Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19323H669 + (Forwards Startup Rept 15, Initial Approach to Power Tests (B-Series), for 800223-0522)
- ML20245J789 + (Forwards Startup Rept 52 for 890506-0803,per Tech Spec Section 7.5.1a)
- ML20062D613 + (Forwards Startup Rept 8 for Subj Facil Covering the Period 780522 to 780822)
- ML20055B981 + (Forwards Startup Rept Initial Approach to Power Tests (B-Series),Interim Rept 23 for Period Ending 820522)
- ML20210T493 + (Forwards Startup Rept Per Requirements of Tech Spec 6.9.1. Spec Requires Submittal of Startup Rept within 90 Days Following Completion of Startup Test Program.Startup Test Program Completed on 770215)
- ML20236R219 + (Forwards Startup Rept Quarterly Update,Catawba Unit 2, Cycle 1, Per Tech Spec Section 6.9.1.3.Certain Tests Noted in Not Complete)
- ML20235L062 + (Forwards Startup Rept Quarterly Update,Catawba Unit 2 Cycle 1, Per Tech Spec 6.9.1.3.As Indicated in Util , One Test Not Complete)
- ML20154A059 + (Forwards Startup Rept Suppl 1, Per Reg Guide 1.16.Startup Test Program Not Completed Due to Deferred Testing. Supplemental Rept Will Be Issued within 90 Days to Update Progress of Startup Test Program)
- ML20116L618 + (Forwards Startup Rept for Cycle 18.Submittal Contains No New Commitments Nor Modifies Any Existing Commitments)
- ML19340A130 + (Forwards Startup Rept for Cycle 3)
- ML19261B356 + (Forwards Startup Rept for Facility)
- ML19261B357 + (Forwards Startup Rept for Facility)
- ML19312C116 + (Forwards Startup Rept for Period Through Noon on 731004. W/O Encl)
- ML20126H418 + (Forwards Startup Rept for Unit 1,Cycle 1, Per Tech Specs 6.9.1 Covering Events Through 810228)
- ML20081H377 + (Forwards Startup Rept for Unit 2,cycle 1,which Covers Events Between 810625 & 820604,IAW TS Section 6.9.1. Submittal Date Extended Until 820809,per 820806 Telcon)
- ML20129E682 + (Forwards Startup Rept for VCSNS Power Uprate)
- ML20129E687 + (Forwards Startup Rept for VCSNS Power Uprate)
- ML20069K049 + (Forwards Startup Rept for Wolf Creek Generating Station Power Rerate & T Hot Increase. Rept on Implementation of Power Rerate Parameter Change Request Submitted on 940207)
- ML20067C008 + (Forwards Startup Rept for Wolf Creek Generating Station Power Rerate & T Hot Reduction. Rept for Implementing Power Rerate Request Submitted by Util & Subsequently Approved by NRC as Amend 69 to TS & OL)
- ML19343B111 + (Forwards Startup Rept, Core 12 Physics Test)
- ML20033A530 + (Forwards Startup Rept, Initial Approach to Power Tests (B-Series), Interim Rept 20, for Period 810523-0822,per Requirements of Tech Spec Section 7.5.1a.Distribution List Encl)
- ML20214C379 + (Forwards Startup Rept, Per Tech Spec 6.9.1.1.Quarterly Updates Will Be Submitted as Required by Tech Spec 6.9.1.3)
- ML17264A601 + (Forwards Startup Rept,Describing Thermal/Hydraulic & Nuclear Testing During Cycle 26 Plant Startup & Power Escalation After Installation of Replacement SGs)
- ML19344D255 + (Forwards Startup Rept,Suppl 2 for Period Ending 800129. Suppls Will Continue Until Completion of Startup Test Program & Commencement of Commercial Power Operation)
- ML19344D256 + (Forwards Startup Rept,Suppl 2 for Period Ending 800129. Suppls Will Continue Until Completion of Startup Test Program & Commencement of Commercial Power Operation)
- ML19208A934 + (Forwards Startup Rept.)
