MONTHYEARML20248E1991998-05-28028 May 1998 Informs That Staff Has Identified Six Ltrs (Enclosed) to GE Re Potential Proprietary Disclosure.Ltrs Specifically Requested That GE Review Encl to Determine If Contained GE Proprietary Info.Encl Withheld ML20247R4901998-05-20020 May 1998 Informs That Encl Staff Rept That Was Attached to Has Been Reviewed & Contains No GE Proprietary Info.W/O Encl ML20247M6911998-05-18018 May 1998 Forwards Staff Review of Rept, Giraffe Sbwr Sys Interactions Test Rept, (NEDC-3254OP,Revision-0).Informs That Review of Sbwr Was Terminated in 1996 ML20247M7021998-05-18018 May 1998 Forwards Staff Review of General Electric Panthers - IC Test Rept (Siet 00458RP95).Informs That Sbwr Was Terminated in 1996 ML20134L3181996-11-19019 November 1996 Advises That GE Pathers/Ic ATRs Submitted w/951025 Ltr Will Be Withheld from Public Disclosure Ref 10CFR2.790,based on Review of Listed Reasons for Maintaining Info as Proprietary ML20134F3861996-11-0101 November 1996 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp 99900403/96-01 on 960708 ML20134D6271996-10-25025 October 1996 Provides Sbwr - Panthers/Ic Apparent Test Results,Phase 1 Affidavit Supporting Request to Withhold Info from Public Disclosure ML20129C2881996-10-21021 October 1996 Informs of Review & Determination That Info Identified in Apparent Test Results Contain Trade Secrets or Proprietary Commercial Info & Will Be Withheld from Public Disclosure ML20128M7491996-10-11011 October 1996 Provides Affidavit to Tests & Requests That NRC Accepts Request to Withhold Sbwr Panda steady-state Test S10-S13 Pcc Performance from Public Disclosure ML20128H4971996-10-0707 October 1996 Advises That GE Giraffe Sys Apparent Test Results Repts Will Be Withheld from Public Disclosure Ref 10CFR2.790,per 960321 Request ML20128H5141996-10-0707 October 1996 Informs That Licensee 951212 Request That GE Panda steady- State Tests S1 Through S6 Pcc Performance Apparent Test Results,Rev 1 Be Withheld from Public Disclosure,Per 10CFR2.790,granted ML20128H5301996-10-0707 October 1996 Informs That Licensee 960314 Request to Withhold GE Girafee Helium Tests Apparent Test Results Repts & Data Transmittal for Giraffe Helium Tests H3 & H4 from Public Disclosure,Per 10CFR2.790,granted ML20129F5031996-10-0303 October 1996 Advises That Info Submitted in 960109 Rept Entitled, Post-Test Calculations of Panda Pcc Steady-State Test, Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEC of 1954 ML20129F5061996-10-0303 October 1996 Advises That Info Submitted in 960109 Rept Entitled, Panther/Ic Apparent Test Results Phase 3, Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEC of 1954 ML20129E8831996-10-0202 October 1996 Informs That GE Panda Steady-State Tests Data Transmittal Rept Will Be Withheld from Public Disclosure,Per 10CFR2.790 (b)(5) & Section 103(b) of AEA of 1954,as Amended ML20129F6181996-10-0202 October 1996 Advises That Giraffe Sbwr Sys Interactions Test Rept Will Be Withheld from Public Disclosure Ref 10CFR2.790, Per 960617 Request ML20129F6341996-10-0202 October 1996 Advises That Panthers/Ic Atrs Will Be Withheld from Public Disclosure Ref 10CFR2.790,per 960222 Request ML20129G5841996-10-0202 October 1996 Advises That,Data Transmittal for Giraffe Helium Tests H1 & H2,as Requested by Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of 1954 AEA ML20129E6361996-10-0101 October 1996 Advises That GE Panda Transient Integral Test Data Transmittal Repts Will Be Withheld from Public Disclosure Ref 10CFR2.790,per 960816 Request ML20129E8681996-10-0101 October 1996 Informs That Licensee 960222 Request to Withhold GE Panda Steady-State Tests S10-S13 Performance from Public Disclosure Per 10CFR2.790.Request Denied Because No Affidavit Was Submitted ML20129G6311996-10-0101 October 1996 Advises That Giraffe Helium Series Test Rept,As Requested by Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of 1954 AEA ML20248F3891996-07-31031 July 1996 Forwards Rept on Staff Evaluation of GE Tracg Model Description,Rev 1,related to Containment Area,In Response to ML20115D0441996-07-11011 July 1996 Forwards Nonproprietary NEDO-32608, Giraffe Sbwr Helium Series Test Rept. Proprietary Rept Submitted by GE ML20115C4601996-07-0808 July 1996 Addresses Nonconformances Noted in Insp Rept 99900403/96-01 Re Panda Testing.C/A:Apparent Test Results Repts (ATR) Which Contains All Info Specified in ATRs in Test Spec & Test Plans Issued for Listed Tests ML20113C2071996-06-27027 June 1996 Forwards NEDO-32540, Giraffe Sbwr Sys Interactions Test Rept ML20113B5661996-06-24024 June 1996 Forwards Proprietary Test Rept for Giraffe Helium Series Tests.Test Procedures & Instrumentation Drawings Encl.Encls Withheld Per 10CFR2.790 ML20113A0111996-06-17017 June 1996 Forwards Proprietary Rev 0 of NEDC-32540P, Giraffe Sbwr Sys Interactions Test Rept. Transmittal Satisfies Items 38 & 39 of GE Re Updated Status of Test Documentation Submittals.Encl Withheld (Ref 10CFR2.790) ML20112J0791996-06-14014 June 1996 Forwards Proprietary Version of Rev 0 to 00458RP95, PANTHERS-IC Test Rept. Rept Prepared for GE by Siet S.P.A Under Contract to Enea.Rept Withheld from Public Disclosure Per 10CFR2.790 ML20117M9651996-06-14014 June 1996 Forwards non-proprietary Rev 0 to Siet 00458RP95, PANTHERS-IC Test Rept ML20117K7091996-06-10010 June 1996 Requests 30 Day Extension Until 960710 to Respond to NRC Re Nonconformances & Unresolved Items Noted in Insp Rept 99900403/96-01 on 960305-08 ML20112G6711996-06-0707 June 1996 Forwards Responses to NRC Questions & Comments Re Rev 1 of GE Scaling Rept NEDC-3228P, Scaling of Sbwr Related Tests ML20117H4561996-05-22022 May 1996 Clarifies Charges for TAC M84214,GE Sbwr - RAI - Initial Test Program (Chapter 14) on Invoice XM0439-96,dtd 960429 ML20117F5711996-05-14014 May 1996 Requests That Je Leatherman Be Removed from Svc List & Rh Buchholz Be Added ML20108B8451996-04-26026 April 1996 Requests Addl Review of Repts by Nrc,Per Input Provided by Domestic & Intl Utils to Go Further than Indicated in GE 960304 & 13 Ltrs W/Efforts on Tracg Qualification for Sbwr Application.Utils,Epri & GE Desire to Meet W/Nrc on 960528 ML20107A4681996-04-10010 April 1996 Requests Copies of English Translations of Repts on Par, to Facilitate Sbwr Review ML20101Q6961996-04-10010 April 1996 Forwards non-proprietary Apparent Tests Results (ATR) Repts for Helium Tests & tie-back Tests ML20101F8871996-03-21021 March 1996 Forwards Proprietary Apparent Test Results Rept (ATR) Sys Interaction Tests (Sit).Proprietary Repts Withheld (Ref 10CFR2.790) ML20101F2981996-03-20020 March 1996 Forwards