Reports on Problem of Spare Containment Penetrations Lacking Sealing on One End & Informs That Engr Eval to Determine Best Corrective Action Is in Progress.Final Rept Will Be Submitted by 790201
ML20064H750
Person / Time
Site: North Anna Dominion icon.png
Issue date: 12/20/1978
From: Brown S
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 7812260255
Download: ML20064H750 (1)


Text

/

Oecember 20, 1973 Mr. James P. O'Reilly Diractor Serial No. 631A Office of Inspection & Enforcement PSELC/C3C/mac: wang

'J. S. Nuclear Regulatory Ocunissicn

. legion II 101 Mariatta Street, Suite 3100 Occket No. 50-339 Atlanta, Georgia ?C303 Desc '4r. O'R'eilly:

In tccordance with 100RSO.SS(e), the flRC, Regien II, was notified on Novemoer 20, 1973 that spare containment pipe penetritions are not sealed at 5uth ends 3s stated in the FSAR Secticn 5.2.4.3, Subsection 4 Page 6.2-125.

We nave determined that there are 23 spare penetrations all of which have a welded cap on the inside centainment end only.

Our engineering evaluation to determine the best corrs:tive action is still in progress. This 30-day recort shall he censic'ered an interim report.

A final report c'ccun:enting the :neasures to be taken will be submitted by February 1, 1979.

Very truly yours, f

/

SAC."Brewn,Jr.

Vice President - Power Station Engineering and Construction ec:

Mr. John 3. Davis, Acting Director Office of Inspecticn & Enforcement Mr. Harold R. Denton, Director Office of Nucicar Reactor Regulation S