Proposed Tech Spec Section 6, Administration Controls, Replacing Organization Charts W/More General Requirements
ML20154D615
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 05/06/1988
From:
GEORGIA POWER CO.
To:
Shared Package
ML20154D612 List:
References
TAC-68222, TAC-68223, NUDOCS 8805190265
Download: ML20154D615 (23)


Text

- -

. o. l 1

i l , ADMINISTRATIVE CONTROLS 6.1 RESPONS18!LITY 6.1.0 The general manager shall provide direct executive oversight over all l aspects of Plant Hatch.

i 6.1.1 The Plant Manager shall be responsible for overall unit operation, except for the Radiological Environmental Monitoring Program as described below and for delegation in writing of the succession of this responsibility during his absence. Ce-tain plant support functions shall be the responsibility of the Plant Support Manager.

6.1.2 The Manager Radiological Safety shall be responsible for the j Radiological Enviroreental Monitoring Program as described in the i Specification 3/4.16 of Unit I and for the writing of the Annual Radiological.  ;

Environmental Surveillance Report. The Manager Radiological Safety shall review the proposed changes to plant systems or equipment, provided that such '

changes are identified by the Plant Review Board (PRB) as having a potential  !

radiological environmental impact.  ;

6.1.3 Each of the above-mentioned individuals is responsible for the accuracy of the procedures needed to implement his responsibilities. '

L 6.2 ORGANIZATION 6.2.1 0FFSITE AND ONSITE ORGANIZATIONS i

Onsite and offsite organizations shall be established for unit operation '

and corporate management, respectively. The onsite and offsite organizations shall include the positions for activities af fecting the safety of the nuclear power plant.

a. Lines of authority, responsibility, and consnunication shall be established and defined for the highest management levels through  !

intermediate levels to and including all operating organization i positions. These relationships shall be documented and updated, as i appropriate, in the form of organization charts, functional '

descriptions of departmental responsibilities and relationships, and job descriptions for key personnel positions, or in equivalent forns  ;

of documentation. These requirements shall be documented in the Plant i Hatch Unit 2 updated FSAR. I

b. The Plant Manager shall t,e responsible for overall unit safe operation  !

and shall have control over those onsite activities necessary for safe operation and maintenance of the plant.

c. The vice president shall have corporate responsibility for overall i plant nuclear safety and shall take any measur?s needed to ensure i acceptable performance of the staff in operating, maintaining and i providing technical support to the plant to ensure nuclear safety.

l HATCH - UNIT 1 6-1 Proposed TS/02084/118-145 l

'~5805190265 880506 PDR ADOCK 05000321 P DCD I

.- -.,_._,,., -__ -.... - ._..,,. ,_.._,__.--. --,- - _.. ,,---, -n n.

s.

h

', 6.0 ADMINISTRATIVE CONTROLS i l

I

d. Ths individuals who train the operating staf f and those who carry out health physics and quality assurance functions may report to the (

appropriate onsite manager; however, they shall have suf ficient organizational f reedom to ensure their independence from operating  ;

pressures.

L 6.2.2 UNIT STAFF  ;

i

a. Each on duty shif t shall t,e composed of at least the minimum shif t '

crew composition shown in table 6.2.2-1.

}

b. At least one licensed Operator shall be in the control room for each  !

reactor containing fuel. {

I

c. At least two licensed Operators shall be resent in the control room i for each reactor in the process of start-up, scheduled reactor i shutdown and during recovery f rom reactor trips,
d. An individual qualified to implement radiation protection procedures  !

shall be on site when fuel is in either reactor,

e. All CORE ALTERATIONS shall be directly supervised by either a licensed Senior Reactor Operator or Senior Reactor Operator Limited to Fuel Handling who has no other concurrent responsibilities during  !

this operation.

l

[

f.

A Fire Team of at least five members shall be maintained onsite at [

all times. The Fire Team shall not include the minimum shif t crew  !

necessary for safe shutdown on Units 1 and 2 or any personnel '

required for other essential functions during a fire emergency.  !

g. Administrative procedures shall be developed and implemented to limit the working hours of Unit staff who perform safety-related functions; e.g., senior reactor operators, reactor operators, ,

auxiliary operators, health physicists, and key maintenance  !

personnel.

l Adequate shift coverage shall be w intained without routine heavy (

use of overtime. The objective shall be to have operating  ;

personnel work a nominal 40-hour week while the plant is  !

operating. However, in the event that unforeseen problems require  ;

substantial amounts of overtime to be used or during extended  !

periods of shutdown for refueling, major maintenance, or major plant modifications, the following guidelines shall be followed on ,

a temporary basis: j (1) An individual should not be permitted to work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> straight, excluding shif t turnover time.

(2) An individual should not be permitted to work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any 24-hour period, nor more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in any HATCH - UNIT 1 ' 6-2 Proposed 15/02004/118-109

s. 6.0 ADMINISTRATIVE CONTROLS >

' 48-hour period, nor more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any 7-day

period, all excluding shift turnover time.  ;

(3) A break of at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> should be allowed between work 3 periods, including shift turnover time.  !

