Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20070N347 + (Proposed Findings of Fact.Certificate of Svc Encl)
- ML19326D112 + (Proposed Findings of Facts & Conclusions of Law Re Interim Fuel Cycle)
- ML19326D113 + (Proposed Findings of Facts & Conclusions of Law Re Interim Fuel Cycle)
- ML20083D802 + (Proposed Findings of Facts & Conclusions of Law Re Design QA Contentions.Certificate of Svc Encl)
- ML19209A325 + (Proposed Findings of Facts & Conclusions of Law in Form of Initial Decision.Concurs & Adopts Licensee Proposed Findings 1-17,w/some Mods)
- ML19329E348 + (Proposed Findings of Facts & Conclusions of Law.Activities of CPC Under CPs for Midland Will Not Create or Maintain Situation Inconsistent W/Antitrust Laws)
- ML20134C765 + (Proposed Findings/Conclusions on Contention 57-C-10 & Emergency Planning.License Should Not Be Issued Until Requirements of 10CFR50.47(a)(1) Met.Certificate of Svc Encl)
- ML19269B950 + (Proposed Fire Protection Presented in SER Has Been Reviewed & Found Acceptable.Exceptions Re Valve Supervision,Hose Coupling Gaskets,Hose Stations,Smoke Removal & Turbine Bldg Must Be Evaluated by NRC)
- ML19341B771 + (Proposed Fire Protection Tech Specs,Pages 3/4 7-32,7-33, 7-39 & 7-40 Re Diesel Fire Pump Surveillance,Foam Sys,Fire Barrier Penetrations & Spray & Sprinkler Sys)
- ML17244A317 + (Proposed Fire Protection as Presented in SER Adequately Assures Health & Safety of Public.Exception Re Valve Supervision & Cable Protection Must Be Evaluated by Nrc.Fire Protection Milestones & Documents Are Discussed)
- ML20065P952 + (Proposed First Set of Interrogatories.Proposed Motion for Production of Documents by NRC & Proof of Svc Encl)
- ML19269B682 + (Proposed Focus Area Review Approach of the Advanced Safety Evaluation Report with No Open Items for the Design Certification Application of the Nuscale Small Modular Reactor)
- ML20042B405 + (Proposed Formal Meeting W/Commissioners During Wk of 820322 or 29 to Review & Discuss Advisory Committee on Decontamination of TMI-2 Second Rept.Committee Should Meet Prior to Formal Meeting)
- ML20031C712 + (Proposed GE2000 CoC Revision Mark-ups to Be Included in Revision 28)
- ML20093B467 + (Proposed GE2000 CoC Revision Mark-ups to Be Included in Revision 28 of the CoC)
- ML22048B664 + (Proposed GI Memo Request for Review Immediate Safety Determination)
- ML20065M530 + (Proposed Gas Pipeline Leak Detection Sys)
- ML19295B812 + (Proposed General Statement of Policy & Procedure for Enforcement Actions, 10CFR2.Informs Licensees & Public of Basis for Taking Various Enforcement Actions.Comments Due by 801231.Suppls Encl)
- ML16203A394 + (Proposed Generic Communication Regarding Boraflex Degradation in Spent Fuel Pool Storage Racks)
- ML16203A388 + (Proposed Generic Letter 96-XX on Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves)
- ML16197A348 + (Proposed Generic Letter Regarding Loss of Reactor Coolant Inventory and Associated Potential for Loss of Emergency Mitigation Functions While in a Shutdown Condition)
- ML16224A111 + (Proposed Generic Letter Regarding Removal of Accelerated Testing and Special Reporting Requirements for Emergency Diesel Generators from Plant Technical Specifications)
- ML16288A281 + (Proposed Generic Letter Regarding Service Water System Problems Affecting Safety-Related Equipment)
