ML18033A492
| ML18033A492 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 12/28/1988 |
| From: | Gridley R TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NUDOCS 8901030071 | |
| Download: ML18033A492 (11) | |
Text
ACCELERATED D1 O'EON DEMONSTRA, N
SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8901030071 DOC.DATE: 88/12/28 NOTARIZED: NO FACIL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee AUTH.NAME '
AUTHOR AFFILIATION GRIDLEY,R.
Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
DOCKET 05000260 05000260
/,'UBJECT:
Forwards response to 881120 ltr re list of submittals needed to support restart.
DISTRIBUTION CODE:
D030D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: TVA Facilities Routine Correspondence NOTES:1 Copy each to: S.Black, J.G.Partlow, S.Richardson B.D.Llaw,F.McCoy.
RECIPIENT ID CODE/NAME SIMMS,M GEARS,G COPIES LTTR ENCL 1
1 1
1 RECIPIENT ID CODE/NAME PD COPIES LTTR ENCL 1
D, INTERNAL: ACRS EXTERNAL: LPDR NSIC NOTES STRACT 01 1
1 1
1 1
1 1
.1 1
1 ADM/LFMB OGC/HDS2 NRC PDR
,1 0
1 0
R I
D h
NOTE IO ALL "RIDS>> RECIPIENTS:
PLEASE HELP US 'ZO REDUCE WASTEl ~CT IHE ~EÃ1'ONSOL DESK RcjOM Pl-37 (EXT. 20079) K) ZXZK2QTE DER NAME FMH DISTRIKTZIGN LISTS FOR DOCUMEÃIS YOU DON'T NEZDf TOTAL NUMBER OF COPIES REQUIRED-LTTR 16 ENCL 14
~
P.
TENNESSEE VALLEYAUTHORITY CHATTANOOGA. TENNESSEE 37401 5N 157B Lookout Place QM SS 1888 U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.CD 20555 Gentlemen:
In the Matter of Tennessee Valley Authority Docket No.
50-260 BROWNS FERRY NUCLEAR PLANT (BFN) RESPONSE TO LIST OF SUBMITTALS NEEDED FROM TVA TO SUPPORT RESTART This letter is in response to your November 22, 1988 letter from S. Black to
- 0. Kingsley.
Your letter provided a list of submittals and actions which the NRC Staff needed from TVA to support NRC decisions regarding unit 2 restart.
Enclosure 1 to this letter provides the Staff with an actual submittal date or a committed completion date for all submittals discussed in the staffs'etter.
New committed submittal dates are so annotated on this enclosure.
No other commitments are made by this letter.
Enclosure..2 to...th.i,.s..letter, provides the Staff with the status of the TVA actions-which were discussed'-
in the Staffs'etter.
These enclosures reflect the status of TVA actions and submittals as of December 28, 1988.'lease refer any questions regarding this submittal to Patrick Carier, Acting
- Manager, BFN Site Licensing, (205) 729-3570.
Very truly yours, TENNESSEE VALLEY AUTHORITY Enclosures cc:
See page 2
R. Gridley, anager Nuclear Lic nsing and Regulato y Affairs pD3 890i03007i 88i228 PDR 4DOCK 05000260" P
PDC'n Equai Opportunity Employer
, t l
\\
a
U.S. Nuclear Regulatory Commission cc (Enclosures):
Ms. S.
C. Black, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockvi lie, Maryland 20852 Mr. F.
R.
McCoy, Acting Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Browns Ferry Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637
- Athens, Alabama 35609-2000
ENCLOSURE 1
LISTING OF SUBMITTALS AND COMMITTED COMPLETION DATES TAC SUBMITTAL COMPLETION DATE COMMENTS 66260A Electrical Design Issue-Ampaci ty 00458 Moderate Energy Line Break 11/30/88 S
12/09/88 S
66260C 66260F 00421 00493 00156 Electrical Design Issue Fuse Program Electrical Design Issue Thermal Overload Review Electrical Design Issue Cable Installation Electrical Design Issue Separation Program Control Room Habitability Barge Traffic 12/09/88 S
12/09/88 S
12/09/88.
S 01/06/89 04/24/89 Has included with the Ampacity submittal.
Has included with the Ampacity submittal.
i)as included with the Ampacity submittal.
00465 Control Room Emergency Ventilation System Technical Specification 01/31/89 C
TVA is continuing to
, evaluate dose rates and effectiveness of compensatory actions.
62737 Nuclear Performance Plan (NPP)
Independent Safety Engineering Group 99999 Readiness for 10 CFR 50, Appendix R audit 62251 Nuclear Performance Plan (NPP)
Maintenance Improvement Program 12/30/88 C
02/04/89 02/15/89 C
S Denotes actual submittal date C Denotes new commitment date
~ 4
ENCLOSURE 1
(CONTINUED)
LISTING OF SUBMITTALS AND COMMITTED COMPLETION DATES TAC 62265 99990 SUBMITTAL Nuclear Performance Plan (NPP) - Operational Readiness Program Environmental Qualification Certification COMPLETION DATE 02/17/89 C
02/28/89 COMMENTS S Denotes actual submittal date C Denotes new commitment date
t ENCLOSURE 2
LISTING OF FOLLOH-UP TVA ACTIONS 1.
Action:
Status:
TVA will confirm prerequisite schedule for Design Baseline and Verification Program inspection (i.e., calculations of each type to be 80-90 percent complete and 20-30 percent of the Calculation Cross Reference Identification System completed.
TVA discussed the prerequisite schedule for the Design Baseline and Verification Program inspection at our December 21, 1988 scheduling meeting.
2.
Action:
TVA will provide confirmation that they have reviewed the Browns Ferry Unit 2 Technical Specifications to ensure plant changes have been addressed for the NRC Staff.
Status:
TVA is developing an action plan to address this concern.
~
~
~ v