Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151L676 + (Proposed Tech Spec Section 4.6.G.1,reducing Max Permissible Recirculation Loop Flow Imbalance from 15 to 10%)
- B12486, Proposed Tech Spec Section 4.8.1.1.2 Increasing Emergency Diesel Generator Startup Time of 10 to 11 & Response Time for Item 11.a of Table 3.3-5 from 12 to 13 + (Proposed Tech Spec Section 4.8.1.1.2 Increasing Emergency Diesel Generator Startup Time of 10 to 11 & Response Time for Item 11.a of Table 3.3-5 from 12 to 13)
- ML20236G771 + (Proposed Tech Spec Section 4.8.1.2.e.1,revising Spec to Agree W/Rev 2 of App II of Tdi Diesel Generators Owners Group Design,Review & Quality Revalidation Rept)
- ML20126A924 + (Proposed Tech Spec Section 4.9.3, Xenon Stability Testing)
- ML20085B591 + (Proposed Tech Spec Section 5.0 Re Design Features)
- ML20205H680 + (Proposed Tech Spec Section 5.3.1 Deleting Max U Fuel Rod Weight Limit)
- ML20214N958 + (Proposed Tech Spec Section 5.3.1, Fuel Assemblies, Deleting Max Total Weight Limitation of 1766 G U Per Fuel Rod)
- ML20039B403 + (Proposed Tech Spec Section 5.6 Re Fuel Storage)
- ML20154A094 + (Proposed Tech Spec Section 6 Re Administrative Controls)
- ML20203C955 + (Proposed Tech Spec Section 6 Reflecting Company Reorganization)
- ML17299B261 + (Proposed Tech Spec Section 6, Administrative Controls, to Reflect Reorganization)
- ML20138R937 + (Proposed Tech Spec Section 6, Administrative Controls, Reflecting Organizational Changes)
- ML20154D615 + (Proposed Tech Spec Section 6, Administration Controls, Replacing Organization Charts W/More General Requirements)
- ML20069N260 + (Proposed Tech Spec Section 6, Administrative Controls)
- ML20058Q135 + (Proposed Tech Spec Section 6, Administrative Controls)
- ML17300B004 + (Proposed Tech Spec Section 6, Administrative Controls)
- ML20237A931 + (Proposed Tech Spec Section 6,revising Administrative Controls to Reflect Planned Organizational Changes Superseding Proposed Changes Submitted as Proposed Change 3 in)
- ML20207K305 + (Proposed Tech Spec Section 6,revising Administrative Controls)
- ML20207K265 + (Proposed Tech Spec Section 6,revising Administrative Controls)
- ML20069G301 + (Proposed Tech Spec Section 6,revising Section 6.5 to Implement New Safety Review & Audit Program,Adding New Position to Figure 6.2.2(3) & Editing Paragraphs 6.5.3.1(a) (B) & (C))
- ML19345F757 + (Proposed Tech Spec Section 6. Administrative Controls)
- ML18057A512 + (Proposed Tech Spec Section 6.0)
- ML20073B557 + (Proposed Tech Spec Section 6.0 Changing Titles of Onsite & Offsite Organizations)
- ML20118B080 + (Proposed Tech Spec Section 6.0 Re Organization & Position Title Changes)
- ML20070F671 + (Proposed Tech Spec Section 6.0 Re Responsibility & Organization of Plant Operations & Composition of Plant Safety Review Committee)
- ML20066G084 + (Proposed Tech Spec Section 6.0 Re Station Control Room Engineer & Offsite Review & Investigative Function)
- ML20044B278 + (Proposed Tech Spec Section 6.0 Re station-qualified Reviewer Program)
- ML20044B269 + (Proposed Tech Spec Section 6.0 Re station-qualified Reviewer Program)
- ML20153E987 + (Proposed Tech Spec Section 6.0 Replacing Organizational Charts W/More General Requirements)
- ML20195B986 + (Proposed Tech Spec Section 6.0, Administrative Controls, Deleting Organizational Charts,Per Generic Ltr 88-06)
- ML20151C587 + (Proposed Tech Spec Section 6.0, Administrative Controls, Deleting Organization Charts)
- ML20085K000 + (Proposed Tech Spec Section 6.0, Administrative Controls)
- ML20079H214 + (Proposed Tech Spec Section 6.0, Administrative Controls)
- ML20212Q034 + (Proposed Tech Spec Section 6.0, Administrative Controls)
- ML17348A879 + (Proposed Tech Spec Section 6.0, Administrative Controls)
- ML20235A412 + (Proposed Tech Spec Section 6.0,Administrative Controls, Reflecting Previously Discussed & Approved Organizational Changes)
- ML19332G011 + (Proposed Tech Spec Section 6.2, Review & Audit, Page 220, Re Organization & Duties of Station Operations Review Committee)
- ML20151F900 + (Proposed Tech Spec Section 6.2.3, Independent Safety Engineering Group (Iseg))
- ML20137W125 + (Proposed Tech Spec Section 6.5,clarifying Fact That Plant Review Committee Is Review Group,Not Audit Group)
- ML20086K098 + (Proposed Tech Spec Section 6.5.1 Re Site Review Committee & 6.5.2 Re Independent Review Panel)
- ML20039E842 + (Proposed Tech Spec Section 6.5.2 Re Safety Review Committee Reorganization.Safety Evaluation Encl)
- ML20132F649 + (Proposed Tech Spec Section 6.5.2.9 Requiring That Company Nuclear Review Board Rept to & Advise Senior Vice President, Nuclear)
- ML17300B149 + (Proposed Tech Spec Section 6.9.1.4,requiring Repts to Be Submitted within First Calendar Quarter of Each Yr)
- ML20098B004 + (Proposed Tech Spec Section 6.9.1.6,adding Reporting Requirements for Challenges to PORV & Pressurizer Code Safety Valves)
- ML20006A072 + (Proposed Tech Spec Section VII, Administrative Controls Changing Offsite Organization & Plant Staff)
- ML20236N588 + (Proposed Tech Spec Section, Bases Correcting Section for Agreement W/Definition of Pressure Boundary Leakage)
- ML20044F506 + (Proposed Tech Spec Sections 1,2,4 & 5 & Pages B3.3-75 & B3.3-91)
- ML20155B459 + (Proposed Tech Spec Sections 1,3,4,5 & 6,reflecting Numerous Editorial Corrections & Administrative Changes)
- ML20009A852 + (Proposed Tech Spec Sections 1.0,2.1-1 & 2.1-2 Re Reactor Protection Sys Setpoints,Safety Limits & Operating Limits to Allow Cycle III Operation at 2544 MW Thermal)
- ML20085N220 + (Proposed Tech Spec Sections 1.31 Re Primary Containment integrity,3/4.6.1 Re Primary Containment & 3/4.6.3 Re Primary Containment Isolation Valves)
- ML18025B479 + (Proposed Tech Spec Sections 1.O & 1.P,clarifying Definition of Secondary Containment Integrity)
- ML20140F851 + (Proposed Tech Spec Sections 2 & 3 Incorporating Surveillance Requirements for Solid Radwaste.Discussion,Justification & Significant Hazards Consideration Encl)