Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20049K028 + (Forwards marked-up Tech Specs Re Containment Structural Integrity,Per NRC 820308 Request.Also Forwards marked-up Pages of FSAR Tech Specs)
- ML20205L236 + (Forwards marked-up Tech Specs Re Enrichment Limits for Storage in New & Spent Fuel Storage Racks,Per SA Mcneil 880930 Request)
- ML20210A684 + (Forwards marked-up Tech Specs Re Fire Detection Instruments & Fire Hose Stations.Changes Reflect as-built Conditions & Corrected Typos)
- ML20234D203 + (Forwards marked-up Tech Specs Re Inadequate Core Cooling Instrumentation & NSHC Analysis,Per 870609 Meeting.Tech Specs Supercede Submittal in Entirety.Requests 60 Days from Date of Issuance to Implement Revised Specs)
- W3P86-0155, Forwards marked-up Tech Specs Re Revised Surveillance Requirement 4.8.1.1.2.d.1 Allowing Performance of Diesel Generator Insps at Refueling outages.Eighteen-month Cycle 2 Will Be Implemented + (Forwards marked-up Tech Specs Re Revised Surveillance Requirement 4.8.1.1.2.d.1 Allowing Performance of Diesel Generator Insps at Refueling outages.Eighteen-month Cycle 2 Will Be Implemented)
- ML18037A098 + (Forwards marked-up Tech Specs Representing Util Policy Decision to Utilize 24-month (from Startup to Startup) Refueling Outages)
- SNRC-1088, Forwards marked-up Tech Specs Requiring Rev to Reflect Organizational Changes + (Forwards marked-up Tech Specs Requiring Rev to Reflect Organizational Changes)
- ML20127B373 + (Forwards marked-up Tech Specs W/Correction to Conform W/Sts & Fsar.Tech Specs for Overspeed Protection Sys Surveillance Acceptable,Except as Noted)
- ML17277B119 + (Forwards marked-up Tech Specs Which Include Limiting Conditions for Operation,W/Appropriate Action Statements & Surveillance Requirements,Which Are Affected by Single Loop Operation Analyses)
- ML17277B120 + (Forwards marked-up Tech Specs Which Include Limiting Conditions for Operation,W/Appropriate Action Statements & Surveillance Requirements,Which Are Affected by Single Loop Operation Analyses)
- ML20212G705 + (Forwards marked-up Tech Specs as Proposed Revs for Full Power Ol,Including Corrections of Typos & Inconsistencies Between Index & Text,Deletions/Clarifications of Footnotes & Changes to Wording)
- ML17324A919 + (Forwards marked-up Tech Specs for Steam Generators Operable in Modes 1,2,3 & 4,clarifying Intent to Address Steam Generator Integrity,Not Operability.Licensee Proposal Re Incorporation of Appropriate Tech Spec Mod Requested)
- ML18026A961 + (Forwards marked-up Tech Specs from 840430 Amends 98,92 & 65 to Licenses DPR-33,DPR-52 & DPR-68,respectively,re Inservice Insp Requirements,Correcting Errors)
- ML20053A366 + (Forwards marked-up Tech Specs to Close Out Open Items Identified in NRC)
- ML18018B728 + (Forwards marked-up Tech Specs,Based on Rev 4 to NUREG-0452, STS for Westinghouse Pressurized Reactors. Offsite Dose Calculation Manual Will Be Submitted by 840831.Future Submittals Will Address Listed Subjs)
- ML19332D129 + (Forwards marked-up Tech Specs,Based on Util 890825 Amend Request)
- ML20126D198 + (Forwards marked-up Tech Specs,Clarifying Containment Integrated Leakage Rate Test Program.Util 850523 Description of Program Acceptable.Amend to Fsar,Reflecting Clarification,Requested)
- ML20137J195 + (Forwards marked-up Tech Specs,Clarifying That 851217 Application for Amend to License Applicable for Cycle 8 Only)
- ML20202J491 + (Forwards marked-up Tech Specs,Including Assessment of Vogtle-specific Items.Draft Acceptable Per Justifications & FSAR & Ser.Justifications for Unacceptable Items Requested for Future Discussions W/Nrc.W/O Encl)
- ML20154R775 + (Forwards marked-up Tech Specs,Incorporating Comments Per 850419 Request)
- ML20090J314 + (Forwards marked-up Tech Specs,Indicating Addl Comments & Suggestions Re Reactor Trip Sys & ESF Instrumentation)
- ML17341A701 + (Forwards marked-up Tech Specs,Revising Limited Conditions for Operation for Emergency Containment Filtering, post-accident Containment & Control Room Ventilation Sys,Per 811116 & 18 Telcons.Revision to 770609 Submittal Requested)
- ML20099D317 + (Forwards marked-up Testimony of Jj Lipinsky & Jj Norris Re Protective Coatings Program.Related Correspondence)
- ML20004C662 + (Forwards marked-up Transcript Pages 18,957 & 18,958, Confirming 810415 Telcon Re Ucs Opportunity to Reply to Responses Filed by Other Parties to Ucs Motion for ASLB Order on Block Valve Test Results)
