MONTHYEARML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements IR 05000416/20240122024-09-17017 September 2024 License Renewal Post Approval Phase 2 Inspection Report 05000416/2024012 ML24257A0172024-09-17017 September 2024 Request for Withholding Information from Public Disclosure Unit 1 ML24254A3602024-09-10010 September 2024 Pre-Submittal Slides for License Amendment Request, Criticality Safety Analysis, Technical Specification 4.3.1, Criticality and Technical Specification 5.5.14, Spent Fuel Storage Rack Neutron Absorber Monitoring Program IR 05000416/20244022024-09-0909 September 2024 Security Baseline Inspection Report 05000416/2024402 IR 05000368/20253012024-09-0909 September 2024 Notification of NRC Initial Operator Licensing Examination 05000368/2025301 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000313/20240112024-09-0505 September 2024 Comprehensive Engineering Team Inspection Report 05000313/2024011 and 05000368/2024011 IR 05000313/20244042024-08-29029 August 2024 Cybersecurity Inspection Report 05000313/2024404 and 05000368/2024404 05000416/LER-2024-003, Feedwater Inlet Check Valve Incorrectly Determined Operable2024-08-26026 August 2024 Feedwater Inlet Check Valve Incorrectly Determined Operable ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24235A0832024-08-22022 August 2024 Evaluations Performed in Accordance with 10 CFR 50.54(q) for Changes to Emergency Planning Documents ML24198A0722024-08-21021 August 2024 Correction to Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000313/20240052024-08-21021 August 2024 Updated Inspection Plan for Arkansas Nuclear One – Units 1 and 2 (Report 05000313/2024005, 05000368/2024005) IR 05000416/20240052024-08-21021 August 2024 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 IR 05000313/20240022024-08-0606 August 2024 Integrated Inspection Report 05000313/2024002 and 05000368/2024002 IR 05000416/20240022024-07-29029 July 2024 Integrated Inspection Report 05000416/2024002 ML24176A1202024-07-29029 July 2024 Issuance of Amendment 234 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML24172A2502024-07-29029 July 2024 – Issuance of Amendment No. 233 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24204A2432024-07-23023 July 2024 Notification of Cyber Security Baseline Inspection and Request for Information (05000416/2024403) ML24191A2432024-07-0909 July 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operations IR 05000416/20240102024-06-27027 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000416/2024010 ML24101A1792024-06-25025 June 2024 Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24156A1762024-06-24024 June 2024 Regulatory Audit Summary in Support of License Amendment Requests to Adopt TSTF-505, Revision 2 and 10 CFR 50.69 (Epids L-2023-LLA-0081 and L-2023-LLA-0080) ML24165A1512024-06-13013 June 2024 Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk-Informe ML24163A2652024-06-11011 June 2024 Inservice Inspection Summary Report ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24149A1592024-05-28028 May 2024 Automatic Actuation of Reactor Protection System ML24143A0632024-05-22022 May 2024 Notification of Inspection (NRC Inspection Report 05000368/2024003) and Request for Information ML24130A0912024-05-0909 May 2024 Request for Information Letter License Renewal Phase 2 Inspection ML24128A1512024-05-0909 May 2024 Project Manager Assignment IR 05000313/20240012024-05-0808 May 2024 Integrated Inspection Report 05000313/2024001 and 05000368/2024001 ML24128A2472024-05-0808 May 2024 Project Manager Assignment ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000416/20240012024-05-0202 May 2024 Integrated Inspection Report 05000416 2024001 ML24122C6112024-05-0101 May 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. ML24116A0372024-04-25025 April 2024 Report of Technical Specification Bases Changes ML24113A0972024-04-22022 April 2024 Annual Report of Individual Monitoring - NRC Form 5 for 2023 Per 1 0 CFR 20.2206 ML24113A0952024-04-22022 April 2024 Annual Radioactive Effluent Release Report for 2023 ML24017A2982024-04-18018 April 2024 Summary of Regulatory Audit Regarding the License Amendment Request to Revise Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML24107A0282024-04-17017 April 2024 Notification of Comprehensive Engineering Team Inspection (05000313/2024011 and 05000368/2024011) and Request for Information IR 05000313/20243012024-04-16016 April 2024 NRC Examination Report 05000313/2024301 ML24107B0402024-04-16016 April 2024 Notification by Entergy Operations, Inc., of Proposed Economic Performance Incentive and Reliance on Post-Event Improvements in Plant Procedures And/Or Methods of Operation in FERC ML24107A8872024-04-16016 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24086A5412024-04-10010 April 2024 Authorization of Request for Alternative ANO1-ISI-037 Regarding Extension of Reactor Vessel Inservice Inspection Interval ML24100A0692024-04-0909 April 2024 Report of Changes or Errors to 10 CFR 50.46 Analysis 2024-09-09
[Table view] |
Text
Entergy Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Tel 601-368-5573 Mandy K. Halter Director, Nuclear Licensing CNRO 2019-00004 February 4, 2019 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Indemnity Agreements for Arkansas Nuclear One Units 1 and 2, and Grand Gulf Nuclear Station, Unit 1 Arkansas Nuclear One, Units 1 and 2 & ISFSI NRC Docket Nos. 50-313 and 50-368 & 72-013 Renewed Facility Operating License Nos. DPR-51 & NPF-6 Grand Gulf Nuclear Station & ISFSI NRC Docket Nos. 50-416 & 72-050 Renewed Facility Operating License Nos. NPF-29
References:
- 1. U. S. Nuclear Regulatory Commission (NRC) letter to Entergy Services, Inc.,"Arkansas Nuclear One, Units 1 and 2; Grand Gulf Nuclear Station, Unit 1; Waterford Steam Electric Station, Unit - Orders Approving Direct and Indirect Transfers of Facility Operating Licenses," dated August 1, 2018 (ADAMS Accession No. ML18177A236)
- 2. U. S. Nuclear Regulatory Commission (NRC) letter to Entergy Services, Inc., "Arkansas Nuclear One, Units 1 and 2, and Grand Gulf Nuclear Station, Unit 1 - Issuance of Conforming Amendments RE: Transfers of Renewed Facility Operating Licenses," dated November 30, 2018 (ADAMS Accession No. ML18306A513)
In the letter dated November 30, 2018 (Reference 2), the U. S. Nuclear Regulatory Commission (NRC) issued to Entergy Operations, Inc. (Entergy) the conforming amendments for Arkansas Nuclear One, Units 1 and 2, (ANO) and Grand Gulf Nuclear Station, Unit 1 (GGN) that reflected the orders issued in the August 30, 2018 NRC letter (Reference 1) relating to license transfers for those facilities. Enclosures 4 and 5 of reference 2 contained indemnity agreement amendments for ANO and GGN required in connection with the transfer of the licenses which required Entergy signatures.
