Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20002C834 + (Proposed Tech Specs 4.2.2,4.2.3 & 4.2.4 for Condenser Trip Operating Requirements,Turbine Bypass Control Sys, & Condensate & Feedwater Sys,Respectively)
- ML20117J583 + (Proposed Tech Specs 4.2.3 Re Reactor Coolant Pumps)
- ML20138J898 + (Proposed Tech Specs 4.2.4.2.5 & 5.2.17.5,increasing Max Average Fuel Assembly Exposure Limit from 16,800 to 18,000 Mwd/Mtu in Operational Condition 1)
- ML20059G697 + (Proposed Tech Specs 4.2.5.3,reflecting Change in Method of Measuring RCS Flow Rate)
- ML20040A117 + (Proposed Tech Specs 4.2.7 Re Pcrv Pressurization Limiting Conditions for Operation & 4.2.9 Re Pcrv Closure Leakage, Limiting Conditions for Operation.Safety Analysis Encl)
- ML20216H057 + (Proposed Tech Specs 4.2.C,exempting Neutron Detectors from Channel Calibr Requirements)
- ML20216B448 + (Proposed Tech Specs 4.2.C,exempting Neutron Detectors from Channel Calibr Requirements)
- ML19340A160 + (Proposed Tech Specs 4.210-12 Re Operation W/Matl Surveillance Specimens Removed from Reactor Vessel)
- ML20076E908 + (Proposed Tech Specs 4.3 & 5.3 Re Inservice Surveillance Requirements for Snubbers in Secondary RCS)
- ML20059D774 + (Proposed Tech Specs 4.3-1 Re Reactor Trip Sys Instrumentation Surveillance Requirements)
- B12981, Proposed Tech Specs 4.3-2 Re ESF Actuation Sys Instrumentation Surveillance Requirements + (Proposed Tech Specs 4.3-2 Re ESF Actuation Sys Instrumentation Surveillance Requirements)
- ML20073C318 + (Proposed Tech Specs 4.3.1.2, RTS Response Time & 4.3.2.2, ESF Response Time, Eliminating Periodic Response Time Testing & Indicating That Sys Response Time Shall Be Verified Using Sensor Response Time)
- ML20134G340 + (Proposed Tech Specs 4.3.1.A.4.b Re Surveillance Requirement)
- ML18012A144 + (Proposed Tech Specs 4.3.2 Re ESFAS Instrumentation)
- ML20115G004 + (Proposed Tech Specs 4.3.2 Re Reactor Core & Control)
- ML20129E516 + (Proposed Tech Specs 4.3.2,regarding Reactor Core & Control to Allow Use of Either Zircaloy or ZIRLO Cladding Proposed Additional Reference to Westinghouse Topical Report, WCAP-12610-P-A, Vantage + Fuel Assembly Rept)
- ML20080C756 + (Proposed Tech Specs 4.3.2.2,4.7.1.2.1 & Bases for Spec 3/4.7.1.2 for Afs)
- ML20070S436 + (Proposed Tech Specs 4.3.3.2,4.3.3.3,Items 1 & 2 of Table 3.3.3-3,Item 5 of Table 4.3.3-1 & Tech Specs 4.7.1.2.b Requesting one-time Only Extension of 18 Month Surveillance Interval)
- ML20137Y116 + (Proposed Tech Specs 4.3.3.6 & 4.6.4.1 Re Surveillance Testing)
- ML20073J879 + (Proposed Tech Specs 4.3.6-1 Re Revising SRM & IRM Channel Calibration Frequencies)
- ML20133N047 + (Proposed Tech Specs 4.4 Re Containment Testing)
- ML19319D931 + (Proposed Tech Specs 4.4 Re Surveillance Stds for Local Leakage Rate Measurements Before & After Repair)
- ML20072S246 + (Proposed Tech Specs 4.4.1.1.4,referencing 10CFR50,App J & Allowing Approved Exemptions to ILRT Frequency Requirements)
- ML20044F554 + (Proposed Tech Specs 4.4.1.2, Reactor Coolant Recirculation Sys Jet Pumps SRs)
- ML20199H250 + (Proposed Tech Specs 4.4.3.2.2.a,changing Surveillance Interval in TS 4.4.3.2.2.a by Extending It from Current 18 Month Testing Interval to 24 Month Testing Interval to Be Consistent W/Asme Code Requirements)
