PNP 2015-056, Readiness for 95001 Inspection

From kanterella
Jump to navigation Jump to search
Readiness for 95001 Inspection
ML15201A462
Person / Time
Site: Palisades  Entergy icon.png
Issue date: 07/20/2015
From: Hardy J
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
EA-14-168, IR 2015007, PNP 2015-056
Download: ML15201A462 (2)


Text

,.Entergy

.=::.

Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert. MI 49043 2697642000 Jeffery A. Hardy Regulatory Assurance Manager PNP 2015-056 EA-14-168 July 20, 2015 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Palisades Nuclear Plant Readiness for 95001 Inspection Palisades Nuclear Plant Dockets 50-255 and 72-7 License No. DPR-20

References:

1. Letter from Nuclear Regulatory Commission dated December 2, 2014, "Palisades Nuclear Plant, NRC Inspection Report 05000255/2014010, Preliminary White Finding"
2. Letter from Entergy Nuclear Operations, Inc. dated December 10, 2014, "10-Day Response to IR 2014010 Preliminary White Finding"
3. Letter from Nuclear Regulatory Commission dated February 23, 2015, "Final Significance Determination of White Finding with Assessment Follow-up and Notice of Violation; NRC Inspection Report No. 05000255/2015007; Palisades Nuclear Plant"
4. Letter from Entergy Nuclear Operations, Inc. dated March 25, 2015, "Reply to Apparent Violation, EA-14-168"

Dear Sir or Madam:

On February 23, 2015, the Nuclear Regulatory Commission (NRC) issued a greater than green finding to Entergy Nuclear Operations, Inc. (ENO) for a violation of radiation protection activities at the Palisades Nuclear Plant (PNP) (Reference 3).

The NRC requested that ENO provide notification when PNP is prepared to undergo the supplemental 95001 inspection to review the root cause and actions taken in response to the violation. This letter provides notification that ENO is prepared for that inspection.

PNP 2015-056 Document Control Desk Page 2 This letter contains no new commitments and no revision to existing commitments.

Sincerely, JAH /bed CC Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC