Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML24060A227 + (Readiness Assessment Report of the Terrapower, LLC Safety and Environmental Topics of Kemmerer Power Station Unit 1 Construction Permit Draft Application)
- ML20065Q911 + (Readiness Assessment Rept for PANTHERS-PCC)
- ML23318A016 + (Readiness Assessment Summary Observation Report for the Carbon Free Power Project Draft Combined License Application)
- IR 05000220/1990080 + (Readiness Assessment Team Insp Rept 50-220/90-80 on 900430- 0511.Major Areas Inspected:Util Efforts in Performance of Tests,Surveillances & Other Startup Preparation Activities During Insp)
- IR 05000317/1989081 + (Readiness Assessment Team Insp Rept 50-317/89-81 on 891107-20.Major Areas Inspected:Procedure Usage,Control of Plant Status & Activities & Safety Tagging & Equipment Control.Team Found Improvements in All Areas of Insp)
- IR 05000443/1989080 + (Readiness Assessment Team Insp Rept 50-443/89-80 on 890527- 0601.No Violations Noted.Major Areas Inspected:Operations, Radiation Protection,Safety Assessment/Quality Verification & Startup Testing)
- ML18271A216 + (Readiness Group (Vrg) Update (Presentation))
- PMNS20200536, Readiness Group Activities to Support Construction of Vogtle Electric Generating Plant, Units 3 and 4 + (Readiness Group Activities to Support Construction of Vogtle Electric Generating Plant, Units 3 and 4)
- PMNS20200949, Readiness Group Activities to Support Construction of Vogtle Electric Generating Plant, Units 3 and 4 + (Readiness Group Activities to Support Construction of Vogtle Electric Generating Plant, Units 3 and 4)
- PMNS20211452, Readiness Group Activities to Support Construction of Vogtle Electric Generating Plant, Units 3 and 4 + (Readiness Group Activities to Support Construction of Vogtle Electric Generating Plant, Units 3 and 4)
- PMNS20230340, Readiness Group Activities to Support Construction of Vogtle Electric Generating Plant, Units 3 and 4 + (Readiness Group Activities to Support Construction of Vogtle Electric Generating Plant, Units 3 and 4)
- ML21333A217 + (Readiness Group Presentation During 12-2-21 Public Meeting)
- ML21113A227 + (Readiness Group Public Meeting Presentation Slides - April 28, 2021)
- ML20304A203 + (Readiness Notification for 95001 Supplemental Inspection Notice of Violation: EA-20-057)
- ML20148R751 + (Readiness Program Assessment for Limerick 2)
- IR 05000508/1985005 + (Readiness Review Insp Rept 50-508/85-05 on 850528-0904.No Violation Noted.Major Areas Inspected:Preservation of Assets & Preventive Maint Program)
- IR 05000424/1985030 + (Readiness Review Module 3A,Initial Test Program, Preoperational Test Phase Insp Rept 50-424/85-30 on 850514- 0906.Corrective Actions Not Complete & Commitment to Reg Guide 1.95 Not Included in Module 3A)
- IR 05000508/1988002 + (Readiness Review Module C3-02 Concrete Insp Rept 50-508/88-02 on 860915-880603.Major Areas Inspected:Results of Program Review of Completed Concrete Work,Including Planning/Mobilization & Problem History Review)
- ML20207T522 + (Readiness Review Module Insp Rept 50-424/86-80 on 860512- 0808 Re App G, Measuring & Test Equipment. App Acceptable Except as Listed)
- ML20078A575 + (Readiness Review Program Module 11 - Pipe Stress & Supports)
- ML20078A583 + (Readiness Review Program Module 12 - Electrical Cables & Terminations)
- ML20078A428 + (Readiness Review Program Module 12 - Electrical Cables & Terminations)
- ML20078A437 + (Readiness Review Program Module 13A - Foundation Matls & Backfill)
- ML20078A593 + (Readiness Review Program Module 13B - Coatings)
- ML20078A456 + (Readiness Review Program Module 13C - Post-Tensioned Containment)
- ML20078A461 + (Readiness Review Program Module 16 - Nuclear Steam Supply Sys)
- ML20078A471 + (Readiness Review Program Module 17 - Raceways)
- ML20078A604 + (Readiness Review Program Module 17/19 - Electrical Raceways & Supports)
- ML20078A612 + (Readiness Review Program Module 18A - Hvac)
- ML20078A476 + (Readiness Review Program Module 18A - Hvac)
- ML20078A483 + (Readiness Review Program Module 18B - Fire Protection)
- ML20078A492 + (Readiness Review Program Module 18C - Dgs)
- ML20078A495 + (Readiness Review Program Module 19 - Electrical Supports)
- ML20078A365 + (Readiness Review Program Module 2 - Operations Training & Qualification)
- ML20078A622 + (Readiness Review Program Module 20 - Instrumentation & Controls)
- ML20078A507 + (Readiness Review Program Module 20 - Instrumentation & Controls)
- ML20078A555 + (Readiness Review Program Module 4 - Mechanical Equipment & Piping)
- ML20078A385 + (Readiness Review Program Module 5 - Operations,Organization & Administration)
- ML20078A566 + (Readiness Review Program Module 6 - Electrical Equipment)
- ML20078A396 + (Readiness Review Program Module 6 - Electrical Equipment)
- ML20078A410 + (Readiness Review Program Module 9A - Radiological Protection)
- ML20078A418 + (Readiness Review Program Module 9B - Chemistry)
- ML20078A447 + (Readiness Review Program Moldule 13B - Coatings, Program)
- IR 05000424/1986080 + (Readiness Review Rept 50-424/86-80 on 860512-0808 Re Module App G, Measuring & Test Equipment. Conditionally Unacceptable Items Noted,Including Lack of Activity Logs or Usage Records for Automatic Welding Machine)
- ML20006A314 + (Readiness Review.* Discusses Number of Serious Potential Defects in Design & Const of Plant That Need to Be Addressed & Resolved Before Commission Concludes That Reactor Ready to Operate.Supporting Documentation Encl)
- ML20006F439 + (Readiness Review.* Requests Board to Consider Stated Written Views of Attachments to NRC 900108 & 09 Ltrs Due to Intervenors Not Receiving Documents Until Afternoon of 900118 & After Commission Meeting Ended.W/Related Info)
- ML20235S103 + (Readiness Review.Assessment of Georgia Power Company Readiness Review Pilot Program)
- ML092260141 + (Readiness for 95001 Inspection)
- ML081710384 + (Readiness for 95001 Inspection)
- PNP 2015-056, Readiness for 95001 Inspection + (Readiness for 95001 Inspection)
- PNP 2012-045, Readiness for 95001 Inspection + (Readiness for 95001 Inspection)