Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- U-603130, Provides Revised Commitments Re GL 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment + (Provides Revised Commitments Re GL 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment)
- ML20065L060 + (Provides Revised Commitments W/Respect to Commitments Currently Identified in Util for Plant IPEEE Effort,Per GL 88-20,Suppl 4.Util Plans to Implement IPEEE Consistent w/951231 Schedule for Resolution of USI A-46)
- GO2-93-116, Provides Revised Completion Date for Installation of Adjustable Speed Drives (ASD) in Rrs.Current Plans Are to Installed ASDs During R-11 Annual Maint & Refueling Outage (Currently Scheduled for Spring 1996) + (Provides Revised Completion Date for Installation of Adjustable Speed Drives (ASD) in Rrs.Current Plans Are to Installed ASDs During R-11 Annual Maint & Refueling Outage (Currently Scheduled for Spring 1996))
- ML20149H892 + (Provides Revised Completion Dates for Individual Plant Evaluation for External Events & USI A-46 Repts)
- ML20217K080 + (Provides Revised Computer Based Integrated Security Sys Security Plan & Safeguards Alarm Sys Security Plan for Purpose of Reaccreditation.W/O Encls)
- ML20149G905 + (Provides Revised Copy of Page 7-7 Which Adequately Implements Response Number 2 in Page Changes)
- ML13316A205 + (Provides Revised Copy of Rev 5 to SO123-VIII-40.3, EOF Health Physics Leader Duties, Rev 7 to SO123-XXI-1.11.3, Emergency Plan Training Program Description & EPIP Index. W/O Procedures)
- ML20005E056 + (Provides Revised Corrective Actions to 890720 Response to Violations Noted in Insp Repts 50-327/89-16 & 50-328/89-16. Addl Data Will Be Taken & Unidentified Leakage Will Be Recalculated)
- TXX-8831, Provides Revised Date of Full Compliance for Violations Noted in Insp Repts 50-445/87-11,50-446/87-09,50-445/87-30 & 50-446/87-22.Corrective Actions & Info Will Be Available No Later 880615 + (Provides Revised Date of Full Compliance for Violations Noted in Insp Repts 50-445/87-11,50-446/87-09,50-445/87-30 & 50-446/87-22.Corrective Actions & Info Will Be Available No Later 880615)
- TXX-7119, Provides Revised Date of Full Compliance for Violation D.1 Noted in Insp Rept 50-446/86-02.Date for Completion of Design Verification & Closure of NRC-87-3742 Is 890601 + (Provides Revised Date of Full Compliance for Violation D.1 Noted in Insp Rept 50-446/86-02.Date for Completion of Design Verification & Closure of NRC-87-3742 Is 890601)
- ML20246J607 + (Provides Revised Date of Full Compliance for Violation Noted in Insp Rept 50-446/88-43.Compliance Includes Removal & Exam of Spool Piece from Facility Safety Injection Sys)
- JPN-89-060, Provides Revised Dcrdr Implementation Schedule for Procedure Revs.Phase I,Consisting of Installation of New Control Room Labels & Updating Annunciator Response & Emergency Operating Procedures,Completed.Phase 2 Delayed to 910430 + (Provides Revised Dcrdr Implementation Schedule for Procedure Revs.Phase I,Consisting of Installation of New Control Room Labels & Updating Annunciator Response & Emergency Operating Procedures,Completed.Phase 2 Delayed to 910430)
- ML20137Q665 + (Provides Revised Departure/Arrival Date & Time of Low Strategic Export from Miami to Colombia)
- ML20137Q709 + (Provides Revised Departure/Arrival Date & Time of Low Strategic Export from Miami to Colombia on 970329)
- ML18039A446 + (Provides Revised Description & Evaluation of Proposed Change & No Significant Hazards Determination.Encl 2 Contains mark- Up of Affected Units 2 & 3 TS Pages)