- ML16295A157 + (Proposed Generic Letter on Individual Plant Examinations and the Proposed Integrated Safety Assessment Program II)
- ML16197A187 + (Proposed Generic Letter, Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-Of-Coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material in Th)
- ML19290B955 + (Proposed Goals for Radwaste Mgt)
- ML16246A168 + (Proposed Guidance for Implementation of the Maintenance Rule, 10 CFR 50.65)
- ML20087C627 + (Proposed Guidelines for 1983 Emergency Preparedness Field Exercise Scheduled for 831214)
- ML19242B583 + (Proposed Guidelines for Lab Testing of Geological Matl for Nuclear Power Facilities)
- ML19311C519 + (Proposed HI-STORM Umax Amendment 4 FSAR - Changed Pages)
- ML19311C518 + (Proposed HI-STORM Umax CoC Amendment 4 Appendix A- Changed Pages)
- ML20069J189 + (Proposed Hearing Schedule.Certificate of Svc Encl)
- ML19329C924 + (Proposed Hearing Schedule.Certificate of Svc Encl)
- ML20031B034 + (Proposed Hearing Schedule.Discovery Requests Would Be Filed by 811013,responses by 811027 & Testimony by 801130.Hearing Would Begin on 811214 & End on 820126.Initial Decision & Amend Issued on 820316-26.Certificate of Svc Encl)
- ML101310551 + (Proposed Hearing Schedules for IPEC License Renewal Proceeding)
- ML19220C331 + (Proposed Hydrostatic Testing of Vessel at 180 F & 2285 Psi Is Acceptable Re Fuel Assembly Integrity & Safety)
- ML20072L440 + (Proposed I&C TS)
- ML23038A162 + (Proposed IP JPM)
- ML042400370 + (Proposed ISFSI North Anna Power Station Units 1 & 2 and ISFSI Surry Power Station Units 1 & 2 and ISFSI Response to Request for Additional Information Safeguards Contingency Plan and Physical Security Plan)
- ML043510218 + (Proposed ISFSI North Anna Power Station Units 1 & 2 and ISFSI Surry Power Station Units 1 & 2 and ISFSI Review of Safety Evaluation Report (TAC Nos. MC2938, MC2939, MC2943, MC2944. MC2977. and MC2978))
- NL-17-1769, Proposed ISI Alternative FNP-ISI-ALT-22 Implementation of Code Case N-786-1 + (Proposed ISI Alternative FNP-ISI-ALT-22 Implementation of Code Case N-786-1)
- NL-18-1571, Proposed ISI Alternative VEGP-ISI-ALT-19-01 for Tendon Inservice Inspection Extension + (Proposed ISI Alternative VEGP-ISI-ALT-19-01 for Tendon Inservice Inspection Extension)
- EPID:L-2019-LLR-0017 + (Proposed ISI Alternative VEGP-ISI-ALT-19-01 for Tendon Inservice Inspection Extension)
- ML17241A045 + (Proposed ISI Alternatives NI-14-NDE-010 and N2-14-NDE-005 Reactor Pressure Vessel Nozzle Weld Inspections Response to Request for Additional Information)
- ML20212C096 + (Proposed ITS & Bases Changes Strikeout & Shadowed Text & Revision Bar Format,Increasing Licensed Capacity for Spent Fuel Assembly Storage in SFP & Revising Configuration for Storage of Fresh Fuel)
- ML20197G899 + (Proposed ITS 3.8.3,modifying Inventory Requirements for DG Lube Oil Sys)
- ML20206N140 + (Proposed ITS Administrative Controls Section 5.8, High Radiation Area)
- ML18066A455 + (Proposed ITS Pages 3.1.4-2 & 3.1.4-8,revising Completion Time for Action D.1)
- ML20195B708 + (Proposed ITS Section 3.3.8, EDG Lops, SR 3.3.8.1,revising Note for Surveillance & Deleting Note for Frequency)
- ML20198N347 + (Proposed ITS Tables 3.3.1-1 & 3.3.2-1,revising Twelve Allowable Values)
- PMNS20190646, Proposed Ideas to Enhance the Fuel Cycle Oversight Program + (Proposed Ideas to Enhance the Fuel Cycle Oversight Program)