ML20134L681
| ML20134L681 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 11/18/1996 |
| From: | ENTERGY OPERATIONS, INC. |
| To: | |
| Shared Package | |
| ML20134L678 | List: |
| References | |
| NUDOCS 9611210139 | |
| Download: ML20134L681 (4) | |
Text
9 0
9 6
4 NPF-38-184 ATTACHMENT A 9611210139 961118 PDR ADOCK 05000382 P
I REACTOR COOLANT SYSTEM SURVEILLANCE REQUIREMENTS 4.4.8.3.1 Each SDC System suction line relief valve shall be demonstrated i
OPERABLE:
3 by verifying in the control room at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> that a.
each valve in the suction path between the RCS and the SDC relief valve is open.
b.
At least every 30 months when tested pursuant to Specification 4.0.5.
4.4.8.3.2 With the RCS vented per ACTIONS a, b, or c, the RCS vent (s) and all valves in the vent path shall be verified to be open at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
l
- Except when the vent pathway is provided with a valve which is locked, sealed, or otherwise secured in the open position, then verify these valves open at least once per 31 days.
WATERFORD - UNIT 3 3/4 4-35 AMENDMENT NO. 66, 72
e G
e s
i l
NPF-38-184 ATTACHMENT B i
~ ~ _ - -....
l
]
, REACTOR COOLANT SYSTEM SURVEILLANCE REQUIREMENTS l
l 4.4.8.3.1 For each SDC System suction line relief valve:
l l
- a. verify in the control room at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> that each valve in the l
suction path between the RCS and the SDC relief valve is open.
l 4.4.8.3.2 With the RCS vented per ACTIONS a, b, or c, the RCS vent (s) and all valves in .e vent path shall be verified to be open at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
- i 4
I f
I J
J 1
i A
A P
- Except when the vent pathway is provided with a valve which is locked, sealed, or othenuise secured in the open position, then verify these valves open at least once per 31 days.
WATERFORD - UNIT 3 3/4 4-35 AMENDMENT NO. 66-7-3