Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198M205 + (Forwards Rock Evaluation Rept Requested by NRC During 870312,meeting in Denver)
- ML20203A092 + (Forwards Rocketdyne Div Environ Monitoring & Facility Effluent Annual Rept,De Soto & Santa Susana Field Lab Sites, 1985. Summary of Average Environ Radioactivity Levels for Reporting Period & Effluent Summary Included)
- ML20209A872 + (Forwards Rocketdyne Rept, Effect of Tubing on Dynamic Pressure Recording, ANSI B88.1-1972, Guide for Dynamic Calibr of of Pressure Transducers & Application Technologies Info on Shockless Step Pressure Generator)
- ML20084N033 + (Forwards Rockford League of Women Voters Proposed Findings of Fact & Conclusions of Law Re Contention 106 on Seismology,Per 820818 Stipulation)
- ML20055B428 + (Forwards Rockford League of Women Voters Contentions 19 & 108 & Related 820706 Interrogatory Response,Per Discussion. W/O Encl)
- ML20085A174 + (Forwards Rockland County Legislature Resolution 391 Authorizing County Atty to Take Legal Action If NRC Does Not Shut Down Plants on 830609)
- ML20085A169 + (Forwards Rockland County Legislature Resolution 390 Requesting State of Ny Legislature to Pass Legislation Regulating Nuclear Power Industry,Based on Economic Consequences of Radiological Accidents & Nuclear Waste)
- ML20199E733 + (Forwards Rockland County Legislature Resolution Requesting Governor of State of Ny to Shut Down Plants Due to Problems W/Evacuation Plan & Dangers Underscored by Chernobyl Catastrophe)
- ML20085A148 + (Forwards Rockland County Legislature Resolution 389 Requesting Plants Cease Operation Until County Radiological Plan Approved)
- ML20070H315 + (Forwards Rockland County Resolution 796 Calling for Closing of Plants for Failure to Remedy Emergency Planning Deficiencies)
- ML20070D111 + (Forwards Rockland County Resolution Calling for Closing of Plants for Failure to Remedy Emergency Planning Deficiencies by Expiration of 120-day Clock)
- ML20054N119 + (Forwards Rockland County Revised List of Proposed Order of Witnesses & Jt Grant Testimony)
- ML19331D000 + (Forwards Rockwell Hanford Operations Rept Insp & Evaluation of Nuclear Fuel Svcs High Level Waste Storage Sys, Providing Overview of Work to Be Performed Re Contract.Refs Savannah River Plant 780602 Review & Recommendations)
- ML20136H511 + (Forwards Rockwell Intl Defueling Procedure to Be Included in Licensee Operations Manual as Section 4.6)
- ML20136H515 + (Forwards Rockwell Intl Defueling Procedure to Be Included in Licensee Operations Manual as Section 4.6)
- ML19345G957 + (Forwards Rockwell Intl Rept, Insp & Evaluation of Nuclear Fuel Svcs High Level Waste Storage Sys, in Response to 801203 Request.W/O Encl)
- ML20151Q122 + (Forwards Rocky Mountain Pumped Storage Hydroelectric Project, Protected Species Survey for Rocky Mountain-Plant Bowen 230 Kv Transmission Line & Final Suppl to Fes,Rocky Mountain Project 2725)
- ML20082M407 + (Forwards Rocky Point Board of Educ Resolution Re Emergency Planning,Passed at 831031 Meeting)
- ML20140C748 + (Forwards Rod Drop Time Data for Remaining Rccas & Results of in-pool Drag Tests,In Response to NRC Bulletin 96-01. Plant Voluntarily Performed Control Rod Drop Testing on 970217 & Rod Drag Testing on 970306 for Unit 1)
- ML20203H501 + (Forwards Rod Drop Times & Associated Assembly Burnup Data for Tested Rodded Assemblies for 971004 Re NRC Bulletin 96-01, CR Insertion Problems)
