ML20057B360

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs 4.4.4.1.b Re Operating PORV
ML20057B360
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 09/14/1993
From:
HOUSTON LIGHTING & POWER CO.
To:
Shared Package
ML20057B356 List:
References
NUDOCS 9309210239
Download: ML20057B360 (2)


Text

,

REACTOR G00LANT SYSTEl1

,3. f'

^

~

.REllEF VALVES 1ULVEllLA14Cf_BEJ1IJ R[MNT S 4.4.4.1 In addition to the requirements of Specification 4.0.5, each PORV shall be demonstrated OPERABLE at least once per 18 months by:

-om Ac xAusso.s. channel, Performing a CHANNEL CAllBRATIONI and a.

b.

Operating the valve through one complete cycle of full travelf b

3,4,or5.

1 4.4.4.2 Each block valve shall 'be demonstrated OPERABLE at least once per 92 days by operating the valve through one complete cycle of full travel unless the block valve iv closed "4 th peuer *emvsk in order to meet the requirements of ACTION b. or c.

in Specification 3.4.4.

fg ia sw L :th/

I b

f

$0Ul ti TEXA5 up11s 3 3 g, p ))

9309210239 930914 63 j

lis)-

$1 i

PDR ADOCK 05000498 P

PDR

\\

i o

REACTOR' COOLANT SYSTEM RELIEF VALVES

.SURRVEJ1LAELREWlEEMEt4Il 4.4.4.1 In addition to the requirements of Specification 4.0.5, each PORV shall be demonstrated OPERABLE at least once per 18 months by:

yoa % ach>ak e%nsc\\

Performing a CHAtit4EL CALIBRATI0tK and a.

b.

Operating the valve through one complete cycle of full travel.

4.4.4.2 Each block valve shall 'be demonstrated OPERABLE at least once per 92 days by operating the valve through one complete cycle of full travel unless the block valve is closed "ith pmeer remed-in order to meet the requirements of ACTI0t1 b. or c. in Specification 3.4.4.

C a < t < d~

[ f Q,J/f7 L VA '

341,je,] w; fit. GL90-0G d "F5 U"" Y'*N l

(

4 A

I i

i h

SOUTH TEXA5 - UNITS 1 & 2 3/4 4-11 e

w

.,ew

- -. -,