x'\\

NHD-TR-005

[

b

\\

zg 03.

g;yt0D N

g

'\\

&t' o.LJ.Jl<P l'

  • f /

,8 h.Y,y}

,9 4

~

if l' % ;~

~

i QUALITY ASSURANCE PROGRAM PLAPL; 3'

.4

.(

' 'h y '

\\

hf 4Q _

9h

<FOR THE

(

Wg-4 s

~,

L.'. s

~

w WESTINGHOUSE ELECTRIC CCHNORATION s

s.

q 1

Nt' 'LUAN FUEL BUSINEdS UNIT l

s j

s NdCLEAR WASTE bEPARTMENT,

3

!g 3

J q;

'r February 1988 9,'t x

d !N OV 3

' M e n u h h~ ',_

Approved b :

i

/. H. Hamilton, Jr.

s Manager, Nuclear Waste Depar'. ment Nuclear Fuel Business Unit Approved by:~S Y [A R. R. Cost Manager, Quality Assurance Commercial Nuclear Fuel Division Nuclear Fuel Busineos Unit

\\

b,h 0 4

b g

pI WESTINGHOUSE ELECTRIC COMPORATION f

Nuclear Fuel Business Unit Nuclear Waste Departrnent P. O. Box 3912 Pittsburgh, PA 15230

/

[

9 O

8803010768 880219 O

PDR ADOCK 071*****

C PDR y

q

\\

0116H:6-880218

\\

s

--y y

y

,y y

a o '

.NHD-TR-005 s@

~

.\\..;

N'NL TABLE OF CONTENTS Section Title fagt

+,.

1.0 ORGANIZATION 1

s 1.1 General 1

l.2 NHD Organization 1

? b.(

1.2.1 Quality Assurance Manager 1

1.2.2 Project Manager 2

1.2.3 Engineering 2

1.2.4 Purchasing 2

2.0 QUALITY ASSURANCE PROGRAM 4

4 K

?.. I General 4

2.2 Qual.ity Assurance Progrea Plan 4

'.3

'Cohtract Administration 5

2

... s b

2.4 Implementing Procedures 5

2.4.1 hWD Quality' Assurance Manual 5

2.4.2 NHO Procedures 6

~.

i 3

,s 2.5 Training and Indoctrination 6

2.6 NuiigomentReview 7

- x 3.0 DESIGNCONTROL 11 3.1 General 11 3.2 Design Process 11 3.3 Design Verifkation 12 3.4 Design ileviews 12

-w*

r i

s

..___-,_,.-..\\*.a,..

i NHO-TR-005 TABLE OF CONTENTS Section Title P_ asst 3.5 Design Analysis 13 3.6 Design Change Control 13 4.0 PROCUREMENT DOCUMENT CONTROL 15 4.1 General 15 4.2 Procurement Documents 15 4.3 Purchase Requisition Requirements 15 4.3.1 Supplier Quality Assurance Program Requirements 15 4.3.2 Technical Requirements 16 4.3.3 Documentation Requirements 16 4.3.4 Lower Tier Procurement 16 4.3.5 Spare and Replacement Parts 16 O

5.0 INSTRUCTIONS, PROCEDURES AND DRAHINGS 17 5.1 General 17 5.2 Scope and Appilcability 17 5.3 NhD Instructions, Procedures and Drawings 17

)

5.3.1 Quality Assurance Activities 18 5.3.2 Product Inspection Activities 18 5.3.3 Project Management Activities 18

{

5.3.4 Engineering Activities 18 5.3.5 Purchasing Activities 19 l

I 6.0 DOCUMENT CONTROL 20 i

6.1 General 20 6.2 Control Responsibilities 20 6.3 Use of Proper and Current Documents 20 11 0116H:6-880218 i

t

-.. -. ~ - - - -

NH0-TR-005 TABLE OF CONTENTS (Continued)

Section Title EAg.t 7.0 CONTROL 0F PURCHASED ITEMS AND SERVICES 21 7.1 General 21 7.2 Procurement Planning 21 7.3 Selection of Suppliers 22 7.4 Supplier Surveillance 22 7.5 Supplier Generated Documents 22 7.6 Acceptance of Items 22 7.6.1 Certificate of Conformance 23 7.6.2 Source Verification 23 7.6.3 Receiving Inspection 23 7.6.4 Post-Installation Tests 23 7.7 Acceptance of Services 24 O

7.8 Supplier'Nonconformances 24 7.9 Commercial Grade Items 24 8.0 IDENTIFICATION AND CONTROL OF MATERIALS, PARTS AND COMPONENTS 25 8.1 General 25 8.2 In-Process Identification and Control 25 8.2.1 Hardware Identification and Control 25 8.2.2 Nonconformance Identification 25 8.3 End Item Equipment Identification 26 9.0 CONTROL OF PROCESSES 27 8

9.1 General 27

.9. 2 Purchased Materials and Parts 27 111 0116H:6-880218

~.

NHD-TR-005

. TABLE OF CONTENTS (Continued)

Section Title P_aga

-10.0 INSPECTION 28 10.1 General 28 10.2 Inspection Planning 28 10.3 Personnel Indoctrination and Training 29

'10.4 Inspection Records

-29 11.0 TEST CONTROL 30 11.1 General

-30 11.2 Test Planning and Application 30 11.3 Documentation of Test Results 31 12.0 CONTROL OF MEASURING AND TEST EQUIPMENT 32

' 13.0 HANDLING, STORAGE, AND SHIPPING 33 i

13.1 General 33 13.2 Purchased Components Equipment and Haterials-33 13.3 Handling, Storage and Shipping 33 13.3.1 Handling 34 i

13.3.2 Preservation, Packaging and Storage 34 13.3.3 Cleaning 34 13.3.4 Classification and Planning 34 l

13.3.5 Implementation 34 14.0 INSPECTION, TEST, AND OPERATING STATUS 35 14.1 General 35 14.2 Procured Equipment and Material 35 O

tv 0116H:6-880218

1 NHO-TR-005-TABLE OF CONTENTS (Continued)

O

- Section Title P_ Age 15.0 CONTROL OF NONCONFORMING ITEMS 36 15.1 General 36 16.0 CORRECTIVE ACTION 37 16.1 General 37 16.2 Corrective Action Program 37 17.0 QUALITY ASSURANCE RECORDS 39 17.1 General 39 17.2 Records Administration 39 17.2.1 Records Systems 39 17.2.2 Generation of Records 39 17.2.3 Record Validation 39 17.2.4 Index 40 17.2.5 Distribution

- 40 17.2.6 Identification 40 17.2.7 Classification 40 17.2.8 Retention of Records 40 f

17.2.9 Corrected Information in Records 40 17.2.10 Lost or Damaged Records 41 17.3 Receipt 41 I

17.4 Storage, Preservation and Safekeeping 41 17.4.1 Storage 41 17.4.2 Preservation 41 O

v 0116H:6-880218 a

,_,,,.__m,

_.., _..,,_,.m,_

NHD-TR-005 TABLE OF CONTENTS (Continued)

O Section Title East i

17.4.3' Safekeeping 42:

17.4.4 Facility 42

-17.5 Retrieval 142:

17.6-Disposition

-42 18.0 AUDITS 43 18.1 General 43 18.2 Audit Planning 43 18.3 Auditor Training 44 18.4 Audit Scope 44 18.5 Audit Reporting and Corrective Action 44 18.6 External Audits 45

,l 4

W 4

i i

.1 i

J i

4 l

vi l

l.