(

.l (4) Except during extended shutdown periods, the use of overtime  ;

i should be considered on an individual basis and not for the

] entire staff on a shift. -

j the l Anydeviationfromtheaboveguidelinesshallbeauthorizedbfth Plant Manager or higher levels of management, in accordance w 4 established procedures and with documentation of the basis for granting the deviation. Controls shall be included in the procedures

such that individual overtime shall be reviewed monthly by the Plant i

Manager or his designee to assure that excessive hours have not been assigneA *^utine deviation from the above guidelines is not i author' n

h. The Og n c.s Superintendent. Operations Supervisor, and Shif t t j Supery! - shall hold a senior reactor operator license. The plant
operato o and assistant plant operators shall hold a reactor operator license.

f i  !

i I

1 4

> l l

l l i j '

l i

i 1 1 1 i

. l 1

l l MA1CH - UNIT 1 6-3 Proposed T5/0208q/118-109 I

1 1

1 I

i j

', ADMINISTRATIVE CONTROLS

h. .

MEETING FRE0VENCY 6.5.1.4 The PRB shall meet at least once per calendar month and as convened by the PRB Chairman or his designated alternate.

000 RUM 6.5.1.5 The minimum quorum of the PRB necessary for the performance of the PRB responsibility and authority provisions of these Technical Specifications shall consist of the Chairman or his designated alternate and three voting members including alternates.

RESPONSIBILITIES 6.5.1.6 The PRB shall be responsible for:

a. Review of all procedures required by Specification 6.8 and changes thereto, except those for the Radiological Environmental Monitoring Program, any other proposed procedures or changes thereto as determined by the Plant Manager to af fect nuclear safety.
b. Review of all proposed tests and experiments that affect nuclear safety.
c. Review of all proposed changes to Appendix A Technical Specifications.
d. Review of all proposed changes or modifications to unit systems or equipment that affect nuclear safety,
e. Investigation of all reportable violations of the Technical Specifications including the preparation and forwarding of reports covering evaluation and recommendations to prevent recurrence to the general manager, the vice president, and to the Safety Review Board (SRB). l
f. Review of all REPORTABLE EVENTS.

I

g. Review of unit operations to detect potential nuclear safety ha za rd s .
h. Performance of special reviews, investigations or analyses and reports thereon as requested by the Plant Manager or the SRB. j l

l i

l Hl.TCH - UNIT I 6-7 Proposed TS/01530/118-149

. ADMINISTRATIVE CONTROLS RESPONSIBILITIES (Continued)

1. Review of the Security Plan and implementing procedures a?d shall j submit recommended changes to the SRB.

t l

j. Review of the Emergency Plan and implementing procedures and shall submit recommended changes to the SRB.
k. Review of any unplanned onsite release of radioactive material to the environs when such release is in excess of 1 Ci, excluding dissolved and entrained gases and tritium for liquid ef flue.its, and in excess of 150 Ci of noble gases or 0.02 Ci of radioiodines for gaseous effluents. Also included is the preparing and forwarding to the Plant Manager and the SRB reports covering evaluation, recommendations and disposition of the corrective action to prevent recurrence.
1. Review of changes to the FROCESS CONTROL PROGRAM and the OFFSITE DOSE CALCULATION MANUAL (ODCM), except for the section on the Radiological Environmental Monitoring Program in the ODCM.
m. Review of proposed change (s) to plant systems and equipment to determine whether the proposed change has a potential radiological environmental impact. Such change (s) will be reported to the Manager-Radiological Safety.

AUTHORITY 6.5.1.7 The PRB shall:

a. Recommend in writing to the Plant Manager approval or disapproval of items considered under 6.5.1.6(a) through (d) above,
b. Render determinations in writing with regard to whether or not each item considered under 6.5.1.6(a) through (e) above constitutes an unreviewed safety question.
c. Provide written notification within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the general manager, the vice president, and the SRB of disagreement between the PRB and the Plant Manager; however, the Plant Mar,ager shall have responsi-bility for resolution of such disagreements pursuant to 6.1.1 above.

RECORDS 6.5.1.8 The PRB shall maintain written minutes of each PRB meeting that, at a minimum, document the results of all PRB activities performed under the responsibility and authority provisions of these Technical Specifications.

Copies shall be provided to the general manager, the vice president, and the SRB.

HATCH - UNIT 1 6-8 Proposed T5/0153q/118-145

r

. ADMINISTRATIVE CONTROLS 6.5.2. SAFETY REVIEW BOARD (SRB)

FUNCTION 6.0.2.1. The SRB shall function to provide independent review and audit of designated activities in the areas of:

a. Nuclear power plant operations.
b. Nuclear engineering.
c. Chemistry and radiochemistry.
d. Metallurgy.
e. Instrumentation and control,
f. Radiological safety,
g. Mechanical and electrical engineering.
h. Quality assurance practices.

