Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20086T608 + (Preapplication Safety Evaluation Report for the Sodium Advanced Fast Reactor (Safr) Liquid Metal Reactor)
- ML16300A286 + (Preapplication Safety Evaluation Report for the Modular High Temperature Gas Cooled Reactor)
- ML20098F068 + (Preapplication Teleconference Presentation: License Amendment Request to Adopt TSTF-569)
- ML22168A026 + (Preapplication Teleconference with Union Electric Company to Discuss a Spent Fuel Pool License Amendment Request for Callaway Plant, Unit No. 1)
- ML18162A047 + (Preapplication Teleconference with Xcel Energy)
- ML18149A556 + (Preapplication Teleconference with Xcel Energy)
- ML20212F934 + (Precalculations for Sandia Direct Containment Heating (DCH-1) Test)
- RIS 2008-11, Precautions to Protect Children Who May Come in Contact with Patients Released After Therapeutic Administration of Iodine-131 + (Precautions to Protect Children Who May Come in Contact with Patients Released After Therapeutic Administration of Iodine-131)
- Information Notice 2008-03, Precautions to Take Before Sharing Sensitive Security-Related Information + (Precautions to Take Before Sharing Sensitive Security-Related Information)
- ML051380092 + (Precedent Table, Civil Section 3.5)
- ML051380086 + (Precedent Table, Elec. Section 3.6)
- ML051380094 + (Precedent Table, Mech Section 3.1)
- ML051380095 + (Precedent Table, Mech Section 3.2)
- ML051380098 + (Precedent Table, Mech Section 3.3)
- ML051380099 + (Precedent Table, Mech Section 3.4)
- ML052000234 + (Precedents for Section 3.1 Exceptions to GALL)
- ML052000237 + (Precedents for Section 3.2 Exceptions to GALL)
- ML052000241 + (Precedents for Section 3.3 Exceptions to GALL)
- ML052000440 + (Precedents for Section 3.5 Exceptions to GALL)
- ML052000454 + (Precedents for Section 3.6 Exceptions to GALL)
- ML20010A140 + (Precharacterization Report for Instrumented Fuel Assembly (IFA)-527)
- ML19318B544 + (Precharacterization Rept for Instrumented Nuclear Fuel Assembly IFA-513)
- ML18005A834 + (Precipitation Frequency - AMS 2018 Meeting Presentation)
- ML19346E657 + (Precipitation Frequency Analysis - Issues of Storm Typing)
- 05000416/FIN-2012008-01 + (Preconditioning of 4160 Vac Circuit Breakers for As-Found Tests)
- 05000482/FIN-2011005-03 + (Preconditioning of 480 Vac Breakers Prior to Required Surveillance Testing)
- 05000317/FIN-2013005-02 + (Preconditioning of Containment Air Coolers Emergency Outlet Valves)
- 05000416/FIN-2009006-01 + (Preconditioning of Division II Standby Diesel Generator Jacket Water Heat Exchanger)
- 05000219/FIN-2010003-01 + (Preconditioning of Isolation Condenser Valves Prior to ASME In-service Test)
- Information Notice 1996-24, Preconditioning of Molded-Case Circuit Breakers Before Surveillance Testing + (Preconditioning of Molded-Case Circuit Breakers Before Surveillance Testing)
- Information Notice 1997-16, Preconditioning of Plant Structures, Systems, and Components Before ASME Code Inservice Testing or Technical Specification Surveillance Testing + (Preconditioning of Plant Structures, Systems, and Components Before ASME Code Inservice Testing or Technical Specification Surveillance Testing)
- Information Notice 2012-16, Preconditioning of Pressure Switches Before Surveillance Testing + (Preconditioning of Pressure Switches Before Surveillance Testing)
- 05000286/FIN-2010002-02 + (Preconditioning of RWST Level Switch)
- 05000263/FIN-2009004-01 + (Preconditioning of Safety Related Pressure Switches During Surveillance Testing)
- 05000302/FIN-2010007-01 + (Preconditioning of Safety-Related Air Operated Valves)
- 05000338/FIN-2009004-05 + (Preconditioning of the Low Head Safety Injection Motor Operated Valves)
- 05000354/FIN-2012003-01 + (Preconditioning of the Reactor Building to Torus Vacuum Relief Valves)
- 05000219/FIN-2015004-01 + (Preconditioning of the Standby Liquid Control Relief Valves)
- 05000321/FIN-2009002-02 + (Preconditioning of the Turbine Building Plant Service Water Isolation Valves)
- 05000237/FIN-2009005-03 + (Preconditioning the Unit 2 Emergency Diesel Generator Prior to Performing TS Surveillance Requirements)
- IR 05000389/1975002 + (Preconst Insp Rept 50-389/75-02 on 750408-10.No Violations Noted.Major Areas Inspected:Qa Program for Const)
- IR 05000389/1975003 + (Preconst Insp Rept 50-389/75-03 on 750811-15.No Deviations Noted.Major Areas Inspected:Qa Program)
- IR 05000389/1975004 + (Preconst Insp Rept 50-389/75-04 on 751105-07.No Deviations Noted.Major Areas Inspected:Project Status,Organization,Qa Personnel,Const,Design,Procurement,Qa Manual,Procedures, Training & Audits)
- ML20037C582 + (Preconst Monitoring Annual Summary)
- ML19224C987 + (Preconstruction Ecological Studies for Site, Suppl to May 1978 Final Rept)
- ML20005A060 + (Preconstruction Flood Prone Area)
- ML20005A062 + (Preconstruction Flood Prone Area and Property Line)