- ML20096F679 + (Forwards Rod Swap Methodology)
- ML20207L214 + (Forwards Rod Swap Methodology Review Criterion Failure Rept for Cycle 5 Startup Physics Test on 880727.Rept Summarizes Evaluation Performed to Explain over-prediction of Ref Bank Worth for Cycle 5)
- ML19331A658 + (Forwards Roe 71-4 & BMI-X-10208 in Response to 711014 Request.Cites NTIS as Possible Supplier of Remaining Requested Documents)
- ML19339C757 + (Forwards Rogovin Rept & NRC 1979 Annual Rept Re Accident & NRC Responses to Recommendations Made by Presidents Commission on Accident at Tmi,In Response to 800506 Request for Info.W/O Encl)
- ML19309C956 + (Forwards Rogovin Rept in Response to FOIA Request.W/O Encl. Second Vol of Rept Will Be Published in Apr)
- ML19309F281 + (Forwards Rogovin Rept.W/O Encl)
- ML20209G194 + (Forwards Role of Regional Definitive Care Ctrs in Preparing for & Treating Casualties of Radiation Emergency Proposal)
- RBG-31277, Forwards Roof Drawings for Standby Cooling Tower (Sbct) & Diesel Generator (DG) Bldgs & Calculations for DG & Sbct Bldgs,Per 890425 Request.Drawings Provide Overview of Each Bldg.W/Three Oversize Drawings + (Forwards Roof Drawings for Standby Cooling Tower (Sbct) & Diesel Generator (DG) Bldgs & Calculations for DG & Sbct Bldgs,Per 890425 Request.Drawings Provide Overview of Each Bldg.W/Three Oversize Drawings)
- B16403, Forwards Root Cause Analysis & Residual Strength Assessment, Porous Concrete Matls Properties Evaluation & Containment Structure Seismic Assessment in Response to Rai, + (Forwards Root Cause Analysis & Residual Strength Assessment, Porous Concrete Matls Properties Evaluation & Containment Structure Seismic Assessment in Response to Rai,)
- ML20138E631 + (Forwards Root Cause Analysis & Residual Strength Assessment, Porous Concrete Matls Properties Evaluation & Containment Structure Seismic Assessment in Response to Rai,Dtd 970411)
- ML20206N189 + (Forwards Root Cause Analysis Rept, Re 980625 Incident Numbered TN-98-81.Technical Rept TR-31777, Hydrogen Gas Formation from Aquamag Contact with Aluminum Metal, Encl)
- ML17286B017 + (Forwards Root Cause Analysis Summary, Unsatisfactory Licensed Operator Requalification Program, Resulting from Failure of Two Crews & Three Operators During Requalification Simulator Exam Retakes on 910605 & 06)
- GO2-91-156, Forwards Root Cause Analysis Summary, Unsatisfactory Licensed Operator Requalification Program, Resulting from Failure of Two Crews & Three Operators During Requalification Simulator Exam Retakes on 910605 & 06 + (Forwards Root Cause Analysis Summary, Unsatisfactory Licensed Operator Requalification Program, Resulting from Failure of Two Crews & Three Operators During Requalification Simulator Exam Retakes on 910605 & 06)
- ML20059N398 + (Forwards Root Cause Analysis of Operating Problems to Be Presented at Regulatory Info Conference on 890418-20)
- ML20085G152 + (Forwards Root Cause Corrective Action Summary,In Response to Insp Rept 50-271/91-02.Licensed Operator Requalification Program Rewritten & Training Dept Presented Training on Requirements of Examiner Std (NUREG-1021))
- ML20138G046 + (Forwards Root Cause Determination Evaluation Rept Braidwood Unit 1 Locked Tube Tts Circumferential Indication Root Cause Determination Evaluation)
- ML20138G051 + (Forwards Root Cause Determination Evaluation Rept Braidwood Unit 1 Locked Tube Tts Circumferential Indication Root Cause Determination Evaluation.)