COMPOSITION 6.5.2.2. The SRB shall be composed of a minimum of five persons who as a group provide the expertise to review and audit the operation of a nuclear power plant. The Chairman and other members shall be appointed by the vice president or his designee. The composition of the SRB shall meet the requirements of ANSI N18.7-1976. l ALTERNATES 6.5.2.3. All alternate members shall be appointed in writing by the SRB Chairman to serve on a temporary basis; however, no more than a minority of alternates shall participate as voting members in SRB activities at any one time. However in extenuating circumstances, the vice president may designate the use of additional alternates with voting authority when regular merabers l are not available within necessary time constraints.

CONSULTANTS 6.5.2.4. Consultants shall be utilized as determined by the SRB Chairman to provide expert advice to the SRB.

MEETING FRE0VENCY l 6.5.2.5. The SRB shall meet at letst once per calendar quarter during the initial year of unit operation following fuel loading and at least once per 6 months thereafter.

HATCH - UNIT 1 6-9 Proposed TS/0153q/ll8-145

. ADMINISTRATIVE CONTROLS OUORUM 6.5.2.6. The minimum quorum of the SRB necessary for the perfornance of the SRB review and audit functions of these Technical Specifications shall consist of the Chairman or his designated alternate and at least a majority of the members including alternates. No more than a minority of the quorum l shall have line responsibility for operation of the unit.

REVIEW 6.5.2.7. The SRB shall be responsible for the review of:

a. The safety evaluations for (1) changes to procedures, equipment, or systems and (2) tests or experiments completed under the provision of section 50.59, 10 CFR, to verify that such actions did not constitute an unreviewed safety question,
b. Proposed changes to procedures, equipment or systems which involve an unreviewed safety question as defined in section 50.59, 10 CFR.
c. Proposed tests or experiments which involve an unreviewed safety question as defined in section 50.59, 10 CFR.
d. Proposed changes to Technical Specifications or this Operating License.
e. Violations of codes, regulations, orders, Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance.
f. Significant operating abnormalities or deviations f rom normal and expected performance of unit equipment that af fect nuclear safety.
g. All REPORTABLE EVENTS.
h. All recognized indications of an unanticipated deficiency in some aspect of design or operation of structures, systems, or components that could af fect nuclear safety.
i. Reports and meetings minutes of the Plant Review Board.

HATCH - UNIT 1 6-10 Proposed TS/0lS39/118-149

," ADMINISTRATIVE CONTROLS e .

AUDITS 6.5.2.8. Audits of unit activities shall be performed under the cognizance of the SRB. Each inspection or audit shall be performed within the specified time interval with:

1. A maximum allowable extension not to exceed 25 percent of the inspection or audit interval.
2. A total maximum combined interval time for any three consecutive inspections or audit intervals not to exceed 3.25 times the specified inspection or audit interval.

These audits shall encompass:

a. The conformance of unit operation to provisions contained within the Technical Specifications and applicable license conditions at least once per 12 months.
b. The performance, training and qualifications of the entire unit staf f at least once per 12 months.
c. The results of actions taken to correct deficiencies occurring in unit equipment, structures, systems or method of operation that af fect nuclear safety at least once per 6 months.
d. The performance of activities required by the Operational Quality Assurance Program to meet the criteria of Appendix 8,10 CFR 50, at least once per 24 months.
e. The Emergency Plan and implementing procedures at least once per 12 months shall be performed by individuals who have no direct responsibility for implementation of this plan, f.

The Security Plan and implementing procedures at least once per 12 months shall be performed by individuals who have no direct responsibility for implementation of this plan,

g. Any other area of unit operation considered appropriate by the SRB or the vice president.

l

h. The Fire Protection Program and implementing procedures at least once per 24 months.
1. An independent fire protection and loss prevention inspection and audit shall be performed annually utilizing either qualified of f site licensee personnel or an outside fire protection firm.
j. An inspection and audit of the fire protection and loss prevention program shall be perfermed by an outside qualified fire consultant at intervals no greater than 3 years. During the year in which the inspection or audit occurs, the requirements of 6.5.2.8.i. can be affected concurrently.

l l

I i

HATCH - UNIT 1 6-11 Proposed TS/0153q/ll8-145

, ADMINISTRATIVE CONTROLS

k. The Radiological Environmental Monitoring Program and the results thereof annually.
1. The ODCM, Process Control Program, and implementing procedures at least once per 24 months.

AUTHORITY 6.5.2.9. The SRB shall report to and advise the vice president on those areas of responsibility specified in sections 6.5.2.7. and 6.5.2.8. l RECORDS 6.5.2.10. Records of SRB activities shall be prepared, approved and distributed as indicated below:

a. Minutes of each SRB meeting shall be prepared, approved and forwarded to the vice president within 14 days following each meeting. l
b. Reports of reviews encompassed by section 6.5.2.7. above, shall be prepared, approved and forwarded to the vice president within 14 days l following completion of the review.
c. Audit reports encompassed by section 6.5.2.8. above, shall be forwarded to the vice president and to the management positions responsible for the areas audited within 30 days af ter completion of l the audit.