- ML18039A447 + (Provides Revised Description & Evaluation of Proposed Change & No Significant Hazards Determination.Encl 2 Contains mark- Up of Affected Units 2 & 3 TS Pages)
- ML20198N234 + (Provides Revised Description of Detailed 10CFR50,App R Request for TMI-1 Fire Zone FH-FZ-6,as Previously Submitted to NRC in Util Ltr Dtd 961231.Encl Description Replaces Info Provided in Referenced Ltr)
- ML20100M745 + (Provides Revised Description of Proposed Vehicle Control Measures.Encl Withheld)
- ML19207B333 + (Provides Revised Design Groundwater Level Predictions Per .Subsurface Drainage Has Not Been Incorporated in Figures Although Appropriate Mods Have Been Made to Assure Adequacy of safety-related Structures & Facilities)
- ML20209C902 + (Provides Revised Distribution List for Seabrook Station Correspondence to Reflect Current Organization)
- ML20248L279 + (Provides Revised Distribution List for Seabrook Station Correspondence,Reflecting Current Organization)
- ML20202H181 + (Provides Revised Distribution List for Seabrook Station Correspondence to Reflect Current Organization.Future Correspondence Should Be Directed to Individuals Listed on Encl)
- ML20198P695 + (Provides Revised Distribution List for Util Correspondence to Reflect Current Organization.Requests Direct Future Correspondence to Individuals Listed in Encl 1)
- ML20141F670 + (Provides Revised Elbow Tap Flow Correlation Coefficient as Requested by)
- ML20044E714 + (Provides Revised Emergency Response Data Sys Data Point Library for Unit 2.Anticipates That Changes to Data Point Library May Result from Testing)
- CNL-15-127, Provides Revised FSAR Section 6.2.1 Containment Functional Design + (Provides Revised FSAR Section 6.2.1 Containment Functional Design)
- ML13322B116 + (Provides Revised Final Acceptance Criteria for Reactor Vessel Thermal Shield Monitoring Program)
- ML20235W942 + (Provides Revised Formal Response to NRC Operational Safety Assessment.Adu Sys Incorporates Pressure Relief Valves & Not Rupture Disks as Previously Reported.Routine Testing Program Will Be Implemented to Ensure Operability)
- ML19341A191 + (Provides Revised Fuel Load & Commercial Operation Dates. Unit 1 Fuel Load & Commercial Operation Dates Are Dec 1981 & Aug 1982,respectively.Unit 2 Fuel Load & Commercial Operations Dates Are Aug 1985 & Apr 1986,respectively)
- ML20030B445 + (Provides Revised Fuel Load Dates for Facilities,In Response to NRC Request.Fsars Will Be Submitted 2 1/2 Yrs Before Fuel Load Dates.Hartsville Units B1 & B2,Phipps Bend Unit 2 & Yellow Creek Unit 2 Have Been Deferred)
- ML20149F071 + (Provides Revised Implementation Date for Util Program Re Generic Ltr 83-28,due to Recent Efforts Associated W/ Facility Fire Recovery & Plant Restart.Administrative Controls for Program Will Not Be Implemented Until 880501)
- ML20249C516 + (Provides Revised Info & Supersedes Re Demonstration of Seismic Qualification of MSIV Leakage Path. Rev to Verification Info & Seismic Calculations Included)
- ML19354E116 + (Provides Revised Info Documenting Util long-term Resolution Hydrogen Monitoring Capabilities & Requesting Relief from NUREG-0737,Item II.F.1 Requirements)
- ML20076J659 + (Provides Revised Info Re Operator Licensing Exams,Per Generic Ltr 83-01.Schedule Changes Based on Fuel Load Date Advanced to 840815)
- U-602339, Provides Revised Info for Previously Submitted Min Thrust Requirements for Five Rockwell Edward Hermavalves (1B21F067A,B,C,D & 1E51F076),in Response to GL 89-10 + (Provides Revised Info for Previously Submitted Min Thrust Requirements for Five Rockwell Edward Hermavalves (1B21F067A,B,C,D & 1E51F076),in Response to GL 89-10)