Latest Revs of Panda Project Control Plan & QA Procedures ML20101B7591996-03-14014 March 1996 Advises That GE Redirecting Focus of Simplified BWR Programs from Plants of 670 Mwe Size to Plants of 1,000 Mwe or Larger ML20101C4731996-03-14014 March 1996 Forwards Proprietary & Nonproprietary Apparent Test Results Rept for Four Helium Tests & Two tie-back Tests.Proprietary Repts Withheld Per 10CFR2.790.Affidavit Encl ML20101B7381996-03-13013 March 1996 Discusses Redirecting Focus of Sbwr Programs from 670 Mwe Size to 1,000 Mwe or Larger Size Plants Reducing Activity Level on Tracg Effort as It Applies to 670 Mwe Plant ML20101B7501996-03-12012 March 1996 Discusses Sbwr Closure of Vacuum Breaker Test Program ML20100N9301996-03-0404 March 1996 Informs That GE Redirecting Focus of Sbwr Program from Plants of 670 Mwe Size to Plants of 1,000 Mwe or Larger. Listing of Open Activities,Desired Closure Objective & Schedule Encl ML20101B8011996-02-26026 February 1996 Discusses Sbwr Re NRC Site Visit & Insp to Panda,Ansaldo & Dodewaard ML20100J0321996-02-23023 February 1996 Submits non-proprietary Sbwr Highlights & GE Slides from NRC 960215 Meeting ML20100J0141996-02-23023 February 1996 Forwards Proprietary Sbwr Highlights & GE Slides from NRC 960215 Meeting.Encl Withheld ML20097F7101996-02-15015 February 1996 Forwards Sbwr Status & Schedule 960214 & Payments Made to NRC for Last Four Yrs,In Response to Ref Telcon Requests ML20149K0521996-02-15015 February 1996 Forwards Proprietary Test Results for Giraffe Helium Tests H1 & H2.Attachment 1 to Ltr Provides List of Instruments Included on Computer Disk.Encl Withheld (Ref 10CFR2.790) ML20100J4041996-02-12012 February 1996 Transmits Proprietary Rev 1 to Licensing Technical Rept NEDE-32176P, Tracg Model Description Open Items.Encl Withheld ML20100G8361996-02-12012 February 1996 Forwards Proprietary Rev 1 to Topical Rept NEDE-32176P, Tracg Model Description. Rev 1 to Topical Rept NEDE-32176P Withheld 1998-05-28
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20247R4901998-05-20020 May 1998 Informs That Encl Staff Rept That Was Attached to Has Been Reviewed & Contains No GE Proprietary Info.W/O Encl ML20134D6271996-10-25025 October 1996 Provides Sbwr - Panthers/Ic Apparent Test Results,Phase 1 Affidavit Supporting Request to Withhold Info from Public Disclosure ML20128M7491996-10-11011 October 1996 Provides Affidavit to Tests & Requests That NRC Accepts Request to Withhold Sbwr Panda steady-state Test S10-S13 Pcc Performance from Public Disclosure ML20115D0441996-07-11011 July 1996 Forwards Nonproprietary NEDO-32608, Giraffe Sbwr Helium Series Test Rept. Proprietary Rept Submitted by GE ML20115C4601996-07-0808 July 1996 Addresses Nonconformances Noted in Insp Rept 99900403/96-01 Re Panda Testing.C/A:Apparent Test Results Repts (ATR) Which Contains All Info Specified in ATRs in Test Spec & Test Plans Issued for Listed Tests ML20113C2071996-06-27027 June 1996 Forwards NEDO-32540, Giraffe Sbwr Sys Interactions Test Rept ML20113B5661996-06-24024 June 1996 Forwards Proprietary Test Rept for Giraffe Helium Series Tests.Test Procedures & Instrumentation Drawings Encl.Encls Withheld Per 10CFR2.790 ML20113A0111996-06-17017 June 1996 Forwards Proprietary Rev 0 of NEDC-32540P, Giraffe Sbwr Sys Interactions Test Rept. Transmittal Satisfies Items 38 & 39 of GE Re Updated Status of Test Documentation Submittals.Encl Withheld (Ref 10CFR2.790) ML20112J0791996-06-14014 June 1996 Forwards Proprietary Version of Rev 0 to 00458RP95, PANTHERS-IC Test Rept. Rept Prepared for GE by Siet S.P.A Under Contract to Enea.Rept Withheld from Public Disclosure Per 10CFR2.790 ML20117M9651996-06-14014 June 1996 Forwards non-proprietary Rev 0 to Siet 00458RP95, PANTHERS-IC Test Rept ML20117K7091996-06-10010 June 1996 Requests 30 Day Extension Until 960710 to Respond to NRC Re Nonconformances & Unresolved Items Noted in Insp Rept 99900403/96-01 on 960305-08 ML20112G6711996-06-0707 June 1996 Forwards Responses to NRC Questions & Comments Re Rev 1 of GE Scaling Rept NEDC-3228P, Scaling of Sbwr Related Tests ML20117H4561996-05-22022 May 1996 Clarifies Charges for TAC M84214,GE Sbwr - RAI - Initial Test Program (Chapter 14) on Invoice XM0439-96,dtd 960429 ML20117F5711996-05-14014 May 1996 Requests That Je Leatherman Be Removed from Svc List & Rh Buchholz Be Added ML20108B8451996-04-26026 April 1996 Requests Addl Review of Repts by Nrc,Per Input Provided by Domestic & Intl Utils to Go Further than Indicated in GE 960304 & 13 Ltrs W/Efforts on Tracg Qualification for Sbwr Application.Utils,Epri & GE Desire to Meet W/Nrc on 960528 ML20107A4681996-04-10010 April 1996 Requests Copies of English Translations of Repts on Par, to Facilitate Sbwr Review ML20101Q6961996-04-10010 April 1996 Forwards non-proprietary Apparent Tests Results (ATR) Repts for Helium Tests & tie-back Tests ML20101F8871996-03-21021 March 1996 Forwards Proprietary Apparent Test Results Rept (ATR) Sys Interaction Tests (Sit).Proprietary Repts Withheld (Ref 10CFR2.790) ML20101F2981996-03-20020 March 1996 Forwards Latest Revs of Panda Project Control Plan & QA Procedures ML20101B7591996-03-14014 March 1996 Advises That GE Redirecting Focus of Simplified BWR Programs from Plants of 670 Mwe Size to Plants of 1,000 Mwe or Larger ML20101C4731996-03-14014 March 1996 Forwards Proprietary & Nonproprietary Apparent Test Results Rept for Four Helium Tests & Two tie-back Tests.Proprietary Repts Withheld Per 10CFR2.790.Affidavit Encl ML20101B7381996-03-13013 March 1996 Discusses Redirecting Focus of Sbwr Programs from 670 Mwe Size to 1,000 Mwe or Larger Size Plants Reducing Activity Level on Tracg Effort as It Applies to 670 Mwe Plant ML20101B7501996-03-12012 March 1996 Discusses Sbwr Closure of Vacuum Breaker Test Program ML20100N9301996-03-0404 March 1996 Informs That GE Redirecting Focus of Sbwr Program from Plants of 670 Mwe Size to Plants of 1,000 Mwe or Larger. Listing of Open Activities,Desired Closure Objective & Schedule Encl ML20101B8011996-02-26026 February 1996 Discusses Sbwr Re NRC Site Visit & Insp to Panda,Ansaldo & Dodewaard ML20100J0141996-02-23023 February 1996 Forwards Proprietary Sbwr Highlights & GE Slides from NRC 960215 Meeting.Encl Withheld ML20100J0321996-02-23023 February 1996 Submits non-proprietary Sbwr Highlights & GE Slides from NRC 960215 Meeting ML20097F7101996-02-15015 February 1996 Forwards Sbwr Status & Schedule 960214 & Payments Made to NRC for Last Four Yrs,In Response to Ref Telcon Requests ML20149K0521996-02-15015 February 1996 Forwards Proprietary Test Results for Giraffe Helium Tests H1 & H2.Attachment 