ML20235L062

From kanterella
Jump to navigation Jump to search
Forwards Startup Rept Quarterly Update,Catawba Unit 2 Cycle 1, Per Tech Spec 6.9.1.3.As Indicated in Util , One Test Not Complete
ML20235L062
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 02/20/1989
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8902270358
Download: ML20235L062 (2)


Text

._ _ _ . _

l '

u ..

  • . '** Duke Ibwer Company llu B Tucker l P O Bar33198 Vice President

. . Charlotte, N.C 2E242 Nuclear Production

(~04)373-4531 i

( DUKE POWER February 20, 1989 Document Control Desk Nuclear Regulatory Commission Washington, D.C. 20555 Subj ect: Catawba Nuclear Station, Unit 2 Docket No. 50-414 Ninth Quarterly Update to Startup Report Gentlemen:

In accordance with Section 6.9.1.3 of the Catawba Nuclear Station Technical Specifications, please find attached the ninth quarterly update to the Unit 2 Startup Report. As indicated in my November 11, 1988 letter to NRC, one test is not complete. Additional quarterly updates to the Startup Report will be submitted as required by Technical Specifications. <

Very truly yours, Hal B. Tucker JGT12.D1/lcs Attachment xc: M. L. Ernst, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. W. T. Orders NRC Resident Inspector Catawba Nuclear Station l l 58 890230 hhk2[h[CK05000434

-R PDC ,

-_. . . _ - = _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ . - _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - ___ _

1 A c.:

1 <

4 . - . ,

r,. '

STARTUP~ REPORT-QUARTERLY UPDATE- ~

)

CATAWBA UNIT 2 CYCLE 1 )

February.15, 1989. j

l TESTING COMPLETED DURING QUARTER L .None.- .

STATUS OF TESTING NOT COMPLETE STEADY STATE PIPING SYSTEMS OPERATIONAL VIBRATION MEASUREMENT - TP/2/A/1200/21 k- This test is described in Section'10.5 and'11.5 in the Startup Report. It is complete except for retesting of piping associated with the Diesel Generator Fuel Oil and Lube Oil systems. . Additional restraints were installed during the EOC-1 refueling' outage. However,:further modifications have been found to'be

~

necessary. These modifications involve the replacement of rigid elbows with flexible-elbows. Design' Engineering is currently evaluating' sources of qualified-parts. 'It has been determined by-Design Engineering that a Nuclear Station:

Modification'will'be necessary to perform this. piping replacement. Completion of.

the test is dependent on these modifications.