiation Specimen.W/Encl Exhibits)
  • ML19329C977  + (Reports on ACRS 700813-15 Meeting Re Vepco CP Application. Site Insp on 700730.Resolution Needed Re Hydrogen Control Sys,Eccs Core Temp Limiting Capability,Relief Capacity Flexibility & Positive Assurance of Proper Valve Function)
  • ML20147C611  + (Reports on Briefing by D Herd Re Detailed Field Mapping That Has Identified a Number of Faults W/Relatively Young Geological Movement Near Subj Facil)
  • ML19256D705  + (Reports on Completed Review of Reactor Containment Bldg: Ring Girder Surveillance Test Three Yrs After Structural Integrity Test. Rapaired Ring Girder Capable of Fulfilling Design Functions.Submits Recommendations)
  • ML19317E796  + (Reports on Completion of Documentary Production.Completion Expected by 730628)
  • ML20151X057  + (Reports on Completion of Review of Application by Util for Authorization to Construct Plant & Informs That ACRS Believes That Proposed Reactor Can Be Constructed W/ Reasonable Assurance of Operation W/O Risk to Public Safety)
  • ML20147E464  + (Reports on Eval of Thor,Relap & Trac Codes.Recommends Use of Relap & Trac as Lic Tools)
  • ML17054D214  + (Reports on Evaluation Models for AEC Criteria for ECCS, Accepting Models Per App K.Refs Encl)
  • PM-79-212, Reports on Failure of Seismic Monitoring Instrumentation on 790127:peak Acceleration Recorder 2L51-N034 on Feedwater Loop B Inlet Line Was Moved.Instrument Failed Calibr Check & Sent to Manufacturer for Repair  + (Reports on Failure of Seismic Monitoring Instrumentation on 790127:peak Acceleration Recorder 2L51-N034 on Feedwater Loop B Inlet Line Was Moved.Instrument Failed Calibr Check & Sent to Manufacturer for Repair)
  • ML20148P164  + (Reports on Fast Flux Test Facil:W/Due Regard to Adequate pre- & Insvc Inspec & Test Exper Verification of Decay Heat Removal by Natural Circulation,Addl Containment Measures. ACRS Holds Facil Can Startup & Operate)
  • ML20062D784  + (Reports on Fish Impingement Overruns for 3 Species of Fish, Exceeding ETS Limits for Month of Oct.No Apparent Cause Is Known,But No Trend Toward Increased Impingement Is Discerned)
  • ML19289C712  + (Reports on Hearing Divisions Review of Use of WASH-1400 in Pleadings.No WASH-1400 Use Found,Excepting Those Mentioned in 781117 Note to J Kelly.Ofc of Nuclear Reactor Regulation Informed of Instances of Possible Use)
  • ML17317A736  + (Reports on Investigation of Isolation of Deluge Valves to Drumming Room & New Fuel Receiving Area:Closing Valves Was Necessary to Prevent Spurious Oper of Sprinkler Sys During Repairs to Broken Fire Header Outside Bldg from 781027-31)
  • ML20064H750  + (Reports on Problem of Spare Containment Penetrations Lacking Sealing on One End & Informs That Engr Eval to Determine Best Corrective Action Is in Progress.Final Rept Will Be Submitted by 790201)
  • ML20071G093  + (Reports on Status of Facil SER Preparation.Finds It Increasingly Difficult to Differentiate Between Policy & Legal Matters & Almost Impossible to Predict When an SER Will Be Issued.Suggests Policy Decision on SER Preparation)
  • ML19322A188  + (Reports on Status of Solid Waste Handling Sys.Structural Work & Installation of Pump,Piping & Instrumentation Are Completed.Preoperational Test Will Be Completed by Dec 1978. Control Panel Will Be Delivered by 790115)
  • ML19207B403  + (Reports on Status of Steps Taken to Correct Noncompliance Noted in IE Insp Repts 50-219/78-04.Corrective Action:Single Record Storage Facility Established in Bank Vault.Document Center Record Retention Sys Being Upgraded)
  • ML19282C502  + (Reports on Successful Sea Tests of Nuclear Submarine Uss Birmingham)
  • ML19250C501  + (Reports on Testing of Livestock Specimens from Church Rock Area.Results Will Be Released in Two to Three Months.Press Release Encl)
  • ML19210D754  + (Reports to Commission on Study of Proliferation Implication of origin-swapping Transactions Among Countries Engaged in U Commerce.Commission Should Confirm That Countries Are Not Swapping Unlike Matl.Supporting Documentation Encl)
  • ML19128A289  + (Reports to Congress on Establishing Stages in the Advanced Reactor Licensing Process and Increasing the Use of Risk-Informed and Performance-Based Evaluation Techniques and Regulatory Guidance, Required by the Nuclear Energy Innovation and)
  • ML20126A480  + (Repository Environmental Parameters Relevant to Assessing the Performance of HIGH-LEVEL Waste Packages)
  • ML20236J686  + (Repository Environmental Parameters and Models Relevant to Assessing the Performance of HIGH-LEVEL Waste Packages (Basalt,Tuff and Salt))
  • ML20105C987  + (Repository Operational Criteria Analysis)