Letter Additional Information on Seismic Qualification of Conduit Systems
ML18219D925
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/30/1976
From: Dolan J
American Electric Power Service Corp
To: James Keppler
NRC/IE, NRC/RGN-III
References
Download: ML18219D925 (3)


Text

0 AMERICAN ELECTRIC POWER Service Corporati on 1

2 Broactuay, Rem York, K Y. I0004 (2I2) 422.4800 ZOEINE. DOi.hN Senior Fuccncicc t ice Prccidcnc Enginccring 4 Conc[roc(ion September 30, 1976 Donalcl C. Cook Nuclear Plant Units 1 6 2

Docket Hos.

50-315 and 50-316 DPR No.. 58 and CPPR No.

61 Mr. J. G.,Kepplex, Regional Director U.S. Nuclear Regulatoxy Commission Office of Xnspection and Enforcement Region XXX 799 Roosevelt Road Glen Ellyn, Xllinois 60137

Dear Mx. Keppler:

Xn my August 18, 1976 letter to you, concerning

,seismic qualification of conduit systems, X indicated that additional information and a schedule for the review of the installed conduit systems would be provided to you by September 30, 1976.

Since my first letter, several meetings have been held with the organization that analyzed our cable trough syst: em fox seismic qualification and with oux seismic consultant.

A combined testing and analytical approach to the problem has been selected.

A General Test Description Document has been prepared and several types of conduit clamps and typical supports are to be tested to determine theix seismic support characteristics.

A Design Criteria Document has been

'repared.

A dynamic analysis of the overall conduit systems (conduit, clamps and supports) will be performed utilizing the support characteristics as obtained fxom the testing..program.

0ur Nation'2 "00th Year

$ 976 Onr CoInpanig's 70th Year ocr

/

Mz. J.

G. Keppleg eptember 30, 1976 This approach requires an investigation of the "as-installed" conduit systems at the plant to assure that the different. methods of supporting conduit are considered.

After the testing, field data gathering and analyses are complete, criteria and instructions for implementation of any modifications shall be developed.

Implementation of these modifications at the plant shall be supervised by Indiana S Michigan Power Company personnel.

1 The following schedule is now anticipated:

I

~

Field'ata Gathering...............October 1976 Completion of Testing..............December 1976 Completion of Analysis.............January, 197 7 Development of Typical 6 Special Suppoxts...........................February 1977 Begin Field Implementation.......

~.March 1977 Xt is not possible at this time to estimate how long it will take to complete any modifications.

" When the analysis and development of typical and special supports are completed, it should be possible to establish a scheduled completion date for implementation at. the plant.

Vexy truly yours, John E. Dolan Senior Executive Vice President Engineering and Construction JED:mam cc:

G.

R.

P ~

R R

R.

R Charnoff Walsh W. Steketee J. Vollen C. Callen S. Hunter W. Jurgensen - Bridgman