- ML20057B360 + (Proposed Tech Specs 4.4.4.1.b Re Operating PORV)
- ML20135F310 + (Proposed Tech Specs 4.4.5 & 3.4.6.2 Re SG Tube Sleeving & Allowable primary-to-secondary Leak Rate)
- ML20091C146 + (Proposed Tech Specs 4.4.5 Re Steam Generator Tube Plugging)
- ML20077P950 + (Proposed Tech Specs 4.4.5, Steam Generators Surveillance Requirements & Bases 3/4.4.5, Steam Generators)
- ML20093M531 + (Proposed Tech Specs 4.4.5.1, Sgs, Deferring Next Required Surveillance to Insp SG Tubes from 961020 to Next Millstone Unit 2 Refueling Outage or No Later than 971020 & Revising Bases for Section 3/4.4.5)
- ML20107G459 + (Proposed Tech Specs 4.4.5.4.a.10 Re SG Surveillance Requirements)
- PY-CEI-NRR-1313, Proposed Tech Specs 4.4.6.1.3 Re Withdrawal of Reactor Vessel Matl Surveillance Specimens,Per Generic Ltr 91-01 + (Proposed Tech Specs 4.4.6.1.3 Re Withdrawal of Reactor Vessel Matl Surveillance Specimens,Per Generic Ltr 91-01)
- ML20070A779 + (Proposed Tech Specs 4.4.8.3.1 to Ensure That Surveillance Requirements Accurately Reflect Design Characteristics of Installed Shutdown Cooling Sys Suction Line Isolation Valves)
- ML20134L681 + (Proposed Tech Specs 4.4.8.3.1.b Re Reactor Coolant Sys Surveillance Requirements)
- ML20070F622 + (Proposed Tech Specs 4.4.9.3.2 & 4.5.2.d Re RHR Suction Valve Autoclosure Interlocks)
- ML20107E697 + (Proposed Tech Specs 4.5 & 4.6 Re Auxiliary Electric Power Sys)
- ML20091B873 + (Proposed Tech Specs 4.5.0 Re applicability,3.4.3.1 Re Leakage Detection Sys & 3.4.3.2 Re Operational Leakage)
- ML18096A082 + (Proposed Tech Specs 4.5.1.c,deleting Requirements to Remove Circuit Breakers from Circuit)
- ML20091F204 + (Proposed Tech Specs 4.5.2.d & 4.4.9.3.2 Allowing Removal of RHR Sys Suction Valve Autoclosure Interlock)
- ML17227A625 + (Proposed Tech Specs 4.5.2.d.1,reflecting Removal of Shutdown Cooling auto-closure Interlock Surveillance Requirement)
- ML20210B341 + (Proposed Tech Specs 4.5.2.f.2,increasing Performance Requirement for LPSI Pumps)
- ML20059L067 + (Proposed Tech Specs 4.5.2.h.1 Re High Head Safety Injection Flow Balance)
- ML20217N821 + (Proposed Tech Specs 4.5.2B.1,excluding Prescriptive Requirement to Vent Operating CVCS CCP Casing)
- ML20217K218 + (Proposed Tech Specs 4.5.2b,revising Surveillance Requirement to Vent ECCS Pump Casings)
- ML20155J182 + (Proposed Tech Specs 4.5.2b.1,removing Prescriptive Requirements of Using Venting Process as Sole Means to Verify That ECCS Piping Is Full of Water)
- ML20057E649 + (Proposed Tech Specs 4.5.2d Re RHR Sys Autoclosure Interlock Removal)
- ML20128E777 + (Proposed Tech Specs 4.5.3.2 & 4.1.2.3.2 Changing 2 H Time Duration to 1 H for Operability of Centrifugal Charging Pump)
- ML20037D363 + (Proposed Tech Specs 4.6 & 3.19 Re Acceptance Criteria Used to Determine That ECCS Check Valve Barriers Are Intact & Conditional Exception to Monthly Testing of LPCI Motor Operated Valves)
- ML20005B406 + (Proposed Tech Specs 4.6 & 3.19 Re LWR Primary Coolant Sys Pressure Isolation Valve Surveillance)
- ML20073K492 + (Proposed Tech Specs 4.6-1 & 4.6-2 Re Emergency Diesel Generator Testing Requirments)
- ML18139B997 + (Proposed Tech Specs 4.6-2 & Tables 3.7-2,3.7-4 & 4.1-1 Re Degraded Voltage Protection Sys)