Proposed ISFSI North Anna Power Station Units 1 & 2 and ISFSI Surry Power Station Units 1 & 2 and ISFSI Response to Request for Additional Information Safeguards Contingency Plan and Physical Security Plan
ML042400370
Person / Time
Site: Millstone, Surry, North Anna, 07200002  Dominion icon.png
Issue date: 08/23/2004
From: Grecheck E
Dominion Nuclear Connecticut, Dominion Resources, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, NRC/FSME
References
-RFPFR, 04-504, EA-03-086, TAC MC2938, TAC MC2939, TAC MC2943, TAC MC2944, TAC MC2977, TAC MC2978
Download: ML042400370 (5)


Text

Dominion Resources Services, Inc. X Do finio 50()0 [)ominion Boulevard, Glen Allen, VA 23060 SAFEGUARDS INFORMATION August 23, 2004 Re: 10 CFR 2.202 10 CFR 50.4 U.S. Nuclear Regulatory Commission Serial No.: 04-504 Attention: Document Control Desk NL&OS/MAE: RD Washington, D.C. 20555-0001 Docket Nos.: 50-245/336/423 50-338/339 50-280/281 72-2/16/47 License Nos.: DPR-21/65 NPF-49 NPF-47 DPR-32/37 SNM-2501 /2507 DOMINION NUCLEAR CONNECTICUT, INC.

VIRGINIA ELECTRIC AND POWER COMPANY MILLSTONE POWER STATION UNITS 1. 2.3 AND PROPOSED ISFSI NORTH ANNA POWER STATION UNITS 1, 2 AND ISFSI SURRY POWER STATION UNITS 1, 2 AND ISFSI RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION RE: SAFEGUARDS CONTINGENCY PLAN AND PHYSICAL SECURITY PLAN (TAC NOS. MC2938, MC2939, MC2943, MC2944. MC2977, AND MC2978)

The NRC issued an Order dated April 29, 2003, Requiring Compliance with Revised Design Basis Threat ("Order EA-03-086") and other security related Orders (collectively

'Orders") for the Millstone, North Anna and Surry Power Stations. Dominion Nuclear Connecticut, Inc. (DNC) and Virginia Electric and Power Company (Dominion) responded to Order EA-03-086 and other related Security Orders dated February 25, 2002, January 7, 2003 and April 29, 2003 by submission of the Physical Security Plan, the Contingency Plan and the Training and Qualification Plan in an April 26, 2004 letter (Serial No.04-242). The NRC issued requests for additional information (RAls) related to the Physical Security Plan, Safeguards Contingency Plan and Training and Qualification Plan in letters dated June 21, 2004, June 25, 2004, July 9, 2004, and July 23, 2004. DNC and Dominion responded to these RAls in letters dated July 1, 2004,

'Suly 8, 2004, two dated July 19, 2004, August 4, 2004, and August 10, 2004 (Serial Nos.04-395, 04-400, 04-400A,04-429, 04-400B, and 04-463 respectively).

Certain items contained in previous NRC RAls required further consideration or evaluation. In addition, other RAls were revised based on telephone conversations between Mr. Michael Burrell of the NRC and Mr. Nelson Martin and Ms. Margaret Earle of Dominion on August 17 and 18, 2004. The responses to these RAls are attached NOTE: THE ATTACHMENTS CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ATTACHMENTS, THIS PAGE IS "DECONTROLLED."

SAFEGUARDS INFORMATION

Serial No.04-504 RAI SCP and Sec. Plan Page 2 of 5 and respond to the NRC's RAls received to date. The appropriate Plan changes will be made after all the RAls related to the Plans are resolved.

Because of the requirement for these plans to be fully implemented by October 29, 2004; the need to integrate the requirements of the revised DBT Order with the Orders issued February 25, 2002, January 7, 2003, and April 29, 2003; and the Commission's determination that it would be appropriate to exercise enforcement discretion to accommodate any transitional issues which may arise as licensees, in good faith, take reasonable actions to implement the specific requirements of the Orders, DNC and

'Dominion request that enforcement discretion continue to be exercised during the transition period until full implementation of the plans is accomplished and the physical plant modifications and security force training are complete. At that time, the revised plans will be fully implemented and the exercise of enforcement discretion will no longer be necessary.

The attached material contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.

If you have any questions, please contact Ms. Margaret Earle at 804-273-2768.

Very truly yours, Eugene S. Grecheck Vice President - Nuclear Support Services Virginia Electric and Power Company Dominion Nuclear Connecticut, Inc.

Attachment:

Revised Responses to Request for Additional Information, Safeguards Contingency Plan and Physical Security Plan (Safeguards Information)

Commitments: The Plans will be revised after all the RAls related to the Plans are resolved.

Seral No.04-504 RAI SCP and Sec. Plan Page 3 of 5 Docket Nos.: 50-280/281 50-338/339 50-245/336/423 72-2/16/47 COMMONWEALTH OF VIRGINIA )

)

COUNTY OF HENRICO )

The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Eugene S. Grecheck who is Vice President -

Nuclear Support Services of Virginia Electric and Power Company and Dominion Nuclear Connecticut, Inc. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of those Companies, and that the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this 93 day of 1 &S I , 2004.

My Commission Expires: 3131 1 Cog ANotary Public (SEAL)

Serial No.04-504 RAI SCP and Sec. Plan Page 4 of 5 cc: Director of Nuclear Security (w/o Attachment)

Office of Nuclear Security and Incident Response U. S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike Rockville, MD 20852-2738 Secretary, Office of the Secretary of the Commission (w/o Attachment)

U. S. Nuclear Regulatory Commission ATTN: Rulemakings and Adjudications Staff Washington, D. C. 20555 Director, Office of Nuclear Reactor Regulation (w/o Attachment)

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Director, Spent Fuel Project Office (w/o Attachment)

Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Assistant General Counsel for Materials Litigation and Enforcement (w/o Attachment)

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 U. S. Nuclear Regulatory Commission (w/o Attachment)

Region I Regional Administrator 475 Allendale Road King of Prussia, PA 19406-1415 U.S. Nuclear Regulatory Commission (w/o Attachment)

Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303-8931 Ms. M. J. Ross-Lee (w/o Attachment)

U. S. Nuclear Regulatory Commission, Mail Stop 0 13 D13 Washington, D. C. 20555

Serial No.04-504 RAI SCP and Sec. Plan Page 5 of 5 Mr. S. C. O'Connor (w/o Attachment)

U. S. Nuclear Regulatory Commission, Mail Stop 0 13 D13 Washington, D. C. 20555 Mr. S. R. Monarque (w/o Attachment)

NRC Project Manager North Anna and Surry U. S. Nuclear Regulatory Commission , Mail Stop 8 H12 Washington, D. C. 20555 Mr. A. B. Wang (w/o Attachment)

NRC Project Manager Millstone Unit 1 U. S. Nuclear Regulatory Commission, Mail Stop 7 El Washington, D. C. 20555 Mr. V. Nerses (w/o Attachment)

NRC Senior Project Manager Millstone Units 2 & 3 U. S. Nuclear Regulatory Commission, Mail Stop 8 C2 Washington, D. C. 20555 Mr. R. J. Prince (w/o Attachment)

NRC Inspector 475 Allendale Road King of Prussia, PA 19406-1415 Mr. M. T. Widmann (w/o Attachment)

NRC Senior Resident Inspector North Anna Power Station Mr. N. P. Garrett (w/o Attachment)

NRC Senior Resident Inspector Surry Power Station Mr. S. M. Schneider (w/o Attachment)

NRC Senior Resident Inspector Millstone Power Station