ML20197A472
| ML20197A472 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 10/02/1978 |
| From: | Dolan T AMERICAN ELECTRIC POWER CO., INC. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20197A477 | List: |
| References | |
| NUDOCS 7810120062 | |
| Download: ML20197A472 (2) | |
Text
,
j a
AMERICAN ELECTRIC POWER Service Co rp o ra t io n gp 2 Broadway New York. X Y.10004 l212) 422 J 8 00
\\
October 2, 1978 AEP:NRC:00084
/onstacas Sew E:tmee nee Pnndent Eniwer.n; Donald C. Cook Nuclear Plant Unit No. 2 Startup Test Report Docket No. 50'-316 License No. DPR-74 Mr. J. G. Keppler, Regional Director
' Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glerr Ellyn, IL 60137
'D' ear Mr. Kepoler:
In compliance with the requirements set forth in Regulatory Guides T.16 and 10.1 and in sections 6.9.1.1 through 6.9.1.3 of the Technical Specifications, we are sending you two (2) copies of our Startup Test Report for the Donald C. Cook Nuclear Plant Unit 2 dc'ed September 19, 1978.
The turbine and generator trips from 100% power have not been performed.
We have held conversai. ions with members of the NRC S taff and we agree to
' submit an FSAR amendment revising the requirement '.o follow Regulatory Guide 1.68 Revision 0.In such amendment we will reference Sections 5.(1.1) and 5.(n.n) of Revision 1 of the same guide, which allow us to combine the turoine trip frca 100% power test with the 100% load re ection test.
Once v
performed, the results of the latter test will be transmitted to you.
Twenty-five (25) copies of this report are being sent to Mr. John G.
Davis, Acting Director, Office of Inspection and Enforcement.
Two (2) copies are being sent to Mr. W. G. McDcaald, Director, Office of Management and Pro-l gram Analysis. Thirty (30) copies are also being sent to Ms.M.M.Miynczak, Project Manager for the Donald C. Cook Nuclear Plant Unit No.1 and 2, l
l 7D#l2 OM M
[
/
l m
/.
c Mr. J. G. Keppler, Regional Director AEP:llRC:00084 Division of Operating Reactors.
Very truly yours, 5-P'.'
JED:em hn E. Dolan enior Executive Vice President Engineering t
cc: Jchn G. Davis, Acting Director, I.E. (25)
W. G. Mcdonald, Director, M.P.A (2)
~. Charnoff ( jk (30 M. M. M1vncra G
1)
R. C. Callen (1)
R. J. Vollen (1)
P. W. Steketee (1)
R. Walsh (1)
R. W. Jurgensen w/att D. V. Shaller-Bridgman (1)
.