ML20147A788

From kanterella
Jump to navigation Jump to search
Forwards Root Cause Investigation of Shutdown Cooling Isolations Peach Bottom Atomic Power Station, Per 880111 Commitment.Results of Evaluation & Corrective Actions Planned or Taken Will Be Provided to NRC by 880610
Date released: 06/09/2020 Download: ML20147A788


Root Cause Investigation of Shutdown Cooling Isolations Peach Bottom Atomic Power Station.
ML20147A797
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 02/23/1988
From: Gallagher J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
References
Download: ML20147A797 (61)
Forwards Root Cause Investigation of Shutdown Cooling Isolations Peach Bottom Atomic Power Station, Per 880111 Commitment.Results of Evaluation & Corrective Actions Planned or Taken Will Be Provided to NRC by 880610
ML20147A785
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 02/26/1988
From: Gallagher J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: KANE W F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML20147A785 (1)