NRC FORM~5 I2.76 I U.S. NUCLEAR REGULATORY
'ISSION gv
~
)
NRC DISTRIBUTlON FQR PART 50 DOCKET NIATERlAL DOCKET NUMBER O-SIN FILE NUMBER MR J G KEPPLER M'NDIANA5 MICHIGAN POWER CP BRIDGMANp MICH R W JURGENSEN DATE OF DOCUMENT t-( i-DATE QECEIVED 4- ~'i-9
+LETTER CIORIGINAL COPY CINOTORIZED UNCLASSIFIED PROP INPUT FORM NUMBER OF COPIES RECEIVED DESCRIPTION LTR RE THEIR 66-17-76 SUBMITTAL.'.......,)
ADVISING THEIR FACILITY HAD VIOLATED TECH SPEC PROCEDURES WIIEREAS STATIC PRESSURE LEG WAS IM-PROPERLY APPLIED IN THE CALIBRATIONOF THE PRESSURIZER PRESSURE TRANSMITTERS............
ENCLOSURE I/
ACKNOWL DGEB.
PLANT NAME EMOVg
>ONOT g SAFETY ASSIGNED AD!
BRANCH CHXEF!
PROJECT MANAGER!
LIC~ ASST.:
X. Ll. C.
FOR ACTION/INFORMATION ASS NED AD'RO..
&NA
~
'G FI NRC PDR I&E OELD GOSSICK & STAFF MXPC CASE HANAUER A LES INTERNAL D SYSTEMS SAFETY HEXNEHAN SCHROEDER ENGXNEERXNG HACCARRY KNIGHT SIHIPEIL PAWLICKI ISTRI BUTION
~ BENAROYA IPPOLITO K RKIPOOD OPERATXNG REACTORS SXTE SA ENV RO VA PROJECT MANAGEHEN BOYD P
COLLINS HOUSTON PETERSON HELTZ IIELTEMES SKOVHOLT LPDR.
b TIC:
N ASLB!
ACRS CYS HOLDIN NRC FORM 195 I2.7G)
EN REACTOR SAFE'EY ROSS NOVAK ROSZTOCZY CHECK SALTZH4N RUTBERG EXTERNAL DISTR IBUTION NAT LAB!
REG, VIE LA PDR CONSULTANTS OPERA N
TECH EISENH SHAO BAER BUTLER CRIMES BROOKIIAVEN ULRIKSON ORNL CONTROL NUMBER I <AD
C 0
~
~
~
~
~
~
f
~ \\
' \\ 0 ~
~ ~ <<
~
~
1 1
Iw'>.@
'M%
yt<pI>~IIVDIAFiA 5 IVIICI'IIGAN PO kYE8 COMPANY DONALD C. COOIC NUCLEAR PLANT P.O. BOx 458, Bridgman, Michignn 49I06 June 17, 1976 Mr. J.G.
- Keppler, Regional Directo Office of Inspecti on and En forceme United States hucl ear Regulatory Coi Region III 799 Roosevelt Road Glen Ellyn, IL 60137 y10t, j~g Daemon
~ INDBQ 3bQ lease ceca~~
gOMMISSlag
~i'ino ion
Dear Mr. Keppler:
Operating License DPR-58 Docket No. 50-315 This letter is to confirm our verbal report to NRC Inspector, K.R. Baker, on June 17, 1976.
On June 16,
- 1976, Mr. Baker was reviewing Instrument Maintenance Procedure data and determined that we had violated Appendix A Technical Specification Section 2.2.
1 and Table 2.2-1 Item 9.
Due to procedural error the correction for the static pressure leg was improperly applied in the calibration of the pressurizer pressure transmitters.
The error had been found ar.'. corrected on April 12, 1976, but had not been reported to the NRC.
Plant Nuclear Safety Review Committee review of this incident on June 17, 1976, revealed that we had a1so violated Appendix A Technical Specification Sections 3.3.2. 1, Table 3.3-4 Item ld and 3..2.5.
The PNSRC's analysis of this error indicates that the health and safety of the public was not in jeopardy.
Our investigation is continuing and a formal report wi 11 be submitted as required by HRC Regulatory Guide 1.16, Revision 4, by July 1, 1976.
Sincerely, R.W. Ju nse Plant Manager
/bab cc:
Listed on following page...
62'10
ri
. J.G.
Keppler June 17, 1976 Page 2 of 2 cc:
R.S.
Hunter J.E.
Dolan G.E. Lien R. Kilburn R.J. Vollen BPI R.C. Callen MPSC K.RE Baker RO:III P.W. Steketee, Esq.
R. Walsh, Esq.
G. Charnoff, Esq.
G.
Olson J.M. Hennigan PNSRC R.S.
Keith Dir., IE (40 copies)
Dir.,
MI PC (4 copies)
~ '
I 1
f