6.6. REPORTABLE EVENT ACTION 6.6.1. The following actions shall be taken for REPORTABLE EVENTS:

a. The Comission shall be notified and/or a report submitted pursuant to the requirements of section 50.73 to 10 CFR part 50, and
b. Each REPORTABLE EVENT shall be reviewed by the PRB and the results of this review shall be submitted to the SRB, the general manager, and the vice president.

6.7. SAFETY LIMIT VIOLATION 6.7.1. The following actions shall be taken in the event a Safety Limit is violated:

a. The unit shall be placed in at least HOT SHUTOOWN within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
b. The Safety Limit violation shall be reported to the Comission as soon as practical and in all cases within I hour of occurrence.

The general manager, the vice president, and the SRB shall be notified within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. l HATCH - UNIT 1 6-12 Proposed T5/01534/118-149

, ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION (Continued)

c. A Licerisee Event Report shall be prepared pursuant to 10 CFR 50.73.
d. The Licensee Event Report shall be submitted to the Comission in accordance with 10 CFR 50.73, and to the PRB, the SRB, the general manager, and the vice president within 30 days of the violation.

6.8. PROCEDURES 6.8.1. Written procedures shall be established, implemented and maintained covering the activities referenced below:

a. The applicable procedures recommended in Appendix A of Regulatory Guide 1.33, Revision 2. February 1978.
b. Refueling operations.
c. Surveillance and test activities of safety related equipment.
d. Security Plan implementation,
e. Emergency Plan implementation.
f. Fire Protection Program implementation.
g. PROCESS CONTROL PROGRAM implementation.
h. ODCM implementation.

6.8.2 Each procedure of 6.8.1. and other procedures which the Plant Manager or Plant Support Manager has deterinined to af fect nuclear safety, and changes thereto, shall be reviewed by the PRB and approved by the appropriate member of plant management, designated by the Plant Manager or Plant Support Manager prior to implementation. The Plant Manager or Plant Support Manager will approve administrative procedures, security plan implementing procedures, and changes thereto. The Manager-Plant Training and Onsite Emergency Preparedness shall approve the emergency plan implementing procedures and changes thereto. All other procedures of this specification and changes thereto will be approved by the department head designated by the

' plant Manager or Plant Support Manager. The procedures of this specification shall be reviewed periodically as set forth in administrative procedures.

' 6. 8. 3. Temporary changes to procedures of 6.8.1. above may be made provided:

a. The intent of the original procedure is not altered.

l HATCH - UNIT 1 6-13 Prog,, sed TS/0153q/ll8-149

i 5.0 Administrative Controls This section describes administrative and management controls established to implement the Environmental Technical Specifications (ETS). Measures specified in this section include assignments of responsibility, review and audit functions, procedures, and reporting requirements.

Corporate responsibility for implementing the ETS and for assuring that the station is operated in such a way as to provide protection for environment rests with the vice president. thel Responsibilities for compliance <ith the ETS and for the envi onmental monitoring program required by the iTS are given below.

Independent audit shall be provided, as discussed in section 5.3.2, by the General Manager-Quality Assurance.

5.1 Resoonsibility 5.1.1 The Plant Manager is responsible for the environmental monitoring programs. The Plant Manager is also responsible for implementing the special surveillance activities described in section 4.

5.1.2 The Ger<eral Manager-Quality Assurance is responsible for assuring that the periodic audits of plant operation and the environmental monitoring activities to ensure confornance with the ETS are conducted.

5.2 Organizatini Company organization relative to environmental matters is presented in Chapter 13 of the Plant Hatch Unit 2 updated Final Safety Analysis Report.

3 HATCH - UNIT 1 5-1 l

6.0 ADMINISTRATIVE CONTROLS 6.1 RESPONSIBILITY 6.1.0 The general manager shall provide direct executive oversight over all aspects of Plant Hatch.

6.1.1 The Plant Manager shall be responsible for overall unit operation, except for the Radiological Environmental Monitoring Program as described below and for delegation in writing of the succession of this responsibility during his absence. Certain plant support functions shall be the responsibility of the Plant Support Manager.

6.1.2 The Manager Radiological Safety shall be responsible for the Radiological Environmental Monitoring Program as described in the Specification 3/4.16 of Unit I and for the writing of the Annual Radiological Environmental Surveillance Report. The Manager Radiological Safety shall review the proposed changes to plant systems or equipment, provided that such changes are identified by the Plant Review Board (PRB) as having a potential radiological environmental impact.

6.1.3 Each of the above-mentioned individuals is responsible for the accuracy of the procedures needed to implement his responsibilities.