1 to Ltr Provides List of Instruments Included on Computer Disk.Encl Withheld (Ref 10CFR2.790) ML20100G8361996-02-12012 February 1996 Forwards Proprietary Rev 1 to Topical Rept NEDE-32176P, Tracg Model Description. Rev 1 to Topical Rept NEDE-32176P Withheld ML20100J4041996-02-12012 February 1996 Transmits Proprietary Rev 1 to Licensing Technical Rept NEDE-32176P, Tracg Model Description Open Items.Encl Withheld ML20097D1631996-02-0101 February 1996 Advises That Charges on TACs M84204 & M84214 Appear Inappropriate as Review of Sbwr Ssar Chapters 4 & 14 Were Stopped Months Before 951001-951223 Period & No Chapter 4 RAIs Have Been Received ML20117P2221996-01-27027 January 1996 Forwards Final Rept Thermal Properties of Concrete at High Temps, ML20096G5611996-01-18018 January 1996 Requests Withdrawal of Proprietary Version of TRACG02V User'S Manual & Associated Affidavit ML20096C0641996-01-0909 January 1996 Forwards Proprietary Responses to RAIs Re Sbwr License TR NEDE-32177P (Tracg Qualification).Responses Withheld Per 10CFR2.790 ML20096B8531996-01-0909 January 1996 Forwards Proprietary Info Re Sbwr - Panthers/Ic Apparent Test Results,Per .Encl Withheld (Ref 10CFR2.790) ML20095J5441995-12-18018 December 1995 Forwards Rev 0 to NEDO-32288, Scaling of Sbwr Related Tests ML20095G8551995-12-13013 December 1995 Requests Removal of Westinghouse TR WCAP-14416 from Sbwr Docket Stn 52-004 ML20094Q7271995-11-29029 November 1995 Forwards Proprietary GE Handouts During Meeting for 951128 & 29 ACRS Thermal & Hydraulic Subcommittee in San Jose,Ca. Handouts Withheld Per 10CFR2.790 ML20094Q6061995-11-29029 November 1995 Forwards Nonproprietary Handouts Presented by GE During 951128 & 29 ACRS Thermal Hydraulic Subcommittee Meeting in San Jose,Ca ML20100E1251995-11-10010 November 1995 Forwards Rev 1 to NEDO-32391,Suppl 1, Sbwr Test & Analysis Program Description Suppl 1 - Discussion of Pirt Parameters ML20094Q0061995-11-0808 November 1995 Forwards non-proprietary Version of RAI on Sbwr Design, ML20094P1841995-11-0707 November 1995 Responds to NRC Re GE 950216 Request for Exemption of Sbwr Drywell to Wetwell Vacuum Breaker from Single Failure Criteria ML20094E0411995-11-0101 November 1995 Forwards Nonproprietary Version of Tracg Containment Model Road Map as Agreed to at 950821 & 22 Meeting ML20095B0981995-10-31031 October 1995 Addresses NRC Unresolved Items Documented in Insp Rept 99900404/95-02 ML20094D0651995-10-31031 October 1995 Forwards Proprietary Response to RAI Re Simplified BWR, Including Questions Q901.75-78,81,82,84-88,92,95-102,105- 127,132-143,146-150 & 152-158.Encl Withheld (Ref 10CFR2.790) ML20094E8521995-10-27027 October 1995 Forwards Nonproprietary Version of Ref 2,in Response to NRC Ref 1 Request Re Sbwr Design, ML20094D0361995-10-26026 October 1995 Forwards Nonproprietary Response to Rea on Licensing Topical Repts NEDE-32176P,NEDE-32177P & NEDE-32178P ML20094E7691995-10-26026 October 1995 Informs That First & Third Noted Handouts Should Be Reclassified as non-proprietary.Second & Fourth Noted Handouts Should Continue to Be Classified as Proprietary ML20095L7781995-10-25025 October 1995 Forwards Proprietary Panthers/Ic Apparent Test Results, Phase 1.Encl Withheld 1998-05-20
[Table view] |
Text
. . . .. .- . ~ . - . . . . _~ - . . . . . - . .
