Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML061230119 + (Letter Accompanying Limerick - Supplement to the Request for License Amendment Related to Application of Alternative Source Term, Dated February 27, 2004)
- ML19098B403 + (Letter Acknowledge Receipt of Amendment No. 29 & Informing, Inconsistency Between Amendment No. 29 and Technical Conclusions of Safety Evaluation)
- ML13039A435 + (Letter Acknowledgement Letter for 60-day Response to Issuance of Flooding Integrated Assessment Guidance Related to the NTTF Recommendation 2.1, Flooding Reevaluations)
- ML17037B572 + (Letter Acknowledging Receipt of 01/07/1976 Letter for Modification to Reactor Building Crane)
- ML17037B566 + (Letter Acknowledging Receipt of 02/27/1976 Communication and to Provide Clarification on Certain Items)
- ML17037B545 + (Letter Acknowledging Receipt of 05/19/1976 Letter Reporting Apparent Exposures of Five Individuals to Radiation)
- ML17037B574 + (Letter Acknowledging Receipt of 12/29/1975 Letter Proposing Revised Technical Specifications to Preclude Plant Operation with Cracked Control Rod Drive Collet Housings)
- ML17037B972 + (Letter Acknowledging Receipt of 7/20/1973 Letter and Report of Advisory Committee on Reactor Safeguards)
- ML17037C245 + (Letter Acknowledging Receipt of January 29, 1974 Letter Relative to High Energy Line Breaks Outside the Containment and Advising That One Signed Original and Thirty-Nine Copies Will Be Forwarded)
- ML17037B974 + (Letter Acknowledging Receipt of Letter Dated 06/15/1973 with Enclosure Concerning Safety Evaluation for Plant)
- ML021270245 + (Letter Acknowledging Receipt of Ltr. from Laura Stamas Sent to Chairman Meserve Regarding Vermont Yankee Nuclear Power Plant)
- ML17037C128 + (Letter Acknowledging Receipt of September 18, 1972 Letter Asking for Information Regarding Types and Quantities of Nuclides and Advising Plans to Make Information Available by October 10, 1972)
- ML17037C206 + (Letter Acknowledging Receipt of the Analysis on ATWS with Letter of September 25, 1974 and Requesting Submittal of Additional Analysis, an Explanation for the Delay, and a Schedule of the Detailed Plan within Two Weeks)
- ML17037C552 + (Letter Acknowledging Receipt of the April 3, 1973 Letter Relative to the Reliability of the Main Steam Isolation Valves on Larger BWR Units and Advising That the Information Will Be Provided within the Specified 90 Day Period)
- ML17037C249 + (Letter Acknowledging Receipt of the December 19, 1973 Letter Relative to the Dynamic Effect on the Torus Structure of Relief Valve Blowdowns Into the Torus Water and Advising That Niagara Mohawk Will Reply within Specified Time)
- ML17037C364 + (Letter Acknowledging Receipt of the February 15, 1972 Letter Informing Niagara Mohawk That It Will Be Necessary to Submit an Environmental Report with the Application for a Full-Term Operating License)
- ML17037C551 + (Letter Acknowledging Receipt of the July 16, 1973 Letter Concerning Fuel Densification Effects in the Unit 1 Core and Advising That an Adequate Response Will Be Available within the 30-Day Time Period)
- ML17037C278 + (Letter Acknowledging Receipt of the July 6, 1973 Letter Relative to Section 50.50 of 10 CFR Part 50 Concerning Operating Licenses for Nuclear Power Plants)
- ML17037C277 + (Letter Acknowledging Receipt of the July 5, 1973 Letter Regarding the Draft Environmental Statement and Copy of the Notice of Availability of AEC Draft Environmental Statement)
- ML17037C219 + (Letter Acknowledging Receipt of the June 21, 1973 Letter Reporting the Exposure of an Individual to Radioactive Material and Advising That the Matter Will Be Examined During a Future Inspection)
- ML17037C257 + (Letter Acknowledging Receipt of the October 1, 1973 Letter Relative to Hydraulic Shock Suppressors (Snubbers) and Advising That Niagara Mohawk Is Prepared to Submit the Requested Information)
- ML17037C258 + (Letter Acknowledging Receipt of the September 25, 1973 Letter with Respect to Inverted Poison Tubes in the Control Rods)
- ML18348A720 + (Letter Addendum No. 1 to Report on Tube Repair by Sleeving)
- ML18348A698 + (Letter Addendum to Cycle II Start-Up Report)
