L-78-207, Forwards Response to Re Reliability of Standby Diesel Generator Units
| ML17212A361 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 06/16/1978 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17212A360 | List: |
| References | |
| L-78-207, NUDOCS 8107210127 | |
| Download: ML17212A361 (4) | |
Text
t Enclosure 3
P. O. BOX 013100, MIAMI
~ PI 33'101 Jp C
.c
) yQ Q
cLORIOA POVIER h I.IGHT COMPANY June 16, 1978 L-78-207 Director of Nuclear Reactor Regulation U.
S
~ Nuclear Regulatory Commission Washington, DC 20555
Dear Sir:
Re:
St. Lucie Unit No.
1 Docket No. 50-335 Diesel Generator Tnformation The attached information is submitted in resaonse to a letter from Karl R. Goller dated December 15, 1977.
Very truly yours,
~'~ ~
~ ~m~~
Robert E. Uhrig Vice President RZU/mS/bb Attachment cc:
Nr. James P. O'Reilly, Region ZI Harold F. Reis, Esquire
"~i 7'3005 i 81072iOi27 Bi070'P
~ PDR
- DOCK 0800033S I, F PDR i
(
~
~
s S.
Are an! foraion oases suck as propane, freon, halon, c roon dioxide, etc.
s tored in the:
Diesel Engine room?
Yes No or adjacent buildings'?
Yes No x
Gases If yes, (other than hand portable fire extinguishers),
th n
identify gases and give approximat tank size.
Volume (ft )
T.
Does control sys m autcmatically bypass, in em rgency
- starting, any engine temporarily out of service for maintenance?
Yas lio x
I-. yes, tf en how many failures to bypass have occured?
Y.
Tive are 4
vote: QKQBxgers
~mt
'Yc'w, any 3 flu es?
? abc
~
~
gf
~
am e
care Give nature of failure.
alar+~ar a 1
@y ces"gn).
ai 20Q m, LK ~aB 1 011 pup rM."m cetyl~ ar'mrna.
Desi'nance i~l~nt~
~
1 a
sm ~a~~
bms i bcarg+~le Ce'mme 335-77-42,. follcwup remr" 41, of S/1S/78 Does the control system automatically override the test mode under emergency conditions?
Yes No x
Have repetitive mechanical failures occurred in any component part or sub+s'iM of the engi ie, generator, or s~i tch gear, e.c. 7 Yes a
Tuzhc-chzge~?
less of lcbricaticn e If ves, then which part or subsyst m.
- tm-IGer l
W.
'Aould perioaic (yearly or other) evalua ion and/or testing by "outside experts" con ribute significantly to the diesel-ganara or reliability?
Yas No Give brief reasons for the answer. Me have suf icien't knowledge M.
i i'i >>.
Y l r'-chara rs has confirmed
-in-house evaluation alluded to Y
o v
~
e i ~
X. l.
Give the accumulated time-load operating record for each diesel-generator unit from installation to the present (Running Hours):
Preoperational test Date 8-75 Engine
- Serial No.:
Surv. Testing 6:
Emer gency:
Total t<aintenance Hrs.
and Other Hours No Load:
Loaded Service Hrs.
~
~10
- ~161:
~ 15 186 lB: ~3.0
~124:
~ 15 igQ s
4 e
e e
tOTE: Total Hours were read off nour meter emaining rough estimates.
Z.
Surveillance test load (percent of contimmns ratarrr) 3.
Give the projected or olarned time-load 'operation for each diesel-generator unit during the next 12 months.
numo are 95-100% a~~ 1-7S
- Surveillanc
- haintenance Hrs.
Emergency and other Se. vice Hrs.
Total Hours
~36
~36 r ~
P Qvide the fol 1owi ng summary of the periodic surveil lance testing experience:
a.
b.
c de Starting d=te of surveillance testing (QL date) 3>>1-76
'eriodic
" st int rval ~they'3.us ~~ S'~s Total numb r of surveillance tests perrormed 80*
5 SG>>
failure m start i ~ ~ki'lure to accept 1o d >- ~d tete ce-c". dtti' 5
E then turbo-aai'iure d ~ to equipment not being operative during emergency charger failed
~hindi tion-pmbl
.e.
Supply a copy oa the surve;llance test procedures with this cc"pleted auestionnaire.
gl r
hl