- B15959, Forwards Root Cause Evaluation rept-effectiveness of Oversight Organization Per Evaluation Conducted in May 1996. More Contact Between Chief Nuclear Officer & Line Mgt Recommended + (Forwards Root Cause Evaluation rept-effectiveness of Oversight Organization Per Evaluation Conducted in May 1996. More Contact Between Chief Nuclear Officer & Line Mgt Recommended)
- JPN-92-067, Forwards Root Cause Failure Analysis of Equalization Line on Reactor Water Cleanup Valve 12RWC-46, & ASME Section XI Repair Program for Repair of RWCU Valve 12RWC-46 - 1/2 Inch Equalization Line Plant Mod M1-92-383 + (Forwards Root Cause Failure Analysis of Equalization Line on Reactor Water Cleanup Valve 12RWC-46, & ASME Section XI Repair Program for Repair of RWCU Valve 12RWC-46 - 1/2 Inch Equalization Line Plant Mod M1-92-383)
- ML20147A785 + (Forwards Root Cause Investigation of Shutdown Cooling Isolations Peach Bottom Atomic Power Station, Per 880111 Commitment.Results of Evaluation & Corrective Actions Planned or Taken Will Be Provided to NRC by 880610)
- ML20147A788 + (Forwards Root Cause Investigation of Shutdown Cooling Isolations Peach Bottom Atomic Power Station, Per 880111 Commitment.Results of Evaluation & Corrective Actions Planned or Taken Will Be Provided to NRC by 880610)
- ML17303A625 + (Forwards Root Cause of Failure Rept..., Arizona Nuclear Power Project Metallurgical Investigation Rept... & Metallurgical Rept, Per NRC Request to Complete Evaluation of Unit 3 Diesel Generator B)
- ML17303A626 + (Forwards Root Cause of Failure Rept..., Arizona Nuclear Power Project Metallurgical Investigation Rept... & Metallurgical Rept, Per NRC Request to Complete Evaluation of Unit 3 Diesel Generator B)
- ML20155A664 + (Forwards Rorem Et Al 860403 Brief Re Admissibility of late-filed Amended QA Contention & Exhibits,Including Documents Submitted in Camera in Sealed Envelopes)
- RBG-36692, Forwards Rosemount Rept Concluding That Transmitter Identified as Being Out of Calibr,Per Investigation Into Cause of 910922 Event Due to Loss of fill-oil + (Forwards Rosemount Rept Concluding That Transmitter Identified as Being Out of Calibr,Per Investigation Into Cause of 910922 Event Due to Loss of fill-oil)
- ML19354E855 + (Forwards Rosenthal Investigation 89-02,second Interim Rept, for Placement in Pdr.Rept Release Approved by Commission)
- ML18045A451 + (Forwards Rough Draft Rept Detailing NRC Safety Topic VII-2, Engineered Safety Feature Sys Control Logic & Design. Requests Comments & Recommendations)
- ML20212L070 + (Forwards Rough Draft Spec for Seismic Review of Outdoor Storage Tanks & Mechanical & Electrical Equipment Informally Submitted by Util.Final Version of Spec Included in Amend 50 to FSAR)
- ML19274C763 + (Forwards Rough Draft Workingpapers on Subj Facil Amended Security Plan,Intended Solely for Use of Jr Berggren. Comments Withheld from Public Disclosure Pursuant to 2.790)
- ML20126H212 + (Forwards Rough Draft of New NRC Manual Chapter 0517, Mgt of Allegations, for Review.Proposes Working Group Meeting on 840221 to Discuss Changes,Mods or Issues.Final Draft Target Date Is 840229)
- ML20197F435 + (Forwards Rough Draft of Proposed Study in Response to long- Standing NSSM-120 Re Effectiveness of Intl Safeguards.Info Partially Withheld)