- ML14127A170 + (Letter Addendum to Joint Proposed Schedule)
- ML18348A696 + (Letter Addendum to the Cycle II Start-Up Report)
- ML18108A574 + (Letter Additional Financial Information)
- ML18219D871 + (Letter Additional Information on Over-Pressurization Mitigating System)
- ML18219D925 + (Letter Additional Information on Seismic Qualification of Conduit Systems)
- ML18219D866 + (Letter Additional Information on Use of Butt Spliced Connections for Electrical Penetrations on the Inside of the Containment)
- ML18219D868 + (Letter Additional Information on Use of Butt Spliced Connections for Electrical Penetrations on the Inside of the Containment)
- ML021640363 + (Letter Addressed to Mr. Robert Barrett Re Notice of Enforcement Discretion for Entergy Nuclear Regarding Indian Point Unit 3 (NOED No. 2002-01-02))
- ML022810516 + (Letter Addressed to Mr. Shriver Notice of Enforcement Discretion (NOED) for PPL Susquehanna, LLC Regarding Susquehanna Steam Electric Station Unit 1 (NOED No. 2002-01-03))
- ML19276D401 + (Letter Addressed to the Honorable Carolyn B. Maloney from Margaret M. Doane, Executive Director for Operations)
- ML19276D406 + (Letter Addressed to the Honorable Ron Johnson from Margaret M. Doane, Executive Director for Operations)
- ML18219E000 + (Letter Adequacy of Reactor Pressure Vessel Supports)
- ML17234A700 + (Letter Advanced Notification to American Tribes of Transportation of Certain Types of Nuclear Waste - Title 10 of the Code of Federal Regulations Part 71 and 73)
- ML18230A205 + (Letter Advising CP&L Revising Standard Review Plans to Clarify Requirements Relating Postulated High Energy Line Break Outside Containment for Design of Pipe Tunnel for Main Steam Line & Feedwater Line, & Requesting Review & Advise)
- ML18230A215 + (Letter Advising CP&L Will Install Axial Power Distribution Monitoring System to Maintain Maximum Allowable Power Peak Factor Used in ECCS Calculations)
- ML18230A185 + (Letter Advising Carolina Power & Light Company Is Applying Valve Wall Thickness Verification Program That Is in Excess of Requirements Necessary to Assure That Procured Valves Meet Code and Are Safe and Reliable)
- ML18230A557 + (Letter Advising Carolina Power & Light Company Will Prepare to Meet mid-Nov. Hearing Date & Suggests Filing Date for Prepared Testimony Should Be Set Two Weeks in Advance)
- ML19031C065 + (Letter Advising Change of Name of Law Firm to Reflect on NRC Service List)
- ML17037B585 + (Letter Advising Design Criteria and Appropriate Proposed Technical Specifications Will Be Provided by September, 1978)
- ML18227D260 + (Letter Advising Extension of Planned Submittal Date for Proposed Tech Spec Amendment Re HP Supervisor Requirements)
- ML18227D329 + (Letter Advising FPL Has Joined Utility Task Group to Examine Complexity of Reactor Vessel Overpressurization & to Develop Solution)
- ML18227D338 + (Letter Advising FPL Is a Full Participating Member of Nuclear Plant Reliability Data System)
- ML18219E013 + (Letter Advising Facility Had Violated Tech Spec Procedures Whereas Static Pressure Leg Was Improperly Applied in Calibration of Pressurizer Pressure Transmitters)
- L-76-283, Letter Advising Florida Power & Light Company Recently Has Recently Become a Full Participating Member of Nuclear Plant Reliability Data System, & Is Expending Effort Necessary for Full Implementation of This Voluntary Program + (Letter Advising Florida Power & Light Company Recently Has Recently Become a Full Participating Member of Nuclear Plant Reliability Data System, & Is Expending Effort Necessary for Full Implementation of This Voluntary Program)
- ML17252B321 + (Letter Advising Intended Corrective Action Concerning Items Noted in Paragraph 5 of Form AEC-592 on 11/25/1970 - Dresden Unit 2)
- ML18219D970 + (Letter Advising Sections of Annual Report Have Been Already Been Prepared & It Is Not Practical to Follow New Model Format for 1976 Annual Report)
- ML18230A346 + (Letter Advising Shearon Harris Units 1, 2, 4, & 3 Have Been Rescheduled for Commercial Operation in 1984, 1986, 1988, & 1990, Respectively Due to Revised Construction Program)