6.2 ORGANIZATION 6.2.1 0FFSITE AND ONSITE ORGANIZATIONS Onsite and offsite organizations shall be established for unit operation and corporate management, respectively. The onsite and offsite organizations shall include the positions for activities affecting the safety of the nuclear power plant. ,

a. Lines of authority, responsibility, and communication shall be established and defined for the highest management levels through intermediate levels to and including all operating organization positions. These relationships shall be documented and updated, as appropriate, in the form of organization charts, functional descriptions of departmental responsibilities and relationships, and job descriptions for key personnel positions, or in equivalent forms of documentation. These requirements shall be documented in the Plant Hatch Unit 2 updated FSAR.
b. The Plant Manager shall be responsible for overall unit safe operation 1 and shall have control over those onsite activities necessary for safe operation and maintenance of the plant, l i
c. The vice president shall have corporate responsibility for overall plant nuclear safety and shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining and providing technical support to the plant to eb tre nuclear safety. '

)

'J HATCH - UNIT 2 6-1 Proposed TS/0207q/118-80

.~ __

6.0 ADMINISTRATIVE CONTROLS

d. The individuals who train the operating staff and those who carry out

' health physics and quality assurance functions may report to the appropriate onsite manager; however, they shall have sufficient organizational freedom to ensure their independence from operating pressures.

6.2.2 UNIT STAFF

a. Each on duty shift shall be composed of at least the minimum shift crew composition shown in table 6.2.2-1.
b. At least one licensed Operator shall be in the control room for each reactor containing fuel.
c. At least two licensed Operators shall be present in the control room for each reactor in the process of start-up, scheduled reactor shutdown and during recovery from reactor trips.
d. An individual qualified to implement radiation protection procedures shall be on site when fuel is in either reactor.
e. All CORE ALTERATIONS shall be directly supervised by either a licensed Senior Reactor Operator or Senior Reactor Operator Limited to Fuel Handling who has no other concurrent responsibilities during this operation.

f.

A Fire Team of at least five members shall be maintained onsite at all times. The Fire Team shall not include the minimum shift crew necessary for safe shutdown on Units 1 and 2 or any personnel required for other essential functions during a fire emergency.

g. Administrative procedures shall be developed and implemented to limit the working hours of Unit staff who perform safety-related functions; e.g., senior reactor operators, reactor operators, auxiliary operators, health physicists, and key. maintenance personnel.

Adequate shift coverage shall be maintained without routine heavy i

use of overtime. The objective shall be to have operating personnel work a ncminal 40-hour week while the plant is operating. However, in the event that unforeseen problems require substantial amounts of overtime to be used or during extended periods of shutdown for refueling, major maintenance, or major plant modifications, the following guidelines shall be followed on a temporary basis:

(1) An individual should not be permitted to work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> straight, excluding shift turnover time.  !

HATCH - UNIT 2 6-2 Proposed TS/0207q/118-85 l

L __

P ADMINISTRATIVE CONTROLS (2) An individual should not be permitted to work'more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any 24-hour period, nor nore than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in any 48-hour period, nor more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any 7-day period, all excluding shift turnover time.

(3) A break of at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> should be allowed between work periods, including shift turnover time.

(4) Except during extended shutdown periods, the use of overtime should be considered on an individual basis and not for the-entire staff on a shif t.

Any deviation from the above guidelines shall be authorized by the Plant Manager or higher levels of management, in accordance with established procedures and with documentation of the basis for granting the deviation. Controls shall be included in the procedures such that individual overtime shall be reviewed monthly by the Plant Manager or his designee to assure that excessive hours have not been assigned. Routine deviation from the above guidelines is not authorized,

b. The Operations Superintendent, Operations Supervisor, and Shift Supervisors shall hold a senior reactor operator license. The plant operators and assistant plant operators shall hold a reactor operator license.

i l

l HATCH - UNIT 2 6-3 Proposed TS/0207q/118-85

. 7' .

ADMINISTRATIVE CONTROLS 6.3 UNIT STAFF QUALIFICATIONS 6.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971 for comparable positions, except for the Health Physics Superintendent who shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975, and the Shift Technical Advisor who shall have a bachelor's degree or equivalent in a scientific or engineering discipline with specific training in plant design, and response and analysis of the plant for transients and accidents.

6.4 TRAINING 6.4.1 A retraining and replacement training program for the unit staff shall be maintained under the direction of the Manager of Training and shall meet or exceed the requirements and recommendations of section 5.5 of ANSI N18.1-1971 and Appendix A of 10 CFR part 55.

6.4.2 A training program for fire protection shall be maintained under the direction of the Senior Regulatory Specialist and shall meet or exceed the requirements of section 27 of the NFPA Code-1975, except for fire protection training sessions which shall be held at least once per 92 days.

