Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17346B013 + (Forwards Response to Open Items Identified in NRC 850304 Evaluation of Conformance W/Reg Guide 1.97.Rev 1 to Reg Guide 1.97 Repts Encl.Repts Differentiate Between SPDS & Supporting Safety Assessment Sys Instruments)
- ML17346B014 + (Forwards Response to Open Items Identified in NRC 850304 Evaluation of Conformance W/Reg Guide 1.97.Rev 1 to Reg Guide 1.97 Repts Encl.Repts Differentiate Between SPDS & Supporting Safety Assessment Sys Instruments)
- A05946, Forwards Response to Open Items Identified During 860508 Meeting Re Proposed Rev to Pump & Valve Inservice Testing Program.Rev IWV-1 Table for Valve Testing Program, Description of ECCS Full Flow Test & Insp Procedure Encl + (Forwards Response to Open Items Identified During 860508 Meeting Re Proposed Rev to Pump & Valve Inservice Testing Program.Rev IWV-1 Table for Valve Testing Program, Description of ECCS Full Flow Test & Insp Procedure Encl)
- ML20054C490 + (Forwards Response to Open Items Listed in BNL Technical Evaluation Rept Post-Fire Shutdown Capability. Also Forwards Revisions to Safe Hot Shutdown Analysis & Safe Cold Shutdown Analysis)
- ML13317B330 + (Forwards Response to Open Items Noted During NRC 910926-27 Site Visit Re Control Room Habitability,Per TMI Item III.D.3.4.Operator Thyroid Dose Reduced Below Regulatory Limit W/O Need for Potassium Iodide Pills)
- BECO-87-021, Forwards Response to Open Items Noted in Eg&G Idaho,Inc Review of Reg Guide 1.97 Compliance & Comparison of Accident Monitoring Instrumentation at Facility Vs Instrumentation Recommended by Reg Guide 1.97,per Generic Ltr 82-33 + (Forwards Response to Open Items Noted in Eg&G Idaho,Inc Review of Reg Guide 1.97 Compliance & Comparison of Accident Monitoring Instrumentation at Facility Vs Instrumentation Recommended by Reg Guide 1.97,per Generic Ltr 82-33)
- ML20140E062 + (Forwards Response to Open Items Noted in Interim Rept Transmitted by NRC Re Conformance to Reg Guide 1.97)
- ML17256B204 + (Forwards Response to Open Items Noted in Draft SEP Integrated Plant Safety Assessment Rept,NUREG-0821.Every Effort Will Be Made to Ensure Task Completion within Schedule)
- ML20094K881 + (Forwards Response to Open Items Noted in 920206 SER on Util Compliance W/Station Blackout Rule.Operation of RCIC Acceptable W/O RCIC Gland Seal Compressor,Based on GE Spec 21A9526)
- ST-HL-AE-1999, Forwards Response to Open Items Noted in Insp Repts 50-498/86-42 & 50-499/86-42.Corrective Actions:Evaluation of Potential Effects on Safe Shutdown Components as Result of Spurious ESF Actuation Performed + (Forwards Response to Open Items Noted in Insp Repts 50-498/86-42 & 50-499/86-42.Corrective Actions:Evaluation of Potential Effects on Safe Shutdown Components as Result of Spurious ESF Actuation Performed)
- ML20088A298 + (Forwards Response to Open Items Re Detailed Control Room Design Review,Per 840309 Draft Ser.Upgraded Emergency Program Will Be Fully Implemented by Fuel Load,Per NUREG- 0737,Items II.B.1,II.D.3,II.F.1 & II.F.2)
- ML19331B933 + (Forwards Response to Open Items Re Fuel Loading & Low Power Testing Resulting from 800801 Meeting W/Nrc.Items Include Shift Manning,Training for Mitigating Core Damage & Independent Safety Engineering)
- ML20151R071 + (Forwards Response to Open Items Re Loss of Ventilation Sys for App R Event in Nuclear Services & Decay Heat Closed Cycle Cooling Pump,Emergency Feedwater Pump,Diesel Generator Rooms & Control Bldg)
- ML20004D930 + (Forwards Response to Open Items Re Primary Coolant Outside Containment,Valve Position Indication,Nonqualified Equipment & Bypass Leakage.Draft Revised FSAR Amend 33 & Answers to 810601 Structural Engineering Branch Questions Encl)
- ML20202F411 + (Forwards Response to Open Items Remaining from Sqrt/Pvort Site Audit Meeting.Requests That Resolution of Portion of SER Outstanding Issue 6 Be Reflected in Sser)
- ML20070S493 + (Forwards Response to Open Items from 910304-06 Meetings on Plant Sys)
- ML20078L497 + (Forwards Response to Open Items from ACRS Subcommittee 940824 Meeting on Thermal Hydraulic Phenomena)
- ML20096H012 + (Forwards Response to Open Items from Rept on Inservice Testing of Pumps & Valves.Relief Requests PR-5,VR-12 & VR-39 Deleted & VR-6 & VR-14 Changed to Indicate 2 as Limiting Time to Demonstrate Valve Operability)
- ML20155E485 + (Forwards Response to Open Items in Draft SE Re B&Wog Generic License Renewal Program Topical Rept BAW-2251, Demonstration of Mgt of Aging Effects for Reactor Vessel)
- ML18033A902 + (Forwards Response to Open Items in Insp Repts 50-259/89-07, 50-260/89-07 & 50-296/89-07.Corrective Actions:Rigorous Analysis Handbook Will Be Revised to Require Equipment Nozzle Thermal Displacements to Be Considered)
- ML20237E786 + (Forwards Response to Open Items in Technical Evaluation Rept Re Facility Conformance W/Rev 2 to Reg Guide 1.97.No New Mods Identified as Result of Review)
- ML19321A531 + (Forwards Response to Open Items of IE Bulletins 79-02 Re Pipe Support Base Plate Designs & 79-14 Re Seismic Analysis of safety-related Piping Sys Identified in IE Insp Rept 50-302/80-02)
- ML19321A532 + (Forwards Response to Open Items of IE Bulletins 79-02 Re Pipe Support Base Plate Designs & 79-14 Re Seismic Analysis of safety-related Piping Sys Identified in IE Insp Rept 50-302/80-02)
- ML20039A224 + (Forwards Response to Open Items of Preliminary SER Draft, Section 18)
- ML17303A204 + (Forwards Response to Operational Concerns Discussed During 861028 Meeting.Util Actively Pursuing Both Short & long-term Mods to Core Protection Calculators (CPC) Which Will Allow CPC to Ride Through Transients W/O Unnecessary Trips)
- ML20058C706 + (Forwards Response to Operational Readiness Review Phase Two Rept)
- ML20086L724 + (Forwards Response to Operational Safeguards Response Evaluation Conducted at Plant Site on 911115 Re Safeguards Treatment of Security Controlled Areas & Secondary Security Controlled Areas.Response Withheld)
- ML20078D790 + (Forwards Response to Operational Safeguards Response Evaluation.Encl Withheld (Ref 10CFR2.790(d)))
- ML20086S410 + (Forwards Response to Operational Safeguards Response Evaluation Transmitted Via NRC .Encl Withheld)
- ML20138B792 + (Forwards Response to Operator Licensing Exam Rept 50-346/OL-96-02 on 961220.Corrective Actions:Guidance Developed for Periodic Assessment of Candidate Weaknesses to Ensure That Past & Current Weaknesses Identified)
- ML20027B890 + (Forwards Response to Operator Licensing Branch 820915 Request for Addl Info in Form of Revisions to FSAR Section 13.2.Response Will Be Included in Future Amend to OL Application)
- ML20023D021 + (Forwards Response to Outstanding Environ Qualification Items Identified in Section 7.8 of Suppl 6 to SER & Technical Evaluation Rept.Info Supports Full Power Licensing)
- ML20093H808 + (Forwards Response to Outstanding Issue 196 of Draft SER Section 8.3.3.1.1, Submerged Electrical Equipment as Result of LOCA, Per Aug Meeting)