- 3F1189-12, Provides Revised Justification for Continued Operation Re HPI Line Break.Util Concluded That Likelihood of Instrumentation Being Relied Upon to Perform Design Basis Mitigation Function Remote.Supports Operation Until Refuel + (Provides Revised Justification for Continued Operation Re HPI Line Break.Util Concluded That Likelihood of Instrumentation Being Relied Upon to Perform Design Basis Mitigation Function Remote.Supports Operation Until Refuel)
- CY-97-124, Provides Revised List of Administrative Controls That Constitute Compensatory Measures Taken in Response to Action Item One of CAL + (Provides Revised List of Administrative Controls That Constitute Compensatory Measures Taken in Response to Action Item One of CAL)
- ML20135C551 + (Provides Revised List of Certified Simulator Malfunctions. Signed NRC Form-474 Describing Change to Malfunction List Attached)
- ML17321A626 + (Provides Revised List of Exxon Safety Analysis Submittal Dates,Based on Jan 1986,Cycle 6 Startup Date.Continued Operation Justified on Same Basis Allowed for Cycle 5. Meeting on 850530 Requested to Discuss Analyses)
- ML17321A653 + (Provides Revised List of Exxon Safety Analysis Submittal Dates Based on Jan 1986,Cycle 6 Startup Date.Continued Operation Justified on Same Basis Allowed for Cycle 5. Meeting on 850530 Requested to Discuss Analysis)
- ML20086B209 + (Provides Revised No Significant Hazards Evaluation for Proposed TS Change Requests 212 & 78,revising Quadrant Power Tilt Ration Requirements)
- ML20117D589 + (Provides Revised Offiste Dose Results Which Remain Bounded by 10CFR100 & Current FSAR Section 15.6.3 Analysis)
- L-93-045, Provides Revised Organization Chart for License SNM-1067 W/Description for Each Key Position to Safety + (Provides Revised Organization Chart for License SNM-1067 W/Description for Each Key Position to Safety)
- ML20155K447 + (Provides Revised Page 5 to 880330 Submittal of Rev 1 to Proposed Methodology for Handling Changes to High Integrity Container Topical Repts or Supporting Documents Such as Use Manuals or Proprietary App)
- ML20062J665 + (Provides Revised Page for ISI Summary Rept for Sixth Refueling Outage at Plant)
- ML20070F118 + (Provides Revised Paragraph to 821103 Response to IE Insp Rept 50-267/82-19.Ltr Inadvertently Contained Error in Date When Full Compliance of CN 653 Achieved)
- ML17158A090 + (Provides Revised Plan & Commitments for Completion of Tasks Necessary to Meet Guidelines of GL 89-10 & Justification for Deferral of Work on Valves Associated W/Msivlcs within GL 89-10 Program.Rev 1 to Calculation EC-VALV-0503 Encl)
- PLA-3949, Provides Revised Plan & Commitments for Completion of Tasks Necessary to Meet Guidelines of GL 89-10 & Justification for Deferral of Work on Valves Associated W/Msivlcs within GL 89-10 Program.Rev 1 to Calculation EC-VALV-0503 Encl + (Provides Revised Plan & Commitments for Completion of Tasks Necessary to Meet Guidelines of GL 89-10 & Justification for Deferral of Work on Valves Associated W/Msivlcs within GL 89-10 Program.Rev 1 to Calculation EC-VALV-0503 Encl)
- ML18038B816 + (Provides Revised Pp for Request for Relief 3-SPT-1 Submitted to NRC by Util Ltr Dtd 970122.Page Corrects an Error on Pp 3 Under Heading Alternative Testing,For Sys Pressure Test Program of Second Insp Interval)
- ML17264A776 + (Provides Revised Pressure & Temperature Limits Rept to Complete All Outstanding Util Commitments)
- ML20059N151 + (Provides Revised Program Description Identifying Method & Selected Approach for Performing Individual Plant Exams for Severe Accident Vulnerabilities)