6.5 REVIEW AND AUDIT 6.5.1 PLANT REVIEW BOARD (PRB)

FUNCTION 6.5.1.1 The PRB shall function to advise the Plant Manager on all '

matters related to nuclear safety.

COMPOSITION 6.5.1.2 The PRB shall be composed of, as a minimum, a supervisor or higher level individual from each of the departments listed below: 1 t

Operations Maintenance Quality Control (QC)

Health Physics Nuclear Safety and Compliance Engineering Support The Chairman, his alternate, and other members of the PRB shall be designated by the Plant Manager. The Chairman and his designated alternate shall both be managers of one of the six above listed departments or a higher level onsite manager.

ALTERNATES 6.5.1.3 All alternate members shall be appointed in writing by the PRB Chairman to serve on a temporary basis; however, no more than two i

alternates shall participate as voting members in PRB activities at any one time.

1 i

HATCH - UNIT 2 6-5 Proposed TS/0207q/118-80 l

ADMINISTRATIVE CONTROLS MEETING FREQUENCY 6.5.1.4 The PRB shall meet at least once per calendar month and as convened by the PRB Chairman or his designated alternate.

QUORUM 6.5.1.5 The minimum quorum of the PRB necessary for the performance of the PRB responsibility and authority provisions of these Technical Specifications shall consist of the Chairman or his designated alternate and three voting members including alternates.

RESPONSIBILITIES 6.5.1.6 The PRB shall be responsible for:

a. Review of all procedures required by Specification 6.8 and changes thereto, except those for the Radiological Environmental Monitoring Program, any other proposed procedures or changes thereto as determined by the Plant Manager to affect nuclear safety,
b. Review of all proposed tests and experiments that affect nuclear safety,
c. Review of all proposed changes to Appendix A Technical Specifications.
d. Review of all proposed changes or modifications to unit systems or equipment that affect nuclear safety.
e. Investigation of all reportable violations of the Technical Specifications including the preparation and forwarding of reports I

covering evaluation and recommendations to prevent recurrence to the general manager, the vice president, and to the Safsty Review Board (SRB). l

f. Review of all REPORTABLE EVENTS.
g. Review of unit operations to detect potential nuclear safety hazards.
h. Performance of special reviews, investigations or analyses and reports thereon as requested by the Plant Manager or the SRB, i

HATCH - UNIT 2 6-6 Proposed TS/0201q/118-86

., ADMINISTRATIVE CONTROLS RESPONSIBILITIES (Continued)

1. Review of the Security Plan and implementing procedures and shall submit recommended changes to the SRB, J. Review of the Emergency Plan and implementing procedures and shall submit recommended changes to the SRB,
k. Review of any unplanned onsite release of radioactive material to the environs when such release is in excess of I Ci, excluding dissolved  ;

and entrained gases and tritium for liquid effluents, and in excess of 150 Ci of. noble gases or 0.02 Ci of radioiodines for gaseous effluents. Also included is the preparing and' forwarding to the Plant Manager and the SRB reports covering evaluation, recommendations and disposition of the corrective action to prevent recurrence.

1. Review of. changes to the PROCESS CONTROL PROGRAM and the OFFSITE DOSE CALCULATION MANUAL (0DCM), except for the section on the Radiological Environmental Monitoring Program in the 00CM.
m. Review of proposed change (s) to plant systems and equipment to determine whether the proposed change has a potential radiological e environmental impact. Such change (s) will be reported to the Manager-Radiological Safety.
n. Review of the Fire Protection Program and implementing procedures and shall submit recommended changes to the SRB.

AUTHORITY 6.5.1.7 The PRB shall:

a. Recommend in writing to the Plant Manager approval or disapproval of items considered under 6.5,1.6(a) through (d) above.

( b. Render determinations in writing with regard to whether or not each  !

I item considered under 6.5.1.6(a) through (e) above constitutes an unreviewed safety question. i
c. Provide written notification within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the general manager, the vice president, and the SRB of disagreement between the PRB and the Plant Manager; however, the Plant Manager shall have i responsibility for resolution of such disagreements pursuant to  ;

6.1.1 above.

RECORDS 6.5.1.8 The PRB shall maintain written' minutes of each PRB meeting that, at a minimum, document the results of all PRB activities performed under the j responsibility and authority provisions of these Technical Specifications.

Copies shall be provided to the general manager, the vice president.,

and the SRB. l- ,

1 HATCH - UNIT 2 6-7 Proposed TS/0201q/118-80 i

lp ADMlNTSTRATIVE CONTROLS O

6.5.2 SAFETY REVIEW BOARD (SRB)

FUNCTION 6.5.2.1 The SRB shall function to provide independent review and audit of designated activities in the areas of:

a. Nuclear power plant operations,
b. Nuclear engineering.
c. Chemistry and radiochemistry.
d. Metallurgy.
e. Instrumentation and control.
f. Radiological safety.
g. Mechanical and electrical engineering.
h. Quality assurance practices.