- ML20237K388 + (Forwards marked-up Transcript Pages for Editing by Sept 19)
- ML20237L496 + (Forwards marked-up Transcript W/Addendum)
- ML19211C239 + (Forwards marked-up Transcript of 790919 Briefing in Washington,Dc on Nuclear Fuel Svc,Erwin,Tn Facility)
- ML19211C216 + (Forwards marked-up Transcript of 790920 Briefing in Washington,Dc on Nuclear Fuel Svc,Erwin,Tn Facility)
- ML19211C187 + (Forwards marked-up Transcript of 790927 Discussion in Washington,Dc on Nuclear Fuel Svc Erwin,Tn,Facility)
- ML20002D946 + (Forwards marked-up Transcript of 801209-10 Snupps Review Meeting on FSAR Chapter 8.Transcript Available in Central Files Only)
- ML20205Q393 + (Forwards marked-up Transcript of 860416 Interview,Per NRC 860506 Request)
- ML16342B336 + (Forwards marked-up Transcript of 870506 Meeting in Bethesda, MD Re Seismic Analysis of Proposed high-density Spent Fuel Racks,Noting Corrections)
- ML20236F223 + (Forwards marked-up Transcript of 870715 Meeting Indicating Util Corrections)
- ML20111A527 + (Forwards marked-up Ts,Revising Proposed Extended DG AOT to 14 Days from Discovery of Failure to Meet Lco,Provided Standby Auxiliary Transformer Available,In Response to NRC RAI)
- ML20065B360 + (Forwards marked-up Tss,Reflecting Administrative Controls Changes to License Change Request LCR 93-11,establishing May 1 Submittal Deadline for Radioactive Effluent Release Rept)
- ML17300A648 + (Forwards marked-up Unit 2 Tech Spec Pages,Used to Prepare Draft Tech Specs for Unit 3.Advises That Present Unit 3 Schedule for Fuel Loading Necessitates Approval of Tech Specs by 870301)
- ST-HL-AE-3881, Forwards marked-up Updated FSAR Page Addressing Change Made to Switchyard Design in Late 1989.Encl Pages Will Be Incorporated Into 1991 Updated FSAR Rev & 1991 10CFR50.59 Annual Summary + (Forwards marked-up Updated FSAR Page Addressing Change Made to Switchyard Design in Late 1989.Encl Pages Will Be Incorporated Into 1991 Updated FSAR Rev & 1991 10CFR50.59 Annual Summary)
- ML18101B317 + (Forwards marked-up Updated FSAR Pages Addressing Questions Re Spent Fuel Pool Cooling Sys,Per 960328 Discussion W/Nrc)
- ML20236G688 + (Forwards marked-up Updated Listing of Safety Issues Mgt Sys. Points Relevant to Approach in Updating Listing Listed)
- ML19341C587 + (Forwards marked-up Updated Text of Cycle 5 Reload Rept, Reflecting Changes Resulting from Reshuffle of Fuel Assemblies to Minimize Use of Failed Fuel)
- ML20004C752 + (Forwards marked-up Version of Amend 57 to Psar.Mods Were Made as Result of NRC 810511-27 Review Meeting.Amend Is Available in Central Files Only)
- ML20246L361 + (Forwards marked-up Version of Final Draft Tech Spec Table 3.3-1 Re Overtemp N-16 & Overpower N-16,as Result of Westinghouse Comments.Changes Result in Reducing from 4 H to 2 H Time Allowed to Operate Unit W/Inoperable Channel)
- ML17352A656 + (Forwards marked-up Version of Topical QA Rept, Fpltqar 1-76A & Rev 38 to Topical QA Rept.)
- L-94-138, Forwards marked-up Version of Topical QA Rept, Fpltqar 1-76A & Rev 38 to Topical QA Rept + (Forwards marked-up Version of Topical QA Rept, Fpltqar 1-76A & Rev 38 to Topical QA Rept)
- ML20032B171 + (Forwards marked-up Wj Dircks Memo to Commission Re Operator Licensing Exams for Retyping)
- ML20090J263 + (Forwards marked-up Wolf Creek & Snupps FSAR Sections Proposing Changes to Initial Test Program.Info Will Be Formally Incorporated in Next Rev to SAR)
- ML20198K973 + (Forwards marked-up plant-specific List of 129 multi-plant Actions.Date Changes Will Be Handled Per Integrated Plan. Items Involving Loss of 125-volt Dc & non-Class 1E Power Resolved)
- ML20045G615 + (Forwards marked-up,draft Proposed Rule on Acquisition Regulation,Per Review,Presenting Corrections)
- ML20134G066 + (Forwards marked-up,incomplete CP&L Response to C Van Vo Affidavit Alleging Discrimination & Possible Hanger Deficiencies (Case RII-84-A-0143) for Use in Review of Allegations)
- ML18022A487 + (Forwards marked-up,proposed Tech Spec Changes for Full Power Licensing & Tech Spec Equipment List Program (Tselp). Following Implementation of Tselp,Quarterly Repts on Changes Evaluated Per 10CFR50.59 Will Be Submitted for 2 Yrs)
- ML20057F818 + (Forwards method,KMTC-208-22,describing Kerr-McGee Analyzing Vitro Solubility & Dissolution Rate Classification of air-borne Particulates in Simulated Lung Fluid)