Proposed Tech Spec Section 6.9.1.6,adding Reporting Requirements for Challenges to PORV & Pressurizer Code Safety Valves
ML20098B004
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/17/1984
From:
TOLEDO EDISON CO.
To:
Shared Package
ML20098A994 List:
References
TAC-56042, NUDOCS 8409250361
Download: ML20098B004 (1)


Text

_ _ .

~

[- ADMINISTRATIVE CONTROLS power operation), supplementary reports shall be submitted at least every three months until all three events have been completed.

ANNUAL OPERATING REPORTM ,,

6.9.1.4 Annual reports covering the activities of the unit during the previous calendar year shall be submitted prior to March 31 of each year.

The initial report shall be submitted prior to March 1 of the year following initial criticality.

6.9.1.5 Reports required on an annual basis shall include:

a. . A tabulation on an annual basis of the number of station, utility and other personnel (including contractors) receiving exposures greater than 100 mram/yr and their asso L remexposureaccordingtoworkandjobfunctions,g)atedman e.g.,

reactor operations and surveillance, inservice inspection, routine maintenance, special maintenance (describe maintenance),

. waste processing, and refueling. The dose assignment to various duty functions may be estimates based en pocket dosimeter, TLD, or film badge measurements. Small exposures totalling less than 20% of the individual total dose need not be accounted for. In the aggregate, at least SO: of the total whole body dose received from external sources shall be assigned to spec,ific major work functions. ,

4

b. The complete results of steam generation tube inservice inspections (Specification f.4'.'S','S.b).

f MONTHLYOPERAhTNGREORT*:

Y QerbdRdlShhhM ey

6. 9.1. 6 Routine reports of operating statistics 3end snutdcwn experienced shall be submitted on a monthly basis to the Dirhetor, Office of Managemen.

and Program Analysis, U.S. Nuclear Regulatory Commission, Washington. 0.C. 20555.

%S with a copy to the Regional Office..to arrive no later than the 15th of each

nonth following the calendar month covered by the report.

1 1/ A single submittal may be made for a multiple unit station. The subnittal should combine those sections that are c:m.cn to all units at the station, l' .

2f This tabulation supplements the re.quirements' of.120.407 of 10 C.R Part 20.

- DAVIS-SESSE, L' NIT 1,- 6-15 Amendment tio. MW,RIK i 8409250361 840917 PDR ADOCK 05000346 P PDR

[