Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20077C507 + (Increased Core Flow & Extended Load Line Limit Analysis for Hope Creek Generating Station Unit 1,Cycle 2)
- ML20207B389 + (Increased Core Flow & Partial Feedwater Heating Analysis for Limerick Generating Station Unit 1 Cycle 1. Related Correspondence)
- Information Notice 2020-01, Increased Electronic Equipment Issues After Electrostatic Cleaning + (Increased Electronic Equipment Issues After Electrostatic Cleaning)
- Information Notice 1992-33, Increased Instrument Response Time When Pressure Dampening Devices are Installed + (Increased Instrument Response Time When Pressure Dampening Devices are Installed)
- Information Notice 1992-33, Increased Instrument Response Time When Pressure Dampening Devices Are Installed + (Increased Instrument Response Time When Pressure Dampening Devices Are Installed)
- ML18039A882 + (Increased MSIV Leakage Tech Spec Change Submittal - Seismic Evaluation Rept)
- Information Notice 1986-59, Increased Monitoring of Certain Patients with Implanted Coratomic, Inc. Model C-100 and C-101 Nuclear-Powered Cardiac Pacemakers + (Increased Monitoring of Certain Patients with Implanted Coratomic, Inc. Model C-100 and C-101 Nuclear-Powered Cardiac Pacemakers)
- 05000334/LER-1981-077-03, Increased Radiation Levels in Auxiliary Bldg Discovered.Caused by Crack in Welded Pipe Connection Joining Two 1A Degassifier Recovery Hx.Crack Due to Thermal Stress Fatigue + (Increased Radiation Levels in Auxiliary Bldg Discovered.Caused by Crack in Welded Pipe Connection Joining Two 1A Degassifier Recovery Hx.Crack Due to Thermal Stress Fatigue)
- ML18088B190 + (Increased Water Hole Peaking in Operating Reactors)
- ML19322B150 + (Increases Funding for Consulting Contract Due to Addl Review of Underwater Weir Per AEC 661222 & s)
- ENS 49290 + (Increasing Background Noise in Stack Radiation Monitor Renders It Non-Functional)
- ML070360219 + (Increasing U.S. Representation from NRC on the IAEA Staff)
- ML20203M999 + (Incredible Tale of Texasgulf Cane Creek Number 7 Well & Anisotropic Extension Fracture Permeability,Paradox Basin, Ut)
- ML19320D395 + (Increment of Analysis,Estimated Airbourne Release of Pu from Exxon Nuclear Mixed Oxide Fuel Plant at Richland,Wa as Result of Postulated Damage from Severe Wind & Earthquake Hazard)
- ML19320B050 + (Increment of Analysis:Estimated Airborne Release of Pu from Exxon Nuclear Mixed Oxide Fuel Plant at Richland,Wa as Result of Postulated Damage from Severe Wind & Earthquake Hazard)
- ML24132A009 + (Incremental Extension of Burnup Limit for Westinghouse and Combustion Engineering Fuel Designs)
- ML19254E800 + (Incremental Risk Assessment of Performance of Nonsafety- Grade Equipment Subjected to Adverse Environ)
- ML14304A629 + (Incs Motion for Leave to File Amicus Curiae Brief)
- ML18173A053 + (Ind. Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Sig. Hazards .)
- 05000286/LER-2011-005, Indain Point, Unit 3 Regarding Automatic Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps Due to Undervoltage on 480 Vac Vital Buses Due to a Loss of Offsite Power During a Severe Storm + (Indain Point, Unit 3 Regarding Automatic Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps Due to Undervoltage on 480 Vac Vital Buses Due to a Loss of Offsite Power During a Severe Storm)
- ML070510069 + (Indeck Energy Services, 50 MW Gas Turbine Combined Cycle Cogeneration Facility)
- LIC-12-0016, Indefinite Delay in Extended Power Uprate for Fort Calhoun Station, Unit No. 1 + (Indefinite Delay in Extended Power Uprate for Fort Calhoun Station, Unit No. 1)
- ML16293A251 + (Indemnity Agreement Amendment 9)
- ML19308E235 + (Indemnity Agreement B-54)
- ML102430361 + (Indemnity Agreement B-59, Amendment No. 14)
- ML15175A141 + (Indemnity Agreement B-62)
- ML20353A162 + (Indemnity Agreement B-64, Amendment 15)
- ML20353A177 + (Indemnity Agreement B-64, Amendment 15 (2))
- ML20353A183 + (Indemnity Agreement B-64, Amendment 15 (3))
- ML20062A893 + (Indemnity Agreement B-84)
- ML20062F738 + (Indemnity Agreement B-86 Between Sceg,Sc Pub Svc Auth, & NRC Describing Amount of Financial Protec, & Location of Licensee)
- ML19296B068 + (Indemnity Agreement B-89 Between NRC & Tva,Excecuted by NRC)
- ML25266A222 + (Indemnity Agreement No. B-11 Amendment 25)
- ML24046A092 + (Indemnity Agreement No. B-11 Amendment No. 24)
- ML18320A239 + (Indemnity Agreement No. B-41 and Amendments)
- ML18057B136 + (Indemnity Agreement No. B-46)
- ML18057B134 + (Indemnity Agreement No. B-46 for Turkey Point)
- ML053630248 + (Indemnity Agreement No. B-92, Amd. 7 (New Name: Entergy Louisiana, LLC))
- ML25218A077 + (Indemnity Agreement TAR)
- ML19036A944 + (Indemnity Agreements for Arkansas Nuclear One Units 1 and 2, and Grand Gulf Nuclear Station, Unit 1)
- RA-15-0044, Indemnity Agreements for Proof of Acceptance + (Indemnity Agreements for Proof of Acceptance)
- RA-16-0037, Indemnity Agreements for Proof of Acceptance + (Indemnity Agreements for Proof of Acceptance)
- ML060900180 + (Indep. Spent Fuel Storage Installation, License Amendments Regarding Proposed Corporate Restructuring)
- ML20006F210 + (Indepedent Spent Fuel Storage Installations)
- ML22111A284 + (Independence Spent Fuel Storage Installation - Issuance of Exemption)
- ML23166B083 + (Independence Spent Fuel Storage Installation - Issuance of Exemption)
- ML15016A118 + (Independent Accountants Report on Applying Agreed-Upon Procedures for the Pennsylvania State University - Related Annual Financial Test Submittal and Self - Guarantee - Year Ending June 30, 2014)
- ML15027A447 + (Independent Accountants Report on Applying Agreed-Upon Procedures for the Pennsylvania State University - Related Annual Financial Test Submittal and Self-Guarantee - Year Ending June 30, 2014)
- ML20199L589 + (Independent Analysis & Evaluation of AM-241 & Transuranics & Subsequent Dose to Two Male Workers at Connecticut Yankee Atomic Power Plant)
- ML20196C164 + (Independent Assessment & Analysis, Monthly Progress Rept for Period Ending 880131)
- ML20024C450 + (Independent Assessment Program)