Oll6H:6-880218 a---w a

-+--=

  • w ww w.e y ww m-wemvo- -m a -w e m w r,e w, em:

,,w--qw+.

--%--4

,,s-s=,e-.e,+w,y, g m yg i amm%gy4 ewe y- -y mpg wy

NHO-TR-005 1.0 ORGANIZATION 1.1 Genen1 This section describes the major organizational units within the Nuclear Haste Department relative to their responsibilities and authorities in assuring the overall quality of the design activities and deliverables to be provided.

The Nuclear Haste Department Quality Assurance Program is structured to comply with the requirements of 10CFR50 Appendix B, "Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants," and ANSI /ASME NQA-1-1986, "Quality Assurance Program Requirements for Nuclear Facilities." Measures are provided to assure that individuals or groups assigned the responsibility for checking, auditing, inspecting or otherwise verifying that quality-related activities have been correctly performed are independent of individuals or groups responsible for performing the specific activity.

1.2 NHD Oraanization Management of the Nuclear Haste Department (NHD) is the overall responsibility of the NHD Manager, as depicted in Figure 1-1.

This responsibility includes design, procurement, fabrication and the assurance of quality of the items.and services provided by the engineering, marketing and related project activities of the Department.

The Quality Assurance and Purchasing functions are being performed by Hestinghouse organizations which are not within the Nuclear Haste Department.

The following paragraphs describe the assigned managerial responsibilities and principle functions supporting a project within NHD.

1.2.1 Quality Assurance Manager The Quality Assurance Manager is responsible for establishing systems to assure that activities which affect the quality of services or items for which NHD is contractually responsible to deliver are systematically performed and O

verified in a manner commensurate to safety and reliability.

0116H:6-880218 1

lt.

NHD-TR-005 The Quality Assurance Manager has the overall responsibility for the administration of the NHD Quality Assurance Program described in this Quality Assurance Program Plan.

The Quality Assurance Manager has the authority to enforce compItance with the provisions of NHD's Quality Assurance Manual, including the authority to disapprove drawings, specifications or other documents where quality requirements are not met.

He also has the authority to stop work or to control further operations where significant conditions adverse to quality are identified and immediate corrective actions are required.

1.2.2 Project Manager The Project Manager is responsible for: overall project management direction and coordination; system development; project control; design, fabrication and testing of special equipment and tooling; operations; and project interfaces within NHD.

O 1.2.3 Engineering The Engineering function is performed by Cognizant Technical Managers who functionally report to the Project Manager, and are responsible for the overall direction and coordination, system development, design, fabrication, and testing of special tooling, operations, end design interfaces within NHD and other Westinghouse divisions to support the engineering efforts.

1 1.2.4 Purchasing Purchasing is an "as required" support service to NHD. As depicted in Figure 1-1 a Westinghouse organization outside of NHD performs the procurement services for the NHD. As part of that NHD responsibility, Purchasing is responsible for the procurement of materials, items or services in accordance with its procurement control procedures, and is responsive to the requirements of procurement documents prepared and processed by NHD.

r 0116H:6-880218 2

m

?

E o

N Nuclear Waste Department i

i, l

I i

i Quality Projects Purchasing Assurance ta Engineering i

Legend:

- -- Indicates reporting on a matrix i

basis from Westinghouse l

organizations outside the l

Nuclear Waste Npartment I

x l

5

-4 Figure 1-1. Quality Assurant.c Program Organization Chart

?

767821 1xb g

+

w

NHD-TR-005 o

2.0 QUALITY ASSURANCE PROGRAM Q

2.1 General This section of the Quality Assurance Program Plan provides a general description of the Nuclear Haste Department (NHO) Quality Assurance Program.

This section also discusses the applications of the NHO Quality ~ Assurance Manual relative to the policies and provisions of this Plan.

Also presented herein are the basic policies regarding the indoctrination and training of the Westinghouse personnel and the methods for periodic assessments of the effectiveness of the Quality Assurance Programs and Plans.

2.2 Ouality Assurance Program Plan This Quality Assurance Program Plan describes NHD's Quality Assurance policies.

and general practices for a disciplined approach to the achievement of quality, safety and performance.

Its implementation is reviewed periodically by NHD management through consideration of audit reports and other periodic management assessments, and it is updated as necessary to incorporate new requirements or considerations or to reflect significant-changes in applicable Westinghouse or regulatory quality assurance policies or procedures.

The procedures referenced in the Quality Assurance Program Plan take the following considerations into account in establishing requirements:

o

,.e impact of failure or nalfunction of the item on safety o

The uniqueness or complexity of design and fabrication of the item o

The need~for special process controls for the item o

The demonstrability of functional compliance for the item o

The degree of standardization and quality history of the item.

O 0116H:6-880218 4

NHD-TR-005 2.3 Contract Administration The NHD Project Manager initiates appropriate actions within NHD by issuing Project Control Releases (PCRs).

PCR Change Notices are issued to implement changes and additions to those actions.

NWD Project Management directions assigning contractual scopes of work to other participating Westinghouse Divisions are defined on standard Westinghouse control documents which are reviewed and approved by Quality Assurance prior to being issued.

Such documents include appropriate Quality Assurance provisions.

2.4 Imolementing Procedures Westinghouse activities are conducted in accordance with documented procedures that require performance in a planned, controlled and disciplined manner.

These procedures provide instructions to personnel who, in the course of performing their assigned duties, engage in quality-related activities.

Table 2-1 lists the principal procedures that are applied in implementing the Quality Assurance Program.

Tre types of procedures and the responsibilities for their issuance and maintenance are described below.

2.4.1 NHD Quality Assurance Manual The Quality Assurance Manual contains Quality Assurance Procedures (QAPs) which provide direction to all cognizant personnel in conducting specific Quality Assurance activities.

These procedures are designated by the letters QAP and a unique identifying number between 1 and 18 corresponding to the eighteen criteria of IOCFR50, Appendix B, and ANSI /ASME HQA-1-1986, inclusively (e.g. QAP 1).

O Oll6H:6-880218 5

NH0-TR-005

(

All procedures in this Manual are approved by the Quality Assurance Manager.

Issuance and control of this Quality Assurance Manual is the responsibility of the Quality Assurance Department.

2.4.2 NHD Procedures Detailed implementation of specific quality-related activities is accompIlshed through NHD Procedures.

These detailed procedures are contained in the NHD Procedures Manual and are designated by the letter P and a unique identifying number between 1 and 18, inclusively (e.g. P 2.1).

The NHD Procedures are referenced in the QAPs.

The Quality Assurance Department is responsible for ensuring that applicable Quality Assurance policy requirements are reflected in these detailed procedures.

These procedures are approved by the Department Manager and the Quality Assurance Manager.

2.5 Trainino and Indoctrinati20 Management is responsible for defining required training and for ensuring that personnel are adequately indoctrinated and trained in the skills and disciplines necessary to carry out their functions in a manner to achieve appropriate levels of quality.

This includes documented indoctrination in overall Quality Assurance Program requirements in accordance with P 2.1.

Training includes as applicable, relevant industry codes and standards, relevant government regulations, procedures, special skills including special processes, and technical specifications related to the work to be performed.

Proficiency is maintained by on-the-job experience and periodic retraining when necessary.

The Quality Assurance Department is responsible for assisting with the indoctrination and training of Division personnel in the provisions of the Quality Assurance Manual.

The Quality Assurance Department is responsible for documenting the training of its cognizant personnel in functional methods such as audits, quality engineering, inspections, surveillance of fleId services, and any special processes such as nondestructive examination.

The Quality Assurance Department is also responsible for auditing the indoctrination and V

training records of the Nuclear Haste Department.