COMPOSITION 6.5.2.2 The SRB shall be composed of a minimum of five persons who as a group provide the expertise to review and audit the operation of a nuclear power plant. The Chairman and other members shall be appointed by the vice president or his designee. The composition of the SRB shall meet the requirements of ANSI N18.7-1976. l i ALTERNATES .

l 6.5.2.3 All alternate members shall be appointed in writing by the SRB Chairman to serve on a temporary basis; however, no more than a minority of alternates shall participate as voting members in SRB activities at any {

one time. However, in extenuating circumstances, the vice president l l may designate the use of additional alternates with voting authority when '

regular members are not available within necessary time constraints. l l

CONSULTANTS 6.5.2.4 Consultants shall be utilized as determined by the SRB Chairman to provide expert advice to the SRB.

MEETING FREQUENCY l

6.5.2.5 The SRB shall meet at least once per calendar auarter during the  !

initial year of unit operation following fuel loading and at least once per 6 months thereafter.

l HATCH - UNIT 2 6-8 Proposed TS/0201q/118-80

ADMINISTRATIVE CONTROLS QUORUM 6.5.2.6 The minimum quorum of the SRB necessary for the performance of the SRB review and audit functions of these Technical Specifications shall consist of the Chairman or his designated alternate and at least a majority of the members including alternates. No more than a minority of the quorum l shall have line responsibility for operation of the unit.

REVIEW 6.5.2.7 The SRB shall be responsible for the review of:

a. The safety evaluations for (1) changes to procedures, equipment, or systems and (2) tests or experiments completed under the {

provision of section 50.59, 10 CFR, to verify that such actions did not constitute an unreviewed safety question.

b. Proposed changes to procedures, equipment or systems which I involve an unreviewed safety question as defined in section 50.59, l 10 CFR.

I

c. Proposed tests or experiments which involve an unreviewed safety question as defined in section 50.59, 10 CFR.
d. Proposed changes to Technical Specifications or this Operating License.
e. Violations of codes, regulations, orders, Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance.
f. Significant operating abnormalities or deviations from normal and expected performance of unit equipment that affect nuclear safety.
g. All REPORTABLE EVENTS.
h. All recognized indications of an unanticipated deficiency in some aspect of design or operation of structures, systems, or components that could affect nuclear safety.
1. Reports and meetings minutes of the PRB.

HATCH - UNIT 2 6-9 Proposed TS/0201q/118-86

, ADMINISTRATIVE CONTROLS AUDITS 6.5.2.8 Audits of unit activities shall be performed under the cognizance of 4 the SRB. Each inspection or audit shall be performed within the specified time interval with:

1. A maximum allowable extension not to exceed 25 percent of the inspection or audit interval.
2. A total maximum combined interval time for any three consecutive inspections or audit intervals not to exceed 3.25 times the specified inspection or audit interval.

These audits shall encompass:

a. The conformance of unit operation to provisions contained within the Technical Specifications and applicable license conditions at least once per 12 months.
b. The performance, training and qualifications of the entire unit staff at least e,ce per 12 months.
c. The resuits of actions taken to correct deficiencies occurring in unit equipment, structures, systems or method of operation that affect nuclear safety at least once per 6 months.
d. The performance of activities required by the Operational Quality Assurance Program to meet the criteria of Appendix B, 10 CFR 50, at least once per 24 months.
e. The Emergency Plan and implementing procedures at least once per ,

12 months shall be per formed by individuals who have r 7 direct .

responsibility for implementation of this plan,

f. The Security Plan and implementing procedures at least once per 12 months shall be performed by individuals who have no direct responsibility for implementation of this plan.
g. Any other area of unit operation considered appropriate by the SRB or the vice president.

, h. The Fire Protection Program and implementing procedures at least once per 24 months.

l
i. An independent fire protection and loss prevention inspection and audit shall be performed annually utilizing either qualified offsite licensee personnel or an outside fire protection firm.
j. An inspection and audit of the fire protection and loss prevention program shall be performed by an outside qualified fire consultant at intervals no greater than 3 years. During the year in which the inspection or audit occurs, the requirements of 6.5.2.8.1. can be affected concurrently.

HATCH - UNIT 2 6-10 Proposed TS/0201q/118-80

. , . j

. P l l

. < e  ;

ADMINISTRATIVE CONTROLS i

k. The Radiological Environmental Monitoring Program and the results thereof annually.
1. The ODCM, Process Control Program, and implementing procedures at least once per 24 months.