I I
GENuclear Energy
^ P. W. Mamott, Manager GeneralEbctnc Company AdvancedPlant Technologios 175 Curtner Annue. MC 781 San Jose. CA 96125-1014 4M 92%948(phone) 408925-1193(facsimile)
November 23,1994 MFN No.149-94 Docket STN 524)04 ,
Document Control Desk U. S. Nuclear Regulatory Commission Washington DC 20555 Attention: Paul A. Ilochnert Advisory Committee on Reactor Safeguards (ACRS)
Subject:
Response to Open Items from the August 24,1994, ACRS
" Subcommittee Meeting on Thermal Hydraulie Phenomena"
References:
- 1. Omcial Transcript of Proceedings, Wednesday, August 24,1994, Ann Riley & Associates, Ltd.
The enclosure to this letter contains responses to open items from the referenced ACRS Subcommittee meeting.
Sincerely,
. l' ffi&P%
J. E. Leatherman, Acting Manager Advanced Plant Technologies
Enclosures:
Responses to Open items from the August 24,1994 ACRS Thermal Hydraulic Subcommittee Meeting.
cc: W. R, llorchardt (NRC)
R. W. Hasselberg (NRC)
M. Malloy (NRC) 290035 1 9411300178 941123 Oh PDR ADOCK 05200004 1 A PDR !
Attachment to MFN No.149-94 ,
SBWR OPEN ITEMS FROM TRANSCRIPT OF TIIE ACRS TIIERMOIIYDRAULIC SUBCOMMITTEE MEETING AUGUST 24,1994 i
Open Item 11/1 Provide a list of members of the external technology review committee.
GE Response 11/1 Members of External Review Team:
Name Affiliation Trevor Cook, Chair DOE Richard Camp (UESC) DOE Thomas Miller (UESC) DOE Carter Savage (JUPITER) DOE S. Levy (SLI) EPRI R.Ilurke EPRI R. T. Fernandez EPRI W. Layman EPRI M. Merilo EPRI P. Coddington PSI G. E. Dix GE S. S. Dua GE Open Item 62,63,64 Will there be PANDA tests simulating Vacuum Breakers malfunction?
GE Response 62,63,64 Tests of vacuum breaker leakage in excess of tech spec limits have been included in PANDA (See NEDO-32391, TAPD Appendix A, Test M8).
1 Open Item 73,74 Where has GE addressed the PANDA test initial l conditions, that is beginning with the transient already l underway (" catch it on the fly")? I GE Response 73,74 This issue was addressed in the GE response to RAI 900.74 transmitted to NRC by MFN No.113-94, dated September 26, 1994.
~ < _
Open Item 76/5 Clarify whether or not noncondensibles will be injected into the drywell during the PANDA tests. ,
l GE Response 76/5 -Noncondensibles will not be injected into the drywell during the PANDA tests. ]
j l
Open Item 85/16 How can ACRS review the AllWR one-sixth scale boron mixing test report? !
l GE Response 85/16 The AllWR one-sixth scale boron mixing test report is available for resiew at GE.
Open Item 121/4 Provide your plans for taking samples and determining nitrogen concentrations to confirm mixing and nitrogen feed to the PCC at PANDA.
GE Response 121/4 Oxygen sensors have been added to the PANDA test facility to measure noncondensible fraction in the drywell near the PCC inlets.
Open Item 145/14 Explain why calibration tests were not performed for heat loss for the GIST Test Facility.
