i 6.0 ADMINISTRATIVE CONTROLS 6.1 RESPONSIBILITY.

- 6.1.1 The Executive Director, AN0 Site Operations shall be responsible for overall facility operation and shall delegate in writing the succession to this responsibility during his absence.

6.2 ORGANIZATION 6.2.1 0FFSITE AND ONSITE ORGANIZATIONS Onsite and offsite organizations shall be established for unit operation and corporate management, respectively.

The onsite and offsite organizations shall include the positions for activities affecting the safety of the nuclear power plant.

a.

Lines of author'ty, responsibility, and communication snall be established and defined for the highest management levels through intermeciate levels to and including all operating organization positions.

ihese relationships shall be documented and updated, as appropriate, in the form of organization charts, functional descriptions of departmental responsibilities and relationships, and job descriptions for key personnel positions, or in equivalent forms of documentation.

These requirements shall be documented in the QA Manual Operations, b.

The Executive Director, AN0 Site Operations, shall be responsible for overall unit safe operation and shall have control over those onsite activities necessary for safe operation and maintenance of the plant.

c.

The Vice President, Nuclear Operations, shall have corporate responsibility for overall plant nuclear safety and shall take any measures needed to ensure acceptablo performance of the staff in operating, maintaining, and providing technical support to the plant to ensure nuclear safety, d.

The individuals who train the operating staff and those who carry out health physics and quality assurance functions may report to the appropriate onsite manager; however, they shall have sufficient organizational freedom to ensure their independence from operating pressures.

-o ggg FACILITY STAFF

  • o

$8*

6.2.2 The Operations Superintendent and Shift Supervisor shall hold a MO serior reactor operator license.

The Plant Operators and Assistant ce Plant Operators shall hold a reactor operator license.

Each on

$o duty shif t shall be composed of at least the minimum shif t crew g

composition shown in Table 6.2-1.

E 88 e a. a.

Amendment No. I6, 30, 34, 37, 117

  1. 7, 50, 59, 64, 82, 85, 99

=-

6.2.2.1 Administrative controls shall be established to limit the amount of overtime worked by plant staff performing safety related functions.

These administrative controls shall be in accordance with the guidance provided by the NRC Policy Statement on working hours (Generic Letter 82-12).

6.3.

FACILITY STAFF QUALIFICATIONS 6.3.1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971 for comparable position, except for (1) the Health Physics Superintendent who shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975 and (2) the Shif t Technical Advisor who shall have a bachelor's degree or equivalent in a scientific or engineering discipline with specific training in plant design, and response and analysis of the plant for transients and accidents.

6.4 TRAINING 6.4.1 A retraining and replacement training program for the unit staff shall be maintained under the direction of the Executive Director, ANO Site Operations and shall meet or exceed the requirements and recommendations of Section 5.5 of ANSI N18.1-1971 and Appendix "A" of 10 CFR Part 55.

6.4.2 A training program for the Fire Brigade shall be maintained under the direction of the Executive Director, AN0 Site Operations and shall meet or exceed the requirements of Section 27 of the NFPA Code-1975 except for Fire Brigade training sessions which shall be held at least quarterly.

6.5 REVIEW AND AUDIT 6.5.1 Plant Safety Committee (PSC) Function 6.5.1.1 The Plant Safety Committee shall function to advise the Executive Director, AN0 Site Operations on all matters related to nuclear safety.

COMPOSITION 6.5.1.2 The Plant Safety Committee shall be composed of the:

Chairman: General Manager, Plant Support Member:

Operations Manager Member:

Maintenance Manager Member:

Training Manager Member:

Plant Licensing Supervisor Member:

Engineering Manager Member:

Quality Assurance Superintendent Member:

Reactor Engineering Superintendent Member:

Health Physics Superintendent The Executive Director, ANO Site Operations should designate in writing l

l the Alternate Chairman in the absence of the Chairman.

AmendmentNo.85,pf 117a i

THIS PAGE INTENTIONALLY LEFT BLANK Amendment No. 16, 30, 34, 37, 47, 58, 64, 119 82, 99, I

O THIS PAGE INTENTIONALLY LEFT BLANK Amendment No. 37, A7, 64,,82, 99, 120

r ALTERNATES 6.5.1.3 All alternate members shall be appointed in writing by the PSC Chairman to serve on a temporary basis; however, no more than two alternates shall participate as voting members in PSC activities at any one time.

MEETING FREQUENCY 6.5.1.4 The PSC shall meet at least once per calendar month and as convened by the PSC Chairman or his designated alternate.

QUORUM 6.5.1.5 The minimum quorum of the PSC necessary for the performance of the PSC responsibility and authority provisions of these technical specifications shall consist of the Chairman or his designated alternate and four members including alternates.

RESPONSIBILITIES 6.5.1.6 The Plant Sufety Committee shall be responsible for:

a.

Review of 1) all procedures required by Specification 6.8 and revisions thereto, 2) any other proposed procedures or revisions thereto as determined by the Executive Director, ANO Site Operations to affect nuclear safety.

b.

Review of all proposed tests and experiments that affect nuclear

safety, c.

Review of all proposed changes to the Appendix "A" Technical Specifications.

d.

Review of all proposed chang" difications to plant systems or equipment that affect nue

,r ty, e.

Investigation of all violatior, che Technical Specifications, including the preparation and 1.rwarding of reports covering evaluation and recommendations to prevent recurrence to the Executive Director, ANO Site Operations and to the Chairman of the Safety Review Committee.

f.

Review of those Reportable Occurrences requiring 24-hour notification of the Commission.

Amendment No. 16, 24, 27,.47, 64, 82, 99, 121