AUTHORITY I 6.5.2.9 The SRB shall report to and advise the vice president on those l areas of responsibility specified in section 6.5.2.7 and 6.5.2.8. l 1

a RECORDS 6.5.2.10 Records of SRB activities shall be prepared, approved and distributed as indicated below:

a. Minutes of each SRB meeting shall be prepared, approved and forwarded to the vice president within 14 days following each l t meeting. i
b. Reports of reviews encompassed by section 6.5.2.7 above, shall be prepared, approved and forwarded to the vice president within l j 14 days following completion of the review.

c .,

Audit reports encompassed by section 6.5.2.8 above, shall be I forwarded to the vice president and to the management oositions l.

responsible for the areas audited within 30 days after completion of the audit. ,

l 6.6 REPORTABLE EVENT ACTION 6.6.1 The following actions shall be taken for REPORTABLE EVENTS: 1

) a. The Commission shall be notified and/or a report submitted pursuant to the requirements of section 50.73 to 10 CFR part 50, and l

b. Each REPORTABLE EVENT shall be reviewed by the PRB, and the results of this review shall be submitted to the SRB, the general manager, i and the vice president. '

)

6.7 SAFETY LIMIT VIOLATION 6.7.1 The following actions shall be taken in the event a Safety Limit is violated:

4

a. The unit shall be placed in at least HOT SHUT 00WN within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

i

b. The Safety Limit violation shall be reported to the Commission as soon as practical and in all cases within I hour of occurrence.

The general manager, the vice president and the SRB shall be notified within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. l HATCH - UNIT 2 6-11 Proposed TS/0201q/118-86

t .

.. o ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION (Continued)

c. A Licensee Event Report shall be prepared pursuant to 10 CFR 50.73.
d. The Licensee Event Report shall be submitted to the Commission in accordance with 10 CFR 50.73, and to the PRB, the SRB, the general manager, and the vice president within 30 days of the violation. l 6.8 PROCEDURES 6.8.1 Written procedures shall be established, implemented and maintained covering the activities referenced below:
a. The applicable procedures recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978.
b. Refueling operations.

t

c. Surveillance and test activities of safety related equipment.
d. Security Plan implementation.
e. Emergency Plan implementation.
f. Fire Protection Program implementation. i l

1

g. PROCESS CONTROL PROGRAM implementation.

l

h. ODCM implementation.

6.8.2 Each procedure of 6.8.1 and other procedures which the Plant Manager or Plant Support Manager has determined to affect nuclear safety, and changes thereto, shall be reviewed by the PRB and approved by the appropriate member of plant management, designated by the Plant Manager or <

Plant Support Manager, prior to implementation. The Plant Manager or Plant Support Manager will approve administrative procedures, security plan implementing procedures, and changes thereto. The Manager-Plant Training and .

Onsite Emergency Preparedness shall approve the emergency plan implementing  !

procedures and changes thereto. All other procedures of this specification l and changes thereto will be approved by the department head designated by the  !

Plant Manager or Plant Support Manager. The procedures of this specification l

shall be reviewed periodically as set forth in administrative procedures.

6.8.3 Temporary changes to procedures of 6.8.1 above may be made provided:

) a. The intent of the original procedure is not altered.

, HATCH - UNIT 2 6-12 Proposed TS/0201q/118-86 l

I

nistrative Contr_qli ion describes administrative and management controls established to the Environmental Technical Specifications (ETS). Heasures in this section include assignments of responsibility, review and ctions, procedures, and reporting requirements.

t responsibility for implementing the ETS and for assuring that the is operated in such a way as to provide protection for int rests with the vice president. thel pilities for compliance with the ETS and for the environmental hg program required by the ETS are given below.

Ant audit shall be provided, as discussed in section 5.3.2, by the Manager-Quality Assurance, consibility fhe Plant Manager is responsible for the environmental monitoring

. The Plant Manager is also responsible for implementing the surveillance activities described in section 4.

The General Manager-Quality Assurance is responsible for assuring i periodic audits of plant operation and the environmental monitoring es to ensure conformance with the ETS are conducted.

janization organization relative to environmental matters is presented in 13 of the Plant Hatch Unit 2 updated Final Safety Analysis Report.

UNIT 2 5-1

L 5,. ' .'

5.0 Administrative Controls This section describes administrative and management controls established to implement the Environmental Technical Specifications (ETS). Measures specified in this section include assignments of responsibility, review and audit functions, procedures, and reporting requirements.

Corporate responsibility for implementing the ETS and for assuring that the station is operated in such a way as to provide protection for environment rests with the vice president. thel Responsibilities for compliance with the ETS and for the environmental monitoring program required by the ETS are given below.

Independent audit shall be provided, as discussed in section 5.3.2, by the General Manager-Quality Assurance.

5.1 Resoonsibility 5.1.1 The Plant Manager is responsible for the environmental monitoring programs. The Plant Manager is also responsible for implementing the special surveillance activities described in section 4.

5.1.2 The General Manager-Quality Assurance is responsible for assuring that the periodic audits of plant operation and the environmental monitoring activities to ensure conformance with the ETS are conducted.

5.2 Organization Company organization relative to environmental matters is presented in Chapter 13 of the Plant Hatch Unit 2 updated Final Safety Analysis Report.

's HATCH - UNIT 2 5-1

_ _ - _ _ _ _ _ _ _ _ _ . _ _