GE Response 145/14 Heat loss tests were not formally conducted for GIST because the effect of the heat loss on the system performance was expected to be negligible. This was con 6rmed with TRACG sensitivity studies by varying the heat losses from one half to double the expected values.
Heat losses were approximated from test data by analysis of the heat required to maintain constant conditions prior to test initiation. The results from that analysis agreed well with the TRACG calculated results and were reported in Section 2.4 of" Response to NRC Findings on GIST *,
submitted by h1FN No. 235-93 on December 16,1993.
Open item 151/8,18 Where has GE provided a study scaling the momentum equation?
GE Response 151/8,18 Scaling of the momentum equation was provided in response to RAI 900.69 in AIFN 113.94 dated 9/26/94.
Open item 163/13 Ilow can ACRS review the SIlWR(AllWR) loads definition document analogous to those GE did for Alks I, II, and 111 containments?
2 l
. a \
GE Response 163/13 The SBWR(ABWR) Loads Definition report is available for
. review at GE in San Jose.
Open Item 165,166 Provide the details of the RWCU isolation valves, the analysis that shows that these valves will close against the full flow if the RWCU line ruptures, and the analysis showing that the room (s) in which the RWCU break could occur can accommodate the pressure buildup. Provide analysis that shows that the issue (s) raised by the ACRS for the ABWR regarding loads on structures (redesigned walls / doors and/or equipment qualification in the case of ABWR) due to a RWCU line break has/have been resolved for SBWR. ,
GE Response 165,166 Analyses for the postulated rupture of the 8 inch pipe in the non-safety-grade portion of the RWCU system housed inside the secondary containment will be performed i following the restart of the SBWR Design Review.
These analyses will include:
- PRA evaluations
- Subcompartment pressurization evaluations
- Determination of Environmental qualification requirements for Emergency Core Cooling System equipment and instrumentation 4
- RWCU line isolation valve analysis for pressure loads due to a RWCU line break outside the primary containment.
Open item 170/25 Where has GE provided a report summarizing past operating experience with ICs, particularly those pertaining to waterhammer during startup and/or operation?
GE Response 170/25 A summary of past operating experience with ICs is contained in the response to RAI 440.6, transmitted to the NRC by MFN 089-94, dated 8/2/94.
l l
e Some additional water hammer incidents are listed below.
At Millstone l'on 3/11/78 the isolation system was damaged by a water hammer caused by " water entrainment in steam lines". Reference NUREG-05821979, Water Hammer in Nuclear Power Plants".
At Oyster Creek on 12/11/71 an 1C pipe failed due to water hammer. Reference.
" Water Hammers in BWRs" Bush S. H., December 1981, Battelle, Pacific Northwest Laboratory.
At Nine Mile Point 1 water hammer occurred on 10/12/69. No damage was sustained but a check valve was removed.
At Millstone 1 water hammer occurred on 2/12/76 and the condenser was damaged.
Repair was required.
At Millstone 1 water hammer occurred on 3/11/78 and " sway arrestors" were added..
At Millstone I water hammer occurred on 12/19/79, but no damage was sustained.
At Oyster Creek water hammer occurred on 12/11/71 with attendant vent line failure.
The vent line was repaired.
Reference EPRI NP-6766 Volume 1 July 1992, " Water Hammer Prevention, Mitigation, and Accommodation" Nine Mile Point 'I and Tsuruga experienced " severe" water hammers due to failure to drain steam supply lines. Addition of drain lines eliminated the problem.
Of the instances of water hammer identified in the isolation condenser system, the last documented event occurred in 1979, so apparently the problem has been solved by correct pipe drainage.
Open item 174/20 Provide copics of the two heat transfer test reports, one by UC and the other by Bill Usry (GE).
GE Response 174/20 Copies of the heat transfer test report " Single Tube Condensation Test Program" were transmitted to NRC by MFN No. 023-94 on March 2,1994 and a copy of this report is enclosed. A copy of the second report was sent to NRC and ACRS by MFN No.105-94 on September 6,1994.