- ML20043C597 + (Forwards Startup Review Board Self-Assessment Rept:Apr 1990 Unit 1 Startup. Based on Assessment,Mgt Efforts Taken Through Performance Improvement Plan Appears Substantially on Track)
- ML17299B048 + (Forwards Startup Summary Rept Requested in)
- ML17299B049 + (Forwards Startup Summary Rept Requested in 860108 Ltr)
- ML20024B099 + (Forwards Startup Test Rept 2,consisting of Test Procedures Re Water Level Measurement,Average Power Range Monitor Calibr,Piping & Recirculation Sys)
- ML20024B100 + (Forwards Startup Test Rept 2,consisting of Test Procedures Re Water Level Measurement,Average Power Range Monitor Calibr,Piping & Recirculation Sys)
- B10519, Forwards Startup Test Rept Cycle 5 + (Forwards Startup Test Rept Cycle 5)
- B11096, Forwards Startup Test Rept Cycle 6. Results within Acceptance Criteria W/Exception of Low Power Measurement of Control Element Assembly (CEA) Reactivity Worths.One CEA Bank Slightly in Excess of Criteria + (Forwards Startup Test Rept Cycle 6. Results within Acceptance Criteria W/Exception of Low Power Measurement of Control Element Assembly (CEA) Reactivity Worths.One CEA Bank Slightly in Excess of Criteria)
- ML20148N383 + (Forwards Startup Test Rept Prior to Oper of Cycle 4.W/encl Cycle 4 Calculational Model Changes & CEA Drop Test Results & Analysis)
- ML20100K774 + (Forwards Startup Test Rept Re Test Condition Open Vessel, Heatups 1-6 & Warranty Run)
- FVY-84-132, Forwards Startup Test Rept Vermont Yankee Cycle 11, Per Tech Spec Section 6.7.A.1 Requirements + (Forwards Startup Test Rept Vermont Yankee Cycle 11, Per Tech Spec Section 6.7.A.1 Requirements)
- ML20101L092 + (Forwards Startup Test Rept Vermont Yankee Cycle 16)
- ML17331A129 + (Forwards Startup Test Rept for Cycle 3.Rept Available in Central Files)
- ML19210E072 + (Forwards Startup Test Rept for Cycle 4)
- PM-79-104, Forwards Startup Test Rept for Cycle 4 + (Forwards Startup Test Rept for Cycle 4)
- ML20032C655 + (Forwards Startup Test Rept for Facility)
- ML20197A472 + (Forwards Startup Test Rept for Subj Facil Lic DPR-74 on 780919)
- ML20037A420 + (Forwards Startup Test Rept for Unit 2.W/o Encl)
- ML18086A355 + (Forwards Startup Test Rept, Per Tech Spec 6.9.1.1 Requirements)
- ML18086A356 + (Forwards Startup Test Rept, Per Tech Spec 6.9.1.1 Requirements)
- ML19257C638 + (Forwards Startup Test Rept,Cycle 7)
- ML19257C639 + (Forwards Startup Test Rept,Cycle 7)
- ML20133N058 + (Forwards Startup Test Rept,Cycle 7. Criticality Achieved on 850630 & 100% Power Reached on 850711 Following end-of-Cycle 6 Refueling Outage)
- B11732, Forwards Startup Test Rept,Cycle 7. Criticality Achieved on 850630 & 100% Power Reached on 850711 Following end-of-Cycle 6 Refueling Outage + (Forwards Startup Test Rept,Cycle 7. Criticality Achieved on 850630 & 100% Power Reached on 850711 Following end-of-Cycle 6 Refueling Outage)
- ML20149M741 + (Forwards Startup Test Rept,Vermont Yankee Cycle 19)
- PY-CEI-NRR-0764, Forwards Startup Test Results Final Summary Rept, for Period from 860320-871118 Per Reg Guide 1.16 & Plant Tech Spec Section 6.9 + (Forwards Startup Test Results Final Summary Rept, for Period from 860320-871118 Per Reg Guide 1.16 & Plant Tech Spec Section 6.9)