Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Response to Re Reliability of Standby Diesel Generator Units". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20215J750  + (Forwards Response to Re L Lanpher Informal Request for Documents to NRC Staff.Related Correspondence)
  • ML20210H450  + (Forwards Response to Re License Amend Request to Incorporate Effect of Increased Reactor Coolant Sys Volume Resulting from Planned Replacement of SGs at Byron,Unit 1 & Braidwood,Unit 1.Response to Question 4,encl)
  • ML18033A492  + (Forwards Response to Re List of Submittals Needed to Support Restart.Info Re Electrical Design Issues Submitted on 881209 & 890106.Maint Improvement Program as Part of Nuclear Performance Plan Will Be Sent by 890215)
  • ML20003H368  + (Forwards Response to Re Lrg Reactor Sys Branch Issues.Info to Be Incorporated Into May 1981 FSAR Revision. W/O Encl)
  • ML20127P834  + (Forwards Response to Re Mod of Physical Security Plan.Encl Withheld (Ref 10CFR73.21))
  • ML20132C224  + (Forwards Response to Re Model CNS 21-300,revised SAR & Request for nonsafety-related Change)
  • ML20154D229  + (Forwards Response to Re NRC Mgt of Advisory Committees Under Federal Advisory Committee Act.Commission Answers to Specific questions, & NRC 880512 Memo Encl)
  • NUREG-1195, Forwards Response to Re NRC Reexam of B&W Reactor Design.Review Efforts Intensified After TMI Accident.Nrr Reorganized Last Yr to Increase Attention to Major Vendor Product Lines.Action Plan Under Development for Rancho Seco  + (Forwards Response to Re NRC Reexam of B&W Reactor Design.Review Efforts Intensified After TMI Accident.Nrr Reorganized Last Yr to Increase Attention to Major Vendor Product Lines.Action Plan Under Development for Rancho Seco)
  • ML19210D033  + (Forwards Response to Re NRC Requirements for Auxiliary Feedwater Sys.Refueling Shutdown Will Commence on 791201.Some Testing Recommendations Will Not Be Scheduled Until Startup Testing Performed)
  • ML17258A515  + (Forwards Response to Re NUREG-0612 Control of Heavy Loads. Response Identifies Extent to Which Facility Conforms to Section 2.1, General Requirements for Overhead Handling Sys)
  • L-80-419, Forwards Response to Re NUREG-0737 Implementation Status of post-TMI Requirements  + (Forwards Response to Re NUREG-0737 Implementation Status of post-TMI Requirements)
  • L-83-552, Forwards Response to Re NUREG-0737, Item III.D.3.4, Control Room Habitability. Two Outstanding Concerns Re Lack of Redundancy for Isolation Damper & Emergency Supply Fan Addressed  + (Forwards Response to Re NUREG-0737, Item III.D.3.4, Control Room Habitability. Two Outstanding Concerns Re Lack of Redundancy for Isolation Damper & Emergency Supply Fan Addressed)
  • ML20033D135  + (Forwards Response to Re NUREG-0737,Item II.K.3.44 on BWR Owners Group Evaluation of ATWS Combined W/Single Failure)
  • ML20032E306  + (Forwards Response to Re Natural Circulation Cooldown.Specific Procedure Based on Rapidly Coolingdown RCS & Holding Pressure Before Initiating Shutdown Cooling Will Be Implemented by 820401)
  • ML20215K000  + (Forwards Response to Re Noncompliance Noted in Insp Rept 70-1151/86-14 on 860818-22.Response Withheld (Ref 10CFR2.790(d)))
  • ML20214Q566  + (Forwards Response to Re Noncompliances Noted in Insp Rept 50-346/87-09.Encl Withheld (Ref 10CFR73.21))
  • ML20125A917  + (Forwards Response to Re Notice of Violation & Proposed Imposition of Civil Penalty Noted in Insp Rept 50-327/85-24 Due to Seal Tube Leak & Thimble Tube Ejection Event)
  • ML20028C461  + (Forwards Response to Re Offgas Explosions at Facilities.Augmented Offgas Sys Added to All Large BWRs Reducing Potential for Collection of Explosive Hydrogen Mixtures)
  • ML20023B798  + (Forwards Response to Re Open Items in NUREG-0612, Control of Heavy Loads at Nuclear Power Plants. Dynamic Load Effects,Inservice Insp & Exam Frequency Reviewed.Phase II Results Expected by 830601)
  • ML20080N292  + (Forwards Response to Re Operability Qualification of Pumps & Valves.Qualification & Installation of Active Pumps & Valves 90% Complete,Per 830916 Telcon)
  • ML19257A973  + (Forwards Response to Re Possible Revocation of Facility Cp.Commissioners Will Determine by 800131 Propriety of Director Denial Re Requests for Mod,Suspension or Revocation of CP)
  • ML19323A398  + (Forwards Response to Re Potential Design Deficiencies in Bypass,Override & Reset Circuits of Engineered Safety Features.Addl Info Will Be Forwarded in Response to IE Bulletin 80-06)
  • ML20053D535  + (Forwards Response to Re Proposed Mod to Decommissioning Fundamental Nuclear Matl Control Plan Involving Handling of Grit Drums.License Condition 2.1 Will Be Revised & New License Condition 5.3 to Amend MPP-2 Added)
  • ML19249D935  + (Forwards Response to Re Questions Raised by Senators Domenici & Tsongas Following 790510 Hearing on Waste Mgt & Siting)
  • ML20049H812  + (Forwards Response to Re R&D Program on Hydrogen Control & Combustion.Permanent Hydrogen Mitigation Sys Will Replace Present Interim Distributed Ignition Sys)
  • ELV-00332, Forwards Response to Re Request for Certain Existing Plant Documents to Be Utilized in Development of risk-based Insp Guide.W/O Attachments  + (Forwards Response to Re Request for Certain Existing Plant Documents to Be Utilized in Development of risk-based Insp Guide.W/O Attachments)