CNRO 2019-00004 Page 2 of 3 to this letter contains the signed Indemnity Agreement B-65 for ANO to document acceptance of Amendment No.13. Enclosure 2 to this letter contains the signed Indemnity Agreement B-72 for GGN to document acceptance of Amendment No.7.
This letter contains no new regulatory commitments.
Should you have any questions or require additional information, please contact Stephenie Pyle, Senior Manager Regulatory Assurance at 601-368-5516.
Respectfully, Mandy K. Halter MKH/chm : Arkansas Nuclear One, Units 1 and 2 - Indemnity Agreement No. B-65, Amendment No. 13 : Grand Gulf Nuclear Station, Unit 1 - Indemnity Agreement No. B-72, Amendment No. 7
CNRO 2019-00004 Page 3 of 3 cc: NRC Region IV Regional Administrator NRC Senior Resident Inspector - ANO NRC Senior Resident Inspector - GGN Designated State Official - ANO Designated State Official - GGN NRC Project Manager - ANO NRC Project Manager - GGN
Enclosure 1 CNRO 2019-00004 Arkansas Nuclear One, Units 1 and 2 -
Indemnity Agreement No. B-65, Amendment No. 13
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Docket No. 50-313 50-368 72-013 AMENDMENT TO INDEMNITY AGREEMENT NO. B-65 AMENDMENT NO. 13 Effective Nazerober 3 a , 2 a1 s Indemnity Agreement No. B-65, between Entergy Arkansas, Inc., and Entergy Operations, Inc., and the United States Nuclear Regulatory Commission, dated November 8, 1972, as amended, is hereby further amended as follows:
The name "Entergy Arkansas Inc." is deleted wherever it appears in the agreement and substituted in lieu thereof by the name: "Entergy Arkansas, LLC."
Item 1 of the Attachment to the indemnity agreement is modified by deleting the name "Entergy Arkansas, Inc." wherever it appears in the agreement and substituted in lieu thereof by the name:
Item 1 - Licensee Entergy Arkansas, LLC Address 425 West Capitol Avenue Little Rock, Arkansas 72201 In light of the above, Indemnity Agreement No. B-65 is between "Entergy Arkansas, LLC,"
"Entergy Operations, Inc.," and the United States Nuclear Regulatory Commission.
FOR THE UNITED STATES NUCLEAR REGULATORY COMMISSION Anthony Bowers, Chief Financial Projects Branch Division of Licensing Projects Office of Nuclear Reactor Regulation Y .Sr Accepted J ,9/1/ 11 - 20..l.!i.
By____.~/Yl.,(J:..:;w~....,._..sa.;.cu-=.i.~~~--- By~~-
Ente y Arkansas, LLC Entergy Operations, Inc.
Enclosure 2 CNRO 2019-00004 Grand Gulf Nuclear Station, Unit 1 -
Indemnity Agreement No. B-72, Amendment No. 7
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O.C. 20555-0001 Docket No. 50-416 72-050 AMENDMENT TO INDEMNITY AGREEMENT NO. B-72 AMENDMENT NO. 7 Effective Novem:ter 30, 2018 , Indemnity Agreement No. B-72, between Entergy Operations, Inc., System Energy Resources, Inc., Cooperative Energy, a Mississippi electric cooperative, and Entergy Mississippi, Inc., and the United States Nuclear Regulatory Commission, dated July 15, 1981, as amended, is hereby further amended as follows:
The name "Entergy Mississippi, Inc." is deleted wherever it appears in the agreement and substituted in lieu thereof by the name: "Entergy Mississippi, LLC" In light of the above, Indemnity Agreement No. B-72 is between "Entergy Operations, Inc.,"
"System Energy Resources, Inc.," "Cooperative Energy, a Mississippi electric cooperative,"
"Entergy Mississippi, LLC, " and the United States Nuclear Regulatory Commission.
FOR THE UNITED STATES NUCLEAR REGULATORY COMMISSION Anthony Bowers, Chief Financial Projects Branch Division of Licensing Projects Office of Nuclear Reactor Regulation
~
Accepted ..J hit/ JI-ff:"_
~ o Accepted J,9-11/ JI ~ 20 I~
By ~~ ~
Entergy Operations, Inc.
. By~~c:fi2- -
System Energy Resources, Inc.
J/f!V JI~
/
By~~---t'------'.......:;,,,....'"""'-".--~~~~~