- ML20095J375 + (Forwards Response to Outstanding Issues 140 & 144 in Ref to Rev of App 15E - ATWS Analysis of ABWR Dser SECY-91-355)
- ML20043A553 + (Forwards Response to Outstanding Issues & Request for Addl Info from 891128-30 Advanced BWR Seismic Design Audit at GE Ofcs in San Jose,Ca.Info Resolves Sections 2 & 3 to Draft SER & Action Items)
- ML20206U289 + (Forwards Response to Outstanding Items Identified in HGN-032 Re BWR Core Heatup Code,Per 850130 Meeting. Response to Third Issue Discussed During 850604 Meeting W/ NRC & BNL Will Be Provided by 850628)
- ML20099K999 + (Forwards Response to Outstanding Items in Ssers 3 & 4, Section 3.11 Re DG Obrian Electrical penetration-Type H Module,Valcor Solenoid Valve operators-Models 70900-21-1 & 3 & Main Steam Line Break in Doghouse)
- ST-HL-AE-2539, Forwards Response to Outstanding Operation Readiness Insp Issues in Insp Repts 50-498/87-45 & 50-498/88-01.Rev to 1POP04-ZO-0001 Re Control Room Evacuation Approved W/Changes After Training Drill.Shifts Briefed Re Change + (Forwards Response to Outstanding Operation Readiness Insp Issues in Insp Repts 50-498/87-45 & 50-498/88-01.Rev to 1POP04-ZO-0001 Re Control Room Evacuation Approved W/Changes After Training Drill.Shifts Briefed Re Change)
- ML20245A322 + (Forwards Response to PRA Audit on 881101-02)
- ML20084D922 + (Forwards Response to Palmetto Alliance & Carolina Environ Study Group 840412 Motion to Readmit Contentions on Severe Accidents,Control Room Deficiencies & Lack of Financial Qualifications.Certificate of Svc Encl)
- ML20078A649 + (Forwards Response to Paragraph 6.2 of Generic Ltr 82-33 Re Control Room Displays.Schedule for Completing Implementation of Reg Guide 1.97 Requirements Will Be Incorporated in Forthcoming Confirmatory Order)
- ML20214T491 + (Forwards Response to Parks Re Allegations. Concerns Will Be Investigated by Ofc of Inspector & Auditor as Part of agency-wide Audit of NRC Allegation Mgt Practices)
- ML19312D852 + (Forwards Response to Part I of NRC 800502 Request for Addl Info Re Restart After 800226 Accident.Util Is Installing Redundant Indicators Above Intercommunication Sys Section of Control Board.Part II Responses Will Follow)
- ML20049J314 + (Forwards Response to Part a of Question 320.1 on Financial Qualifications)
- ML20057A635 + (Forwards Response to Parts of Encl 3 Re 1991 Natl Program Review Schedule & Agenda)
- ML20205K201 + (Forwards Response to Peer Review Comments of NUREG/CR-4829, Shipping Container Response to Severe Highway & Railway Accident Conditions)
- ML20134F736 + (Forwards Response to Petition Filed on 960305 Re Request That Operating Licenses of All NPPs Be Suspended within 90 Days & Remain Suspended Until Such Time as Licensees of Plants Discovered Reason for Errors)
- ML20134F737 + (Forwards Response to Petition Filed on 960305 Re Request That Operating Licenses of All NPPs Be Suspended within 90 Days & Remain Suspended Until Such Time as Licensees of Plants Discovered Reason for Errors)
- ML17296A620 + (Forwards Response to Petition of Friends of the Earth for NRC to Prepare Supplemental EIS Re Impact of Class 9 Accidents at Facilities)
- ML17296A621 + (Forwards Response to Petition of Friends of the Earth for NRC to Prepare Supplemental EIS Re Impact of Class 9 Accidents at Facilities)
- ML20054H244 + (Forwards Response to Petition to Intervene in Startup of Facility Until Reactor Core Can Be Safely Offloaded in Event of Emergency.Declines to Take Action Re Request.Decision Will Be Filed W/Secretary of Commission for Review)