0116H:6-880218 6

NH0-TR-005 2.6 Management Review The implementaticn of NHO's. Quality Assurance Program is periodically reviewed, and the results of these reviews are provided to the Department Manager.

These reviews constitute management assessments of the effectiveness of the program including its compilance with applicable regulatory requirements and industry standards. These reviews are accomplished by one or more of the following methods:

A.

Assessments by Quality Assurance management, including reviews of quality problems and their underlying causes, analysis of trends, and reviews of other program assessment actions such as audits (internal and customer) and appilcable corrective actions.

Such assessments are presented in written reports to the Department Manager for review l

I and further action as necessary.

B.

Topical internal audits or management assessments, which may be directed by the Department Manager's staff, to assess the O

effectiveness of particular aspects of.the overall program.

C.

Documented reviews of the effectivener.s of the Quality Assurance l

Program by Hestinghouse corporate audit teams or evaluation groups i

4 with formal reports to the Department Manager.

l l

1 0116H:6-880218 7

NHD-TR-005 n). a n w/ nhJam+' /

S $ c$ $S SS S S S S$ 5 S S S S S cc g c +

<C

+

+ &

C < C S c g

/

son t casta nce i

4 s

a 7

s e

se in ta n

is is is 17 is oAP l oRGAP.a 2 A T lO=

ouai gigassva4=ca O

e

'E058.8=

,"1 RsON= E L.'#re",'"0!.'o?.".t O

a"** ";'JOs" "

e ou as pgi,tv assuma=cs 4.

aus oesm= contam o

e "ooefU"EYc"Erna O

O O

e O

O O

O O

O O

O O

O O

O O

O O

"ocE.no=Y0a=o e

o o

om asst s aus ooctm=t eo.iram e

fv7E""8Ev"cIs'"*

O e

O O

c%V4lo"?.'J e

  • ^"

w.

co=,.x o.

ocin.s a

w..,=s,.ero, o

au n vastcomram o

e

  • " " *a'r".?, L"',=^i'0**

e w n g,g,a

o. a,
  • " " o",T.'f,' *.','.','us
  • e

" " **"d 7,o". aitems O

O O

e O

o ou is cosascrive actica o

e

  • " fe!IE E * *"*'

O O

O e

g 4

J w is. vans O

O e

e pai a., co tia%cs o seconom avo(vm=t 0116H:6-880218 8

NHD-TR-005

/ / /

/

/y r

///.*ff?sV>/

//

6

/ ///

/

//

/

6/J !//

(

)

/ / >

h h,,,l /,/ h,9h h

f,k,f, *',O,!,c

,/ /,,/, ; /,

c c

c c c c c c c c c

c c c #

e c c c NQA1 CmTER Ose 1

2 3

4 5

6 Y

8 9

to 11 12 13 14 18 te 17 10 p 3.1 tesOOC T R s4 A TION.

T R Ami40. AhO QUALi7ICAYION OF e

P1RsONNIL P14 5JGasiFICAse? OuALi7Y pacetItes AasO yepusuaL OCCum a a =C E s 811 7CMeuaCAL aaPOR75 g

  1. 12 64YE Rf ACI coa TmOL e

g Da Aa mGs P14 04583 4Alvit as e

739 va na p eC A TIOes sy O

OUAL18eCAT104 7887sssG P36 t %G34 t I R ' erg CM ANGE O

8eofic tl e3s Os s4 = OOCura= T A Tear g

mapOmis F39 v t eef eCA f tose OOCUtst 4Y AY DOAs A40 CO*8 80uRA T pose con 7 a04 g

/m.'A 08 ? tCMessC AL COM*uf e n

[

{

P#OG A atal

(

/

P 110 ACessm eT R ATIO4 08 ei.onetamoA=O Scit h?t8 8C COMPUTs e e

enOonAMs P111 e tCMa lCAL RICORO e

soOss e

ea1 Ou Auf, assuaa nsC s at wit = o8 E n.o mt I ai=G g

DeaamesA=O

%Pf C isg A ws

  • 1is ataOafsas

& TT ar Mast m TS TO g

L t TT E pl eAi evacesAst asouisifiOa.s O

O O

e o

o o

o O O O

O O

O O

O O

O O

PE9 CutYOast a CO8e TRACT ts AA AGE t e t A hD s

g CO8e T ROL FS2 ##0ACT COseTROL O

et L E Asil es3 enIeA mATtoss AnO g

Coa TROL 08 Da Aan%G3 s

p$4 8 %G sht I A itsG

$71 CI F IC A T IO8st e

est

%.s.A,t.ifv assua A=Ca e

veto OuAuf,ai.u.a CI M A ssual P4 0C E OVit(.S e

i

)

tv<

..OC.O,v.ati A uAL o

e

..Y

..OCIcu a.

e.. MA., CO L. A E o..CO OA.,,,,m.

.?

0116H:6-880218 9

NHO-TR-005 I

///

//

'#/.d/ /

t

</ / / /f t//

i t i, t p /ys>//

,/,/.,

~

/ / /,'/ / p /f f,' >/ / f,f 44 / / /,

d a i v

f.i go?/

i 9? 5

$ 5ss s8 5 S S !

a 9 s5 s5 c c c cc c c c-c c c c c c e c c c #

j

.i e.ni.

i i.

i, n

n i.

i.

i.

o is i

W.'EO o*Cuest.15 e

C.GasittRiset o 9s.

styten acCoAO e

g.1.u

. m

,n 4

gg u.e no g

1 O

7 o

teatt at AL r

, i.,

uct t cre.

e i

1 e is t vanta.co meovests g

o i

f j

7'3" '*' '" *"

e o

W.",:'T'"

o e

i i

g u g,.eco.a.

,u,n

  • " ' M....A...,',f,,".".%'.8 e

j e is miten=46 avons o

e 1

5 J

ein un 6.vo.n o

1 e as sueeven avoirs o

e i

a

?

e j

e e.asAa, connu4=ce o ucca oaar e=vo6vewe=t i

i 1

4 0116H:6-8802IB 10

.- - - ~.2

,m,

,,,,_.,r

NHD-TR-005 3.0 DESIGN CONTROL 3.1 General This section contains.the provisions for controlling designs and changes to designs so that all license and contract requirements, including functional requir1ments, regulatory requirements, codes and standards are correctly incorporated into specifications, drawings, test plans, procedures and other engineering documents.

Design activities and interfaces are governed by written procedures that provide necessary design control.

Changes to approved designs are subject to control measures commensurate with those applied to the original design.

The procedures provide methods for controlling design-related activities such as: review of customer requirements; establishment of functional specifications; selection of codes and '.tand?rds; c'esign processes; verification of the adequacy of design, design changes, design interfaces; and, where applicable, a description of the design interfaces with design contractors. Customer documented design input data and

(~

changes thereto are supplied to engineering by the Project Manager via PCRs.

3.2 Desian Process The design process is governed by procedures and implemented by the Project Manager.

The process normally starts with the development of functional requirements (usually in the form of functional design criteria and preliminary drawings) prepared to meet the design input requirements defined in, or referenced in, a contract technical specification.

The functional requirements include technical, regulatory, maintenance, customer, etc.,

requirements. Materials, parts, equipment or processes essential to the maintenance of safety-related functions are reviewed for suitability of application.

Data collected from others for use in the design process, other than that acquired from nationally recognized standards and specifica1ons (ASTM, ANSI, IEEE, ASME, etc.), is acquired or produced under a quality assurance program O

Oll6H:6-880218 11

NHD-TR-005 O

that meets the requirements of ANSI /ASME NQA-1-1986 with supplements or is subjected-to the design verification process (Section 3.3) prior to being finally accepted as valid.

Data not validated at the time of collection is identified.

Engineering Specifications (E-Specs), when required, are prepared in accordance with documented procedures.

E-Specs are reviewed and approved by cognizant departments including Quality Assurance.

3.3 Desian Verification Designs are verified by one or more of the following methods, as appropriate to the circumstance:

A.

Documented design reviews conducted in accordance with procedures.

O\\

B.

Alternate calculation method (s) and independent review (s) by a quallfled individual (s) other than those who performed the original calculations.

C.

Tests to verify adequacy of the design to perform under most adverse conditions specified for the design. Tests are controlled in accordance with Section 11.0 of this QAPP.

The selection, review and approval of design verification methods for a specific design is the responsibility of, and is documented by, the cognizant technical manager.

3.4 Design Reviews Design reviews may be employed as a means of design verification for a design or part of a design. Design reviews typically consider the design's ability to meet functional requirements, safety, quality level requirements, reliability and practicality of fabrication, utilization and maintenance.

0116H:6-880218 12

NWO-TR-005 i

The scope and the scheduling of the reviews are based on many considerations including whether or not the equipment is of a new design, the importance of the item to safety, availability and performance and previous experience with the equipment or similar types of equipment and the quality level of the item. The responsibility for determining the need for a design review rests with the Project Manager with input from other departments, as appropriate.

The design reviews are conducted and documented in accordance with written procedures which require assignment of responsibill:les for action on open items and resolution of open items.

Formal documented follow-up is performed by the design review chairman.

3.5 Deslan Analysis Design analyses are performed in a planned and controlled manner to assure that the analyses support the design effort.

Essential computer software used in the design analyses are controlled per department procedures.

This control includes verification, administration, documentation and configuration control d

of computer codes and programs. Design analyses are documented in accordance with the requirements of department procedures which meet the requirements of ANSI /ASME NQA-1-1986, Supplement 35-1, paragraph 3.1.

3.6 Desian Chance Control Fo11cwing initial review and approval, all documentation describing design inputs, quality requirements, final design configuration, design analyses and design verification is placed under change control.

The revision to approved design documents is reviewed and approved by the same organizations which approved the original release or by those to whom this responsibility has been transferred.

Design change is initiated in accordance with procedures by the engineer recognizing the need for change.

If the change impacts the conditions specified in the NRC approval of this Quality Assurance Program Plan, then NRC approval of the change will be obtained prior to implementation.

U 0116H:6-880218 13 l

i

-NNO-TR-005' I

The Cognizant Technical Manager is responsible for evaluating and executing-design changes and-for maintaining design descriptions ~ current by incorporation of changes into drawings, specifications and other documents.

I r

i 4

i l

I I

i i

1 4

i i

1 1

f i

i i

4 1

1 i

l 4;-

0116H:6-880218 14 i

---,,,,~..,-,,,--n.c,4------.,,-.L..,--.~-.~,,,-..-

- - -. -,. _ -. - -..,, - -.. - ~ - -, -.

NH0-TR-005

(

4.0 M0CUREMENT DOCUMENT CONTROL 4.1 General This section describes the policies for generating and controlling procurement documents to ensure the incorporation of applicable technical and quality requirements.

These policies include provisions for independent reviews and documentation thereof to assure that requirements are properly specified; determine the need for changing design criteria; and resolve exceptions taken by the su% Ier.

4.2 Procurement Documents NWD procurement actions are initiated by means of purchase requisitions in accordance with estdblished procedures. Changes to procurement documents are initiated by purchase requisition change notices and are reviewed and approved in the same manner as the original purchasing document.

O 4.3 Purchase Reauisition Reautrementi In addition to defining the scope of work to be performed by the supplier, procurement documents include the following requirements, as applicable:

4.3.1 Supplier Quality Assurance Program Requirements The supplier is required to have a documented quality assurance program to the extent appropriate for the type and use of the item or service being procured.

NHO reviews the documented supplier quality assurance program to establish that the program is sufficient to meet the needs of the item or service being procured per Quality Assurance document 6J procedures.

9 O

0116H:6-880218 15 I

.--=-,,g,e--

,e

-r,-

t NH0-TR-005 4.3.2 Technical Requirements

-Procurement documents specify-as applicable a) drawings, specifications, industry codes and standards with applicable revision dates; b)-test, inspection, and acceptance requirements;:and c)'special~ instruction; and

. j requirements for designing, verifying, fabricating, cleaning, erecting, mockup

-testing, packaging, handling and shipping.

4.3.3 Documentation Requirements Procurement documentation requirements include provisions for the preparation, maintenance and availability for review (or submittal) of records such as:

drawings; specifications; procedures; procurement documents; inspection-and test records; personnel, procedure and equipment qualifications; chemical and physical test results.

Procurement documentation identifies documentation to be submitted to NWO for information, review, or approval, and the schedules for such submittals.

Provisions are also made for suppliers reporting nonconformances to procurement requirements for NHD disposition. Where data are important, procurement documentation _ requirements also include provisions for instructions on record retention and disposition.

4.3.4 Lower Tier Procurement This provision involves the extension of applicable requirements of procurement documents to lower tier subcontractors and suppilars, including right of access by Westinghouse and its customers to facilities and records for surveillance or audit purposes.

4.3.5 Spare and Replacement Parts Where appropriate, the procurement documents require the supplier to identify the need for adequate spare and replacement parts, including all technical and quality-related specifications for ordering such parts.

O 0116H:6-880218 16

NHD-TR-005 N

5.0 INSTRUCTIONS, PROCEDURES AND DRAHINGS 5.1 General Activities affecting quality of products and services are carried out in accordance with written instructions, procedures and drcwings.

5.2 Scoce and Aqplicab111tv Hritten procedures, instructions or drawings are prepared to cover work within the scope of the contract.

For each of the 18 ANSI /ASME NQA-1-1986 quality assurance criteria, the primary procedural requirements involved are listed in Table 2-1 of Section 2.0.

These documents provide direction for activities affecting quality to be performed in proper sequence and under controlled conditions. They provide for independent verification for acceptibility against documented quantitative and qualitative acceptance criteria to

[

demonstrate satisfactory accomplishment.

Quality requirements are contained in documents such as engineering specifications, drawings, purchase orders and technical procedures (which include equipment test procedures, equipment preparation and maintenance procedures).

Controls over issuance, approval, change and distribution of instructions, procedures and drawings are covered under Section 6.0, Document Control.

5.3 NHD Instructions. Procedures and Drawinas Throughout the design, manufacturing, inspection and testing phases, activities and operations affecting quality are controlled through the use of.

I approved drawings, specifications, instructions and procedures which are generated in accordance with procedures contained in the Procedures Manual, and the Quality Assurance Manual.

Drawings, specifications, instructions and procedures define appropriate qualitative and quantitative acceptance criteria consistent with specific items and services, and applicable parametric limits for processes and test methods with respect to dimensions, tolerances and operating limits.

Oll6H:6-880218 17

NH0-TR-005 5.3.1 Quality-related Activities Quality-related activities are conducted in accordance with the Quality Assurance Manual to assure that actions are planned and accomplished in a systematic manner as necessary to provide items, services, activities and valid test and program data that are in compliance with applicable requirements. These responsibilities include reviewing, approving and auditing the implementation of procedures, drawings and other documents.

5.3.2 Product Inspection Activities inspections of components and equipment are performed by qualified organizations for NWD. NHD requires that the inspection be performed and documented per written procedures which' meet the requirements of ANSI /ASME NQA-1-1986, Supplement 10S-1.

These requirements for the inspection process are passed on to suppliers via the purchase order.

5 Quality Assurance Instructions (QAls) may be issued to direct general inspection of items and services. QAIs define, where applicable, the characteristic or detail to be inspected, and the tools, gauges or test equipment necessary to perform the inspection.

5.3.3 Project Management Activities 4

NHD project management-related activities are governed by appropriate i

procedures including those directing preparation, review, approval and distribution of documents pertinent to the receipt and dissemination of contractual requirements.

5.3.4 Engineering Activities Engineering activities are governed by NHD Procedures.

Review and approval of design details and information, design analyses, test reports, drawings and specifications, and changes thereto, are utilized as a means of assuring that p

required activities have been completed and have been performed in accordance 4

d with requirements.

0116H:6-880218 18

u NWD-TR-005 1

5.3.5 _ Purchasing Activitie's i-Purchas1'g activities are governed by the' applicable Purchasing Department' n

Procedures and,are documented in the Purchasing Department Manual.

I 1

4 1

i

.l l

l' i

i t

i i

LO i

i 4

J 1

l i.

4 i

i a

}

i l

1 1

0116W:6-880218-19 I.

NHD-TR-005 6.0 DOCUMENT CONTROL J

6.1 General NHD Quality Assurance Procedures (QAPs) delineate the systems for preparing, reviewing, approving, releasing and distributing documents affecting quality, including changes, by identified authorized personnel.

The Project Manager specifies those documents requiring a controlled distribution. Changes.are approved by the same groups that reviewed and approved the original or by those to whom the responsibility has been transferred.

l Applicable control documents such as instructions, procedures, and drawings are available at the location where the activity is being performed.

~

62 Control Resoonsibilities Document control is vested in the functional groups of the organization.

Each of these groups controls the distribution of documentation that originates O

within its functional area of responsibility.

In addition, the' functional group reviews and approves documents which originate in other organizations and contain mattars affecting that functional. group.

Approved changes are incorporated into controlled documents prior to use.

The Quality Assurance Department reviews and approves documents pertinent to this QAPP including drawings, specifications, procedures, purchasing requisitionr and inspection and test documents used in the design, procurement, manufacture, testing and delivery of items to be delivered.

6.3 Use of Procer and Current Documents Engineering drawings and document lists are issued under the direction of Cognizant Technical Manager.

These master lists are updated and distributed to predetermined, responsible personnel as required to preclude-the use of superseded documents.

For the purposes of document and item effectivity and g

configuration control, each document list identifies revisions of documents to V

be used in specific appilcations.

2 0116H:6-880218 20 i

. ~.

n.

/

/,

NWD-TR-005 f

,s-7.0 CONTROL OF PURCHASED ITEMS AND SERVICES 7.1 General This section describes the measures that assure items and services purchased by NWD conform to contractual regulatory and quality requirements.

' These measures include, as appropriate, procurement planning, source evaluation and selection, review of objective evidence of quality furnished by the supplier, inspection and audit at the source, and receiving inspection of the items upon delivery, and apply to procurements inititted by NHD as gel,1 as procurements inftiated by NHO's suppliers.

TheQualityAssuranceDeparteMt in NHO plans and executes the quality assurance actions necessary to assure tha't material, equipment and services procured meet the specified requirements.

i Theprovisionsofthissectionapplytoprocurementofmaterial,equipmentand services except for a) standard supplies or services of a non-complex nature or considered non-critical with respect to cuality of Westinghouse services or equipment; and b) services of personnel where no special skills apply.

j 7.2 Procurement Plannina Procurement activities are planned and documented to assure a systematic approach to the procurement process. As appropriate, the planning activities identify the procurement methods to be used, the sequence of actions and milestones indicating completion, and the preparation _of applic3hle procedures for the following:

o Procurement document preparation, review and change control o Source and bid evaluation and award o Control of supplier performance o Surveillance, inspection or audit activities, including hold and witness points o Control of ncnconformances and corrective action o Acceptance criteria O

V o Quality assu'rance records Oll6H:6-880218 21 r

~.

-u.,

~

, 4..N

- NWO-IR-005 t

s 7.3 Selection of Suco11ers 3

Materials,equipmentandservicesforspecificqualitylev'eblteWare procured only from suppliers capable of providing those iteN or services in accordance with the requirements of the procurtment documen:s.

Podridal suppliers are evaluated prior to placemedt of a purchaseqder byjerhndel from cognizant Purchasing, Project Management, Engineer 1rkkand Qdality i

Assurance groups.

The evalcation is conducted in accordance with documented procedures,andconsidersthes$' lier'spersonnel, prod 6ctiohcapabilityand p

3, past performance. Deficiencies cr-unacceptable quality conditions are

~

resolved, or commitments for resolueign;are obtained, before O dontract is awarded.

[~

l 7.4 Sucolier Surveillance

\\

Surveillance of suppliers is performed, as apprcpriate for the requirements of the purchase order, to verify compilanci; Surveillance may be carried out t

during fabrication, inspection, tilting or shipment.

Surye111ance res65ts, including any deficiencies identified, are documented and evaluated to' assess the effectiveness of the supplier's quality assurance program.

7.5 Sucolier-Generated DerJTiati y

Supplier-generated documents are controlled, handled and a9 proved in accordance with written procedures. Measures are priscribed to provide.for the acquisition, processing and recorded evaluhtion of technical, inspection

and test data against acqeptance criteria.

7,6 Accentance of Itas

I The acceptability of procured items is established by means of a Supplier l

Certificate of Conformance, source verificat Wn, receiving inspection or post-installation te: ting, or any combination thereof.

4

{

m l

0116H:6-880218 22 p

r,-

i ww-

,v

= *-*

6 w

V r7

y,

t i

NWD-TR-005 7.6.1 Certificate of Conformance s.,

The Certificate of Conformanes identifies a) the purchased items and specific.

requirements to which they codform; b) any nonconformances, together with

- refer $ncetothedocumenteddispositionofthenonconformance,andc)the cprtificationsystemandrelatedadministrativeproceduresforpreparation, uview and approval of the certificates.

The validity of Certificates of Conformance and the effectiveness of the certification system will be verified at intervals commensurate with the supplier's past quality peformance.

7.6.2 ' Source Verification Source Verification is used, commensurate with the importance and complexity

. of the item, to monitor, witness or observe inspections, tests, examinations or other specified activities.

Results are documented, and provided to NHO Hanagement and the supplier.

O 7.6.3 Receiving Inspection U

1 Purchased items are inspected on receipt as necessary to verify their conformance to procurement requi*eraents.

This inspection is performed in accordance with written instructions or procedures, and includes verification of the receipt and adequacy of supp11er documents, proper item identification and freedom from v1.ilble shipping damage. Additional inspections, such as dimensional and other physical characteristics, are performed when warranted, based on the resuits of source verification and audit activities, and on the l

quality performance demonstrated by the supplier.

7.6.4 Post-Installation Tests Requirements and sssociated documentation for post-installation testing are

pecified in the appropriate procurement documents.

l 4

0116H:6-880218 23

.,..c.,.-

NWD-TR-005 7.7 Accentance of Servien Services are accepted on the basis of a) technical verification of data pr::duced; b) surveillance or audit, or both, of the activity; c) a review of objective evidence for conformance to the procurement documents; or d) any.

combination thereof.

7.8 Sucolier Nonconformances Procedures are established, requiring each supplier to identify and document items and services that do not conform to procurement requirements, and to submit them in writing to NHD for evaluation of the disposition.

7.9 Commercial Grade Items Commercial grade items, where used, are identified in approved design and procurement documents. Alternate commercial grade items proposed by the O

supplier are submitted to the cognizant design organizattor) for approval.

Commercial grade items are procured, where warranted by their complexity and importance, from suppliers selected on the basis of evaluations described in 7.3, and are inspected on receipt as described in 7.6.3.

O 0116H:6-880218 24

-NWO-TR-005 8.0 IDENTIFICATION AND CONTROL OF MATERIALS, PARTS AND COMPONENTS 8.1 General Requirements for identification and control of materials, parts, equipment and components to meet identification requirements is directed by engineering drawings, specifications and test plans, and are implemented through use of procedures.

8.2 In-Process Identification and Control 8.2.1 Hardware Identification and Control Identification systems provide for the marking or tagging of individual items, their containers or accompanying documents with pertinent identity in a manner to permit traceability of.each item to its applicable material and release status, drawings, specifications and other appropriate technical information.

The location and the method of identification do not affect the fit, function or quality of the item being identified.

Permanent markings directly on parts of assemblies are controlled by specifications which direct the use of i

suitable marking materials and mthods and their placements, consistent with quality and service requirements of the item.

When lots are subdivided during processing, each subdivision is identified to its parent lot.

Identification requirements for suppliers are specified in purchase orders, and such identification together with the vendor certificattoo and test records, as required, are verified by Quality Assurance during supplier surveillance or receiving inspection of purchased items.

8.2.2 Nonconformance Identification f

11ecords of nonconforming disposition are identified on the controlling route f

cards, identification tags, stickers or batch records.

Nonconforming items j

are marked and controlled as described in Section 15.0.

l I

1 l

0116H:6-880218 25 i

l

~

- -. _ ~...-..-----

.. -. =...

f h

' NND-TR-005 1

l

'l 8.3 End Item Eauinment identification t

A, l

All equipment delivered is identified in accordance with specified I

requirements.

3 i-I f

i j

p

)

i I

e e

i j.

i i

l l

l@

l f

h

.l t

t o

i l

1 5

1 1

l l

1 I

e

!O I

l 0116N:6-880218 26

.=.

NND-TR-005 t

t 9.0 CONTROL OF PROCESSES.

9.1 General

)

f

' Control of special' processes, including welding, heat treating and

[

t nondestructive testing and cleaning is maintained through the procedures p

contained or referenced in the Quality. Assurance Manual.

9.2 Purchased Materials and Parts When special processes are utilized by suppliers, the design or material i

specifications and the quality assurance requirements designated for'the procurement require that critical processes be quallfled by the suppliers and that the activities be conducted by quallfled personnel, using qualified j

}

procedures in accordance with applicable codes, standards, specifications, l

~

j criteria and other special requirements.

When applicable, the purchase order i

contains requirements for NWD approval of such processes prior to production and for any changes to the processes after initial approval. When judged i

necessary by NWD, the requirements for pilot order or first-piece inspection,

{

surveillance inspections and Quality Assurance audits during production are 1

also specified.

i i

l l

1 1

4 I

O i

0116H:6-880218 27 1,

__-,---__,_,,-_--.__,r--,-,.,,,

b NH0-TR-005 hv 10.0 IN3PECTION 10.1 Geneal Activities affecting the quality of services, equipment and materials supplied by NHD are directly inspected, indirectly controlled or both as necessary, to verify conformance to applicable codes, standards, instructions, drawings, specifications and other contractual requirements.

Personnel performing inspection activities are qualified to perform the inspection, independent of those who perform the work, and their qualification is documented.

They do not report to the management directly responsible for performing the work.

10.2 Insoection Planning Inspection programs are conducted in accordance with documented procedures and requirements as defined by the Quality Assurance Manual. All pertinent engineering drawings, specificattor.s and test plans are reviewed and approved by Quality Assurance for the inclusion of quality requirements, and are used as a basis for reviewing operations routings or test plans and procedures and establishing the necessary inspection (hold) 9oints and requirements.

Inspection of material, equipment, components and assemblies is done to written procedures.

These procedures list appropriate characteristics requiring inspection, the inspection techniques to be used, acceptance criteria and recording requirements.

Inspection procedures are used in conjunction with drawings and specifications, as applicable, to :erform the required inspection.

Sampling techniques, when employed, are based on f

statistical standards and are in compliance with design requirements.

Characteristics with design-specified tolerances not amenable to direct verification inspection, such as assembly weldments, may be controlled as special processes described as in Section 9.0.

O Oll6H:6-880218 28 i

NWD-TR-005 10.3 Personnel Indoctrination and Training Material, part, assembly or facility acceptance inspections are performed by inspectors qualified in accordance with Supplements 25-1 and 2S-2 of ANSI /ASME NQA-1-1986, as applicable, who function independently of production operations personnel.

Inspectors are qualified for-specific inspection tasks by formal indoctrination

]

and training, work experience and training'by supervisors. This qualification is documented.

Inspectors performing nondestructive tests are trained and qualified for competency in their specific work efforts as described in l

established procedures.

1 10.4 Insoection Records 4

Inspection records identify the item inspected, date and type of inspection, inspector, inspection results, and appropriate reference to actions taken in connection with nonconformances.

i i

i

?

I 4

l l

t I

0116H:6-880218 29 i

1 l

NWO-TR-005

~

O 11.0 TEST CONTROL LJ 11.1 General Testing required by NHO to demonstrate satisfactory performance of services, equipment and material is conducted in accordance with written procedures.

Th'e following categories of testing are subject to this control:

A.

Tests demonstrating that system design criteria and functional requirements are satisfied.

B.

Tests ensuring operability, reliability, structural Integrity or leak tightness of components.

Where a test program is used to verify the adequacy of a-design feature in lieu of other verifying processes, such qualification testing shall be conducted under the most adverse design conditions.

11.2 Test Plannina and Acolication The Cognizant Technical Manager is responsible for defining needs for testing i

to demonstrate satisfactory performance of designed equipment or processes.

For such tests, these Cognizant Technical Managers establish and approve test plans.

These test plans, including test requirements and acceptance criteria, are documented and are reviewed and approved by other cognizant departments, including Quality Assurance.

Requirements and acceptance criteria are stated by the engineering organization responsible for the design of the item or process (in conformance with functional specification parameters) to establish a basis for determining acceptability of test results.

NHD Procedures governing tests include provisions for assuring that prerequisites for the given test have been met, that adequate instrumentation is available and used, and that necessary monitoring is performed.

O I

d 0116H:6-880218 30

NHO-TR-005 Prerequisites include such items as calibrated instrumentation, appropriate equipment, qualtfled personnel, condition of test equipment and the item to be tested, suitable environmental conditions and provisions for data acquisition.

Tests are conducted by organizations other than ilHD in accordance with an NHD prepared or approved test plan.

The test plan is used by the testing organization to develop the test procedures which include the specified requirements.

In such cases the test procedures are reviewed and approved by NHD.

11.3 Documentation of Test Results Test results are documented and evaluated by the individuals or groups responsible for the design of the item under test.

In critical or important tests, such as qualifications, independent technical review of the test results may be conducted.

. Test records identify, as a minimum, the item tested, date of test, tester or O

data recorder, type of observation, results and acceptability, actions taken in connection with deviations, and the person evaluating the test results.

In qualification and acceptance testing, the test results are reviewed against established criteria. Any deviations are resolved and the resolution documented prior to acceptance.

O 0116H:6-880218 31

NWD-TR-005

'l 12.0 CONTROL OF MEASURING AND TEST EQUIPMENT i

The control of measuring and test equipment to assure that tools, gages, instruments, and other measuring and testing devices used in activities affecting cuality are properly controlled, calibrated and adjusted to maintain accuracy is imposed on subcontractors.

The requirements of Supplement 125-1

)

to ANSI /ASME NQA-1-1986 are imposed on subcontractors as specified in j

3 i

established procedures, i

\\

l 4

i 2

i i

i i

O I

I l

l i

a t

i I

i I

4 l

l i

I

!o 0116W:6-880218 32 i

NWD-TR-005 13.0 HANDLING, STORAGE AND SHIPPING L

13.1 General l

Handling, storage and shipping activities for which NHO is responsible are j

conaucted in accordance with documented instructions, procedures and drawings as necessary to prevent damage and deterioration of items.

These instructions are developed by the cognizant engineer or by suppliers where specified in the procurement documents.

13.2 Purchased Comoonents Eautoment and Materials 1

In preparing the procurement documer.ts, the cognizant engineer is responsible for including any necessary instructions or requirements for cleaning, coating, protective packaging, shipping and storage of the items purchased.

The amount of detail of the specified requirements is dependent on the sensitivity of the item to the environment during fabrication, shipping and l

subsequent storage prior to use. General controls are specified on complex items or major procurements by invoking generic or specific quality assurance systems requirements, as appropriate.

The methods used by the supplier for packaging, handling, shipping and storage are reviewed by the cognizant i

engineer. The supplier's procedures for control of the handling, storage and shipping functions are evaluated during pre-award surveys and monitored during source surveillance as stated in Section 7.0.

13.3 Handlina. Storage and Shiocina Following procurement, items are handled, packaged, cleaned and stored in a l

manner to prevent damage, deterioration or loss.

The amount of detail of the specified requirements is dependent on the sensitivity of the item to the environment during testing, fabrication, shipping or storage.

4 I

Oll6H:6-880218 33 I

NWO-TR-005 13.3.1 Handling Components and assemblies are handled in such a manner as to minimize possible damage.

Special lifting tools, as required, are inspected and functionally i

tested to drawing requirements. Handling and storage of assemblies during fabrication and test facility operations are conducted in accordance witn operating instructions.

13.3.2 Preservation, Packaging and Storage In-process or completed items, assemblies and test samples are packaged and stored in accordance with NWO requirements.

13.3.3 Cleaning Components and hardware are thoroughly cleaned in accordance with established procedures and after cleaning and visual inspection, are appropriately packaged.

13.3.4 Classification and Planning l

Appropriate shipping procedures and containers are developed for items j

susceptible to damage to provide protective measures to prevent damage, deterioration during packaging and shipping.

I 13.3.5 Implementation The shipping containers are inspected prior to and after loading to assure i

proper packaging for storage and shipping.

Wl.en required for items, assemblies or test samples, special equipment such as containers, shock absorbers and accelerometers and special protective environments, such as inert gas atmosphere, specific moisture content level and temperature levels shall be specified, provided and their existence verified.

4 Oll6H:6-880218 34

NH0-TR-005 14.0 INSPECTION, TEST AND OPERATING STATUS 14.1 General In addition to requirements for controlling identification and traceability of items as described in Section 8.0, NWO provides for maintenance of inspection.

test and o)erating status of equipment being assermbled or items and services provided for use.

This control is exercised by means of route cards, labels, tags, or other suitable means and provides assurance that the acceptability status of items or components thereof and services is known throughout the

[

procurement, manufacturing, testing, installation and operation phases, as appropriate, so that the items, comonents and services as supplied to the customer meet all contract requirements.

14.2 Procured Eautpment and Material i

NHD procurement quality requirements specify that suppliers shall establish t

procedures to indicate the inspection, test and operating status of items, or components thereof, being supplied.

The suppliers' procedures and implementation are monitored for compliance during the surveillance activities.

i Upon receipt, procured items and materials are subject to receiving inspection l

l utilizing the purchase order and requirements referena.ed or contained therein as the basis for determining acceptability.

Supplier packing lists, test and l

Inspection certifications, and material and container markings are required and are verified as present and conforming to order requirements. Only l

acceptable items are released and they are marked directly or by tags with material identity.

O 0116H:6-880218 35

NND-TR-005 15.0 CONTROL OF NONCONFORMING ITEMS 15.1 General Equipment, components or materials which do not conform to documented requirements are identified and segregated (or if too large to segregate, identified as nonconforming and roped off or tagged as nonconforming) to prevent further use or processing.

Procedures establish methods to assure positive identification of nonconforming products and services.

These procedures require that nonconformances be documented and dispositioned on appropriate forms.

Nonconformances discovered at suppliers are documented and dispositioned on a Variation Request (VR) (or equivalent) by the engineering organization responsible with concurrence by Quality Assurance. Concurrence by Quality Assurance signifies that adequate support for the engineering organization disposition has been obtained and documented and that any reinspections or special controls required to correct the nonconformance are adequately specified.

Nonconformances involving "rework" or "repair" require reinspection to verify conformance.

This reinspection is equivalent to the original inspection.

Records of nonconformances and their disposition are maintained with the inspection records for the item involved to document the as-built condition, as required by contract.

O 0116W:6-880218 36

t NHD-TR-005 I

16.0 CORRECTIVE-ACTION 16.1 General In addition to the immediate action required to disposition nonconformances covered in Section 15.0, corrective action programs to preclude recurrence of i

l l

significant problems are in effect. Quality Assurance identifies areas I

requiring corrective action based on evaluation of problems identified from such sources as nonconformances, failures, malfunctions and other deviations from requirements. Problems are also identified from audit, inspection and surveillance activities.

Corrective action emphasizes determining and correcting the underlying causes of the problem, especially for any recurring l

conditions, as a major element in reducing costs and improving reliability.

j Quality Assurance has the authority to control work until effective corrective action has been taken in situations where it judges that existing conditions may compromise the quality of NHD work.

l 16.2 Corrective Action ProST_&B The need for corrective action is formally communicated to the organization f

responsible and to appropriate management.

t i

To preclude recurrence of significant deficiencies the corrective action program provides for the following:

1 A.

Description of the problem (and cause, if known).

l i

B.

Response by organization responsible for corrective action.

l C.

Recoassended corrective action to preclude recurrence.

l D.

Assignment of responsibility for corrective action.

E.

Periodic evaluation of the status and effectiveness of corrective

action, O

f I

Oll6W:6-880218 37 1

1

d NHO-TR-005 i

j Where immediate corrective action is judged to be necessary by Quality i

i Assurance to prevent conditions significantly adverse to quality, safety or l-reliability, a stop work order may be issued to place further operations on "hold", or special controls may be established to enable further operations to l

l

-be conducted, untti corrective action is completed and vertfled to be effecttve.

l

l l

l t

I i

i il l

l I

t i

I i

i i

f I

i I

,l l

i I

1 l

/

i l

1 i

J l

1 1

t l

i i

t 0116N:6-880218 38 1

1 i

. -. -... )

NND-TR-005

(

17.0 QUALITY ASSURANCE RECORDS 17.1 General Records that furnish documentary evidence of quality on this contract are specified, prepared and maintained in accordance with established requirements.

Records are required to be legible, identifiable and retrievable.

Records are protected against damage, deterioration or. loss.

Responsibilities for record transmittal, distributton, retention and maintenance are established and documented.

17.2 Records Administration 17.2.1 Records System i

A records system has been established which complies with the general requirements of ANSI /ASME NQA-1.1986, Element 17. "Quality Assurance Records" l

including Supplement 175-1 and Appendix 17A-1.

The records system is defined, implemented and enforced in accordance with written procedures and instructions.

The records procedures include control of records withdrawn from storage which may be required during the completion of work activity.

17.2.2 Generation of Records The applicable design specifications, design verification documents, 1

procurement documents, mockup test procedures and other documents will cause 4

the records cited in 17.1 to be generated. Documents that are designated to J

become records are required to be legible, accurate and complete appropriate j

to the work accomplished.

17.2.3 Record Validation l

Documents are considered valid records, subject to the record system Quality s

Assurance requirements cited in Section 17.2.1, only after being stamped, inttialed or signed.and dated by authorized personnel or otherwlse 0116W:6-880218 39 i

+

- wp _

w

NWO-TR-005

()

authenticated.

This authentication may take the form of a statement by the responsible individual or organization.

Handwritten signatures are not required if the document is clearly identified as a statement by the reporting individual or organization.

These records may be originals or reproduced copies.

17.2.4 Index The records are indexed.

The indexing system (s) includes record retention 4

times and the location of the record within the record system.

17.2.5 Distribution The records are distributed, handled and controlled, as required, in accordance with written procedures.

a 17.2.6 Identification The records and indexing system provide sufficient information to permit traceability between the record and the item or activity to which it applies, j

l 1

17.2.7 Classification d

i Records will be classified as "Lifetime" by NWD in accordance with ASME/ ANSI NQA-1-1986, Appendix 17A-1, 3

I 17.2.8 Retention of Records

.i Records will be maintained for the life of the item or component or until such time as they are turned over to some higher authority (owner) for permanent retention.

17.2.9 Corrected Information in Records J

Records may be corrected in accordance with procedures that provide for appropriate review or approval by the origtaating organization.

The corrected

}

i 0116H:6-880218 40

NH0-TR-005 documentation includes the date and identification of the person making such correction.

17.2.10 Lost or Damaged Records If replacement or restoration of lost or damaged records is not practical, action is taken to assure the quality of items or activities affecting quality by alternate means (e.g.

reexamination or investigation).

1 17.3 Receiot The individual or organization responsible for receiving records provides protection from damage or loss during the time that records are in their possession.

17.4 Storaae. Preservation and Safekeeoina 17.4.1 Storage D un s

t rc s

nf rd the NRC approved Corporate Records Center or transferred to their designated owner.

f i

17.4.2 Preservation Records will be stored in a manner approved by the organization or organizations responsible for storage.

To preclude deterioration of the i

records the requirements of (A) through (C) below shall apply.

I A.

Provisions will be made in the storage arrangement to prevent damage from moisture, temperature and pressure.

B.

Records will be firmly attached in binders or olated in folders or l

envelopes for storage in steel file cabinets er on shelving in l

containers.

O t

0116W:6-880218 41

,_r r,-

r, r

NWO-TR-005 C.

Provisions will be made for special processed records (such as radiographs, photographs, negatives, microform and magnetic media) to l

prevent damage from excessive light, stacking, electromagnetic fields, temperature and humidity.

17.4.3 Safekeeping l

Heasures will be established to preclude the entry of unauthorized personnel into the storage area.

Measures will be taken to provide for replacement, restoration or substitution of lost or damaged records.

17.4.4 Facility NHD maintains duplicate records in separate locations. These records are stored in file cabinets within a 24-hour controlled-access, climate-controlled j

building.

17.5 Retrieval 1

l Storage systems provide for retrieval of information in accordance with i

planned retrieval times based upon the record type.

l A list is maintained designating those personnel who are permitted access to the files.

l l

Records maintained by a supplier at his facility or other location are accessible to NWD.

17.6 Disoosition Records accumulated by NWO, prior to transfer to the owner or other higher j

authority, will be made accessible during the life of the item.

The custodlan will inventory the submittals, acknowledge receipt and process these records Os in accordance with this Quality Assurance Program Plan.

l 0116W:6-880218 42

NWD-TR-005 O

18.0 AUDITS V

18.I General.

The audit program complies with ANSI /ASME NQA-1-1986 and is maintained and implemented to vertfy adequacy of systems and procedures and compliance to such systems and procedures. Quality Assurance audits subcontractors and also performs internal audits of Department activities.

These audits cover activities and areas which come under the provisions of this QAPP.

18.2 Audit Planniqq The Quality Assurance Department schedules and plans Quality Assurance audits of NHO and its subcontractors.

Suggestions as to audit planning and scheduling from the Engineering, Project Management and other departments are considered in audit planning. Audits are conducted in those areas affecting the quality of NHO work. An overall Quality Assurance program audit schedule is maintained by Quality Assurance to assure that product line or department O

activities affecting quality are audited periodically.

At.dtt teams consist of personnel with appropriate training and experience to evaluate the adequacy and implementation of policies, systems and procedures, and to evaluate products and services as appropriate.

To preserve objectivity In the audits, the audit team excludes members having direct responsibility for the area or activity being audited.

Audit plans are developed and documented in accordance with written procedures including identification of team leaders, functional areas to be audited, schedule and checklists. When available, prior audit results of the area being audited are considered in the audit plans to assure that previously deficient areas are rechecked.

Likewise, consideration is given to experience since the last audit, particularly in regard to deficiencies and nonconformances, t

O 1

l 0116H:6-880218 43 l

NHD-TR-005

('N 18.3 Auditor Training Lead auditors are trained and certified to meet the qualification requirements of ANSI /ASME NQA-1-1986, Supplement 25-3.

Auditors receive training by accompanying experienced auditors during internal audits or on visits to suppliers and on-the-job practical application (e.g., developing checklists, conducting internal audits, preparing audit reports, responding to audit reports and following up on corrective actions) with senior personnel.

18.4 Audit Scoce Audits are conducted to evaluate control of activities affecting q'tality in a specific organizational unit or work area.

The purpose is to determine that the methods, procedures, system or instructions used and interfaces are adequate to control the quality of the product or service and to determine compliance with procedural requirements.

(3 Audits may include evaluation of products and special processes to assure they

'w) conform to specified drawings, specifications, codes and standards.

These evaluations include, as appropriate, examination of records such as inspection reports, X-ray film, etc.

They also include evaluations of personnel qualifications and procedures used in special processes such as nondestructive testing and welding.

18.5 Audit Reoortino and Corrective Action Hithin thirty (30) days following an audit, the assigned Quality Assurance representative prepares and distributes a written report of the audit.

The report may be in letter form but must contain the following information as a

)

minimum.

A.

Description of the audit scope B.

Identification of the audit team.

U 0116H:6-880216 44

NHD-TR-005 C.

Identification of persons contacted during audit.

D.

Sumary of audit results including an assessme:1t of the effectiveness of the audited QA Program elements.

E.

Description of each adverse audit concern in sufficient detail to enable correctivo aciton to be taken.

The reports require that the audited organization (s) reply within thirty (30) days following receipt of the audit report, identifying planned corrective actions for deficiencies and a schedule for implementing the corrective actions.

Quality Assurance follow-up of the corrective action is accomplished by the assigned lead auditor. Quality Assurance has the responsibility for determining that an indicated corrective action has been effectively implemented.

n 18.6 External Auditi The Quality Assurance Group will coordinate customer or regulatory or other agency audits of the contract scope. Quality Assurance is also responsible for coordinating the preparation of responses to customer audits on a timely basis (usually within thirty (30) days of audit report receipt) and for following up on any indicated corrective action.

0116H:6-880218 45