_ ~

s Gerald G. Meiney t

%ce Prasvient Pesch Bottom Atomic Power Station -

~

,e g

PKO MRGY ecco e <9v c -a ">

nD 1, Box 208 Delta. PA 17314 9739 717 456 7014 January 11,1996 Docket Nos.

50-277 50-278 U.S. Nuclear Regulatory Commission-d Document Control Desk Washington, DC 20555

SUBJECT:

1995 Annual Report on Safety Relief Challenges for the Peach Bottom Atomic Power Station Gentlemen:

This represents the 1995 Annual Report on Safety Relief Challenges for the Peach Bottom Atomic Power Station (PBAPS) as required by the TMI Action Plan, item II. K.3, and by PBAPS Technical Specifications, Paragraph 6.9.1.C: During 1995 there were no automatic actuations of the Main Steam Safety or Relief Valves in response to high reactor pressure.

If you have any questions regarding this matter, please call.

Sincerely, Ge Vice President Q&

pp (7 GRR/BWK:dec

/3 B. Gorman, Public Service Electric & Gas IUlb cc:

R. R. Janati, Commonwealth of Pennsylvania R. I. McLean, State of Maryland T. T. Martin, Administrator, Region I, USNRC W. L..Schmidt, USNRC Senior Resident inspector H. C. Schwemm, Atlantic Electric A. S. Kirb/, Delmarva Power INPO Record Center Correspondance Control Desk,61B-3 CCN 96,14006 9601260182 960111 w

DR ADOCK 05000277 PDR 26005y y)'