June 15, 1982 Docket No. 50-155 00-82-05 LS05-82-06-051 Hs. Christa-Maria Route 2, Box 108C Charlevoix, Michigan
Dear Ms. Christa-Maria:
This letter responds to the petition you sent in the fom of a !!ailgram on April 6,1982 to the Commissioners, in which you requested to " intervene" in the startup of the Big Rock Point Plant until the " reactor core can be safely offloaded in the event of an emergency..." Your petition has been treated under 10 CFR Section 2.206 of the Commission's regulations.
It was referred to the flRC Staff for disposition on April 12, 1982.
On April 10, 1982, prior to the staff's receipt c.f your petition, the Big Rock Point facility started up after the 1982 refueling outage. Your petition, which implicitly requested immediate action to prevent the startup, was consequently treated as a request to suspend continued plant operation. For the reasons stated in the enclosed decision, I decline to take action on your regyest.
A copy of this determination will be placed in the Commission's Public Document Roon at 1717 H Street, fl. W., Washington, D. C. 20555 and at the Local Public Document Room located at 107 Clinton Street, Charlevoix, Itichigan 49720.
The decision will also be filed with the Secretary of the Commission for its review in accordance with 10 CFR 2.206(c) of the Commission's regulations.
As provided for by this regulation, the decision will constitute the final action of the Commission twenty-five (25) days after the date of issuance of the decision unless the Commission, on its own notion, institutes a review of the decision within that tine, 8206230150 820615 omer)
PDR ADOCK 05000155 G
PDR svanwe)
DATEf Nsc rosu ais uo so uo240 OFFICIAL RECORD COPY
$d*',*-a2n2.
y tis. Christa-!* aria June 15, 1982 A copy of the Notice of Issuance of the Director's Decision, which is beino filed with the Office of the Federal Register for publication, is also enclosed.
Sincerely, 3 Sqd 61
, !.4. P Dentaa Harold R. Denton, Director Office of Nuclear Reactor Regulation
Enclosures:
1.
Director's Decision w/ license Anendment No. 52 dated April 2, 1982 2.
Hotice of Issuance NRR}/pIR HDeM n g / /82 7
l
- SEEPREVIOUSTISSUEFORC0gCURRENCEI UU b (i P (V (f
/
- l l,-..gf#..DLSDIP/
NRR':
LiORBE5},OELD DL: AD/ A*
omcts suaswo HSE.i.th.:.gg.,
..REmch,.
DCrutchfieldl,DFredland GLainas
,{p_Eitenhut..ECate /,,
,l, hd /82... p.Lh,82 d
5/.1./82 5/28/82 6/2/82 2
ome)
.. /..../ 8 2..
. 5/2.1,/82 NROFORM 313 (10 30) NRCM e:4J OFFICIAL RECORD COPY owa mi-m u l
l
q{
/
[
s fis. Christa-Pfaric Several options would exist to provide full core off-load capability. First, additional racks could be installed in the pool. Second, spent fuel could be shipped to storage facilities operated by General Electric or the Department of Energy. Third, spent fuel could be stored on-site in approved shipping casks.
For the reasons discussed above, I decline to take any immediate action to effect a shutdown of the Big Rock Plant.
Final action on your petition will be taken in a reasonable time. Enclosed for your information is a copy of the notice which is being filed for publication at the Office of the Federal Register.
Sincerely, f 4wl renM by
';!. It Omtm liarold P..
Denton, Director Office of Nuclear Reactor Regulation
Enclosures:
1.
License Amendment flo. 52, dtd. April 2, 1982 2.
Notice cc w/cy of Petition and enclosures:
See next page NRR: DIR llDenton
/ /82
- SEE PREVIOUS TISSUE FOR CONCURRENCE 4)
. 0k h.3[.
"'c'>.DL R..fj,.
..DL;. 0,RB. D*
. D.L:.. DRS. J.5*
.0L
/