ML20202J491

From kanterella
Jump to navigation Jump to search
Forwards marked-up Tech Specs,Including Assessment of Vogtle-specific Items.Draft Acceptable Per Justifications & FSAR & Ser.Justifications for Unacceptable Items Requested for Future Discussions W/Nrc.W/O Encl
ML20202J491
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 04/09/1986
From: Mark Miller
Office of Nuclear Reactor Regulation
To: Conway R
GEORGIA POWER CO.
References
NUDOCS 8604160076
Download: ML20202J491 (2)


Text

- - -

J Docket No.: 50-424 4-9-E Mr. Richard Conway Vice President and Project General Manager Georgia Power Company Rt. 2, Box 299A Waynesboro, Georgia 30830

Dear Mr. Conway:

Subject:

Transmittal of NRC First Draft of Vogtle Technical Specifications The staff and its consultants have reviewed your initial Technical Specification submittal for Vogtle Unit I dated February 28, 1986.

This review included a de-tailed assessment of plant-specific differences from the Westinghouse Standard Technical Specifications. We have enclosed the Standard Technical Specifications marked to include Vogtle-specific items which the staff has reviewed and found acceptable based on your justifications and the Vogtle FSAR and SER. This marked up copy is being provided for the ease of your review.

The staff will provide a typed version of this first draft and forward a copy to you when available.

Your staff should review this document and prepare further justifications for those items not accepted by the NRC in anticipation of future discussions with the NRC staff. We will contact your staff regarding necessary meetings.

Ifthereareanyquestions,contactmeat(301)492-7357.

Sincerely, ISI Melanie A. Miller, Project Manager PWR Project Directorate #4 Division of PWR Licensing-A

Enclosure:

As stated cc: See next page Distribution:

w/o enclosures

- Doctet r11e

.._ MDuncan

" NRC'PDR^ ~~" " MMiller Local POR OELD PRC System BJYoungblood Rdg NSIC ACRS (10)

PWR#4 Rdg JPartlow BGrimes EJordan 4

RWR [ph-A MDde/QfR-A PWRf4 PW 4/DPWR-A F00 MMir er/mac n

BJYoungblood SBrown 04/{/86 04/j/86 04/g/86 04/ $ /86 F0B F08

[

BClayton VBenaroya e604160076 860409 04/ $ /86 04/}/86 PDR ADOCK 0500 4

.c Mr. R. E. Conway Georgia Power Company Vogtle Electric Generating Plant CC:

Mr. L. T. Gucwa Resident Inspector Chief Nuclear Engineer Nuclear Regulatory Comission Georgia Power Company P. O. Box 572 P.O. Box 4545 Waynesboro, Georgia -30830 Atlanta, Georgia 30302 Mr. Ruble A. Thomas Deppish Kirkland, III, Counsel Vice President - Licensing Office of the Consumers' Utility Vogtle Project Council Georgia Power Company /

Suite 225 Southern Company Services. Inc.

32 Peachtree Street, N.W.

P.O. Box 2625 Atlanta, Georgia 30303 Birmingham, Alabama 35202 James E. Joiner Mr. Donald O. Foster Troutman, Sanders, Lockennan.

Vice President & Project General Manager

& Ashmore Georgia Power Company Candler Building Post Office Box 299A, Route 2 127 Peachtree Street, N.E.

Waynesboro, Georgia 30830 Atlanta, Georgia 30303 Douglas C. Teper Mr. J. A. Bailey Georgians Against Nuclear Energy Project Licensing Manager 1253 Lenox Circle Southern Company Services, Inc.

Atlanta, Georgia 30306 P.O. Box 2625 Birmingham, Alabama 35202 Billie Pirner Garde Citizens Clinic Director Ernest L. Blake, Jr.

Government Accountability Project Bruce W. Churchill, Esq.

303 10th Street Shaw, Pittman, Potts and Trowbridge Augusta, Georgia 30901 1800 M Street, N.W.

Washington, D. C.

20036 Mr. G. Bockhold, Jr.

Vogtle Plant Manager Georgia Power Company Route 2, Box 299-A Waynesboro, Georgia 30830 Regional Administrator, Region II U.S. Nuclear Regulatory Comission 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323

.