ML20214C379

From kanterella
Jump to navigation Jump to search
Forwards Startup Rept, Per Tech Spec 6.9.1.1.Quarterly Updates Will Be Submitted as Required by Tech Spec 6.9.1.3
ML20214C379
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 11/17/1986
From: Tucker H
DUKE POWER CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20214C381 List:
References
NUDOCS 8611210082
Download: ML20214C379 (1)


Text

,

l l

DUKE POWER GOMPANY P.O. BOX 33180 CHARLOTTE, N.C. 28242 TELEPHONE IIAL H. TL*CKER (704) 373-450L vueemmeIDeWT win saaemonecrios November 17, 1986 Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Re:

Catawba Nuclear Station, Unit 2 Docket No. 50-414 Startup Feport

Dear Dr. Grace:

In accordance with Section 6.9.1.1 of the Technical Specificatione, attached are two (2) copies of the Startup Report for Catawba Nuclear Station, Unit 2.

As noted in the report, some tests are not yet complete. Quarterly updates to the Startup Report will be submitted as required by Technical Specification 6.9.1.3.

Very truly yours, a A1.

~.

Hal B. Tucker JGT/18/ sib Attachments xc:

(w/36 copies of attachment)

Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C.

20555 (w/1 copy of attachment)

NRC Resident Inspectors gf_

J.I 'if Catawba Nuclear Station i 30 8611210082 861117 ADOCK0500gg PDR P