  • ML20134F034  + (Forwards Response to Re Request for Info Per 10CFR50.54(f) Concerning Adequacy & Availability of Design Bases Info)
  • ML19209A605  + (Forwards Response to Re Request for Suppl to 790806 Submittal Regarding IE Insp Repts 50-413/79-12 & 50-414/79-12.Discusses Each Generic Example Re QA Procedure P-1)
  • ML17326A411  + (Forwards Response to Re Requirements for Auxiliary Feedwater Sys Identified During Bulletins & Orders Task Force Review of Operating Reactors.Valves Locked or Sealed & Mod to Feedpump Train to Be Completed)
  • ML19210D324  + (Forwards Response to Re Requirements for Auxiliary Feedwater Sys.Manual Sys Valves Locked Open. Existing Emergency Procedures Will Be Upgraded to Provide Instructions for Transfer to Alternate Sources)
  • ML19291C195  + (Forwards Response to Re Requirements for Auxiliary Feedwater Sys.Valves Locked in Required Position to Insure Flow Path to Generators.Emergency Procedures Changed for Sources of Water to Feedwater Tank)
  • ML20003E639  + (Forwards Response to Re Resolution of Open Items Described in NUREG-0680.Functional/verification Test Procedures for Restart Mods Will Be Submitted by 810501,in Startup Tech Specs)
  • ML20137W009  + (Forwards Response to Re Results of State of Az Radiation Control Program During June 1985 Review.Internal Procedures Should Be Completed within 1 Yr.Solution to Data Processing Being Sought)
  • ML20077D844  + (Forwards Response to Re Rev 6 to Security Plan. Response Withheld (Ref 10CFR2.790))
  • TXX-4395, Forwards Response to Re Safe Handling of Heavy Loads.Facility Design Employs roll-away Steel Missile Shield Over Reactor.No Concrete Structures Lifted in Vicinity Of,Or Over Spent Fuel  + (Forwards Response to Re Safe Handling of Heavy Loads.Facility Design Employs roll-away Steel Missile Shield Over Reactor.No Concrete Structures Lifted in Vicinity Of,Or Over Spent Fuel)
  • ML20079L958  + (Forwards Response to Re Safety Evaluation for Environ Qualification of safety-related Electrical Equipment.Adequate Mechanism Exists to Call Attention to New Data Affecting Qualification Status of Equipment)
  • ML20069E493  + (Forwards Response to Re Safety Features Actuation Sys Shared Power Supply Returns.Permanent Grounding of Power Supply Commons to Instrument Ground Will Be Provided to Resolve Channel Independence Issue)
  • ML19345G515  + (Forwards Response to Re Schedule for Implementation of post-TMI Requirements for Upgrading Emergency Response Facilities)
  • SNRC-1185, Forwards Response to Re Scoping Study on Unisolated LOCA Outside Drywell for Reactor Bldg.Capability of Valves to Isolate Pipe Break Downstream of Valve Under Blowdown Conditions Demonstrated  + (Forwards Response to Re Scoping Study on Unisolated LOCA Outside Drywell for Reactor Bldg.Capability of Valves to Isolate Pipe Break Downstream of Valve Under Blowdown Conditions Demonstrated)
  • ML20076E372  + (Forwards Response to Re Security Program Improvements in Connection W/Ie Investigation Rept 50-220/81-22 & IE Enforcement Conference Rept 50-220/81-26. Encl Withheld (Ref 10CFR73.21))
  • ML20054H466  + (Forwards Response to Re Shipment of Model 500-SU Source Changer W/Two Sealed Sources & Use of Overpack for Certain Shipments.Amend to Certificate of Compliance Must Be Obtained,Prior to Use of Modified Packaging & Contents)
  • ML20024B327  + (Forwards Response to Re Small Break LOCA Analysis)
  • ML19332A522  + (Forwards Response to Re TMI-1 Fuel Assembly Holddown Springs.No Failed or Damaged Holddown Springs Identified.B&W Investigations Revealed No Significant Safety Concerns)
  • ML19344A881  + (Forwards Response to Re Task Action Plan for Category a Technical Activity A-36, Control of Heavy Loads Near Spent Fuel)
  • ML20235A647  + (Forwards Response to Re Transmitting Results & Conclusions of Regulatory Effectiveness Review on 870309-13. Response Withheld (Ref 10CFR73.21))
  • ML20247C411  + (Forwards Response to Re Tritium shipper-receiver Discrepancies Between ORNL & Surelite,Ltd.Doe Commissioned Special Team,W/More Extensive Experience W/Tritium,To Continue Investigation of Discrepancies)
  • ML19325C170  + (Forwards Response to Re Tritium shipper-receiver Discrepancies Between ORNL & Surelite,Ltd.Doe Commissioned Special Team,W/More Extensive Experience W/Tritium,To Continue Investigation of Discrepancies)
  • ML20113D470  + (Forwards Response to Re Two Deficiency Items Identified in Review of Revs 5-12 of Radiological Emergency Plan)
  • RBG-20686, Forwards Response to Re Use of Shift Advisors. Training Programs & Operational Procedures Shift Advisors Will Follow to Suppl Operating Shift Crew W/Hot Operational Experience Provided  + (Forwards Response to Re Use of Shift Advisors. Training Programs & Operational Procedures Shift Advisors Will Follow to Suppl Operating Shift Crew W/Hot Operational Experience Provided)
  • ML20024B091  + (Forwards Response to Re Util Independent third- Party Design & Const Verification Program & Const Completion Program.Actions Being Taken Should Provide Assurance to Community That Plant Constructed Safely)