Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20238C599 + (QA Program Insp Rept 99901094/87-01 on 870706-08. Nonconformance Noted.Major Areas Inspected:Records Re Supply of 200 Class 1E Circuit Breakers to Farley Nuclear Plant & QA Program)
- ML20006B060 + (QA Program Insp Rept 99901145/89-01 on 890911-12.No Violations,Noncompliance or Unresolved Items Noted.Major Areas Inspected:Followup to 10CFR21 Rept, Re Supplying of Nongenuine Masonneilan-Dresser Valve Parts)
- ML20147G540 + (QA Program Insp Rept 99902006/87-01 on 871230.No Violations, Nonconformances or Unresolved Items Noted.Major Areas Inspected:Audit,Including Detailed Review of Screening Files for 10 Employees Hired Since Feb 1987)
- ML19270H123 + (QA Program Insp Rept 9990503-79-01 on 790411.No Noncompliance Noted.Major Areas Inspected:Implementation of Rept B&Roe COM-NP-1A,including Initial Mgt Meeting)
- ML20031B733 + (QA Program Insp Rept 99990001/81-05 on 810430-0501,04,05 & 06.Noncompliance Noted:Radioactive Matl Exists as Contamination in Three Areas of Maywood,Nj)
- ML20040C871 + (QA Program Insp Rept 99990001/81-14 on 810624-25. Noncompliance Noted:Licensee Possessed & Used Ir-192 Sources Contained in Radiography Exposure Devices in Us W/O Valid NRC License)
- ML20236S348 + (QA Program Insp Rept 99990003/87-06 on 870624-1026. Violations Noted.Major Areas Inspected:Licensed Program Re 870624 Notification of Lost Nuclear Static Eliminators, Licensee Recovery Efforts & Licensee Corrective Actions)
- ML19309B391 + (QA Program Insp Rept 99990004/80-01 on 800122-23.No Noncompliance Noted.Major Areas Inspected:Radiological Evaluations Conducted in Moab,Ut)
- ML20005B635 + (QA Program Insp Rept 99990004/81-02 on 810519.No Noncompliance Noted.Major Areas Inspected:Activities of Southwest X-Ray Corp Considered Radiological Hazards)
- ML20052D916 + (QA Program Insp Rept 99990004/82-01 on 820217-19. Noncompliance Noted:Written Procedures Not Completed & Approved by Mgt for Use in Radiochemistry Lab & No Formal Training or Training Outside State Health Lab Occurred)
- ML20052H701 + (QA Program Insp Rept 99990004/82-02 on 820222-24.No Noncompliance Noted.Major Areas Inspected:Organization & Mgt Support,Sample Collection & Analytical Procedures, Facilities & Counting Instrumentation)
- ML20050B147 + (QA Program Insp Rept 99990004/82-03 on 820216.No Noncompliance Noted.Major Areas Inspected:Terms of Environ Monitoring Contract,Mgt Support,Organizational Structure, Technical Staff Training & Experience)
- ML20039A398 + (QA Program Insp Rept 99990005/79-04 on 790717-20.Major Areas Inspected:Radiation Level Measurements & Checks for Removable Contamination on Six Containers Repackaged in Argonne Waste Bins)
- ML19275A148 + (QA Program Insp Rept 99990005/79-04 on 790717-20.No Noncompliance Noted.Major Areas Inspected:Observation of Shipments Arriving at Facility After Governor Signed Order Reopening Site)
- ML20030C115 + (QA Program Insp Rept 99990005/81-01 on 810706-10. Noncompliance Noted:Low Level Contamination Found in Bldgs 131,782,331,305 & Between Bldgs 331 & 332)
- ML20039C670 + (QA Program Insp Rept 99990080/81-04 on 811209.No Noncompliance Noted.Major Areas inspected:in-transit Physical Security Measures for Shipment of Ssnm.Details Withheld (Ref 10CFR2.790))
- ML20039C664 + (QA Program Insp Rept 99990080/81-05 on 811209-12.No Noncompliance Noted.Major Areas Inspected:General SSNM Road Shipment Requirements & Planned in-transit Physical Security Measures.Details Withheld (Ref 10CFR2.790))
- ML19340B108 + (QA Program Insp Repts 99900092/80-01 & 71-9016/80-01 on 800707-11.Noncompliance Noted:Testing of Completed Products Documents Did Not Address Specs Required by QA Manual & App E)
- ML19323G518 + (QA Program Insp Repts 99900382/80-01 & 71-9001/80-01 on 800225-29.Noncompliance Noted:Six Categories of Records Not on File,Cask 301 Not Hydrostatically Tested to 600 Psig)
- ML19345H325 + (QA Program Investigation Rept 99900109/80-02 on 801112-14.No Noncompliance Noted.Major Areas Investigated:Allegations That Lost or Damaged Shop Travelers on nuclear-related Work Falsified When Reconstructed)
- ML20054E909 + (QA Program Investigation Rept 99900345/82-01 on 820104-29. No Noncompliance Noted.Major Areas Inspected:Allegations Re Hayward Tyler Pump Upper Mgt Failure to Support & Enforce QA Program.Personnel Removed Documents from Main Ofc)
- ML20054E922 + (QA Program Investigation Rept 99900345/82-02 on 820125-29. Noncompliance Noted:Current & Past Training Schedules Not Consistent W/Training Requirements Identified in Exhibit I of Engineering Std 9.0.5/1-1)
- ML20010J185 + (QA Program Investigation Rept 99900400/80-05 on 810708-11 & 0806-09.No Noncompliance Noted.Major Areas Investigated: Allegations That B&W Contracted for Mfg of Gate Valves W/O Conducting Thorough Tech Evaluation,Compromising Quality)
- ML20003D873 + (QA Program Investigation Rept 99900400/80-06 on 801215-17.No Noncompliance Noted.Major Areas Investigated:Allegation That Vendor Did Not Intend to Correct Deficiencies Previously Identified by NRC)
- ML19339C424 + (QA Program Investigation Rept 99900727/80-01 on 800826-28. No Noncompliance Noted.Major Area Investigated:Allegations That Mgt Personnel Falsified Welder Qualifications)
- ML19345H625 + (QA Program Investigation Rept 99900732/80-01 on 801202-04.No Noncompliance Noted.Major Areas Investigated:Allegations That Critical Dimensions of Nuts & Bolts on Pumps Associated w/nuclear-related Work Incorrectly Examined)
- ML19270H105 + (QA Program License 20-11915-01)
- ML20126H490 + (QA Program Manual)
- ML20217M895 + (QA Program Manual)
- ML20202D844 + (QA Program Manual)
- ML19254F573 + (QA Program Manual)
- ML19209C470 + (QA Program Manual Re Mfg of Nuclear Equipment)
- ML20078C113 + (QA Program Manual Updates from Period 921216-941007)
- ML20071A613 + (QA Program Manual for Midland Nuclear Plant, Vol 1,Rev 13)
- ML20052F279 + (QA Program Manual for Midland Nuclear Plant,Vol 1)
- ML19269C497 + (QA Program Manual for Nuclear Power Plants,Vol 1-- Policies, CPC-1-A Revision 7,dtd 781222)
- ML19309G808 + (QA Program Manual for Nuclear Power Plants, Vol 1 - Policies,Revision 9)
- ML19290E856 + (QA Program Manual for Nuclear Power Plants, Vol 1, Revision 8)
- ML19259B161 + (QA Program Manual for Radioactive Matl Shipping Packages Provided in Response to 10CFR71)
- ML19284A894 + (QA Program Manual, Revision 8)
- ML20199B994 + (QA Program Manual, Updates for Period 960502-971231)
- ML20039B712 + (QA Program Manual,Vol 1,policies.Revision 11)
- ML19249E947 + (QA Program Mgt Audit Requirements)
- ML20062H303 + (QA Program Mgt Corrective Action Rept 33:tendons in Containment Bldg Found to Have Unknown Wire Lengths.Caused by Manufacturer & QA Program Errors.Production Equipment & QA Procedures Being Corrected)
- ML20053D600 + (QA Program Mgt Corrective Action Repts,Noncompliance Repts, Quality Action Requests & Audit Finding Repts)
- ML20066A858 + (QA Program Operations Phase)
- ML20245J750 + (QA Program Organization Chart for Mason & Hanger-Silas Mason Co,Inc)
- ML20034A541 + (QA Program Package 0365)
- ML20246H306 + (QA Program Part III for Type B Quality Shipments of Radioactive Matl)
- ML19289D846 + (QA Program Per 10CFR71)
- ML19350D379 + (QA Program Per 10CFR71 for Industrial Radiography Licensees)
- ML20196E738 + (QA Program Plan)
- ML20207G041 + (QA Program Plan)
- ML19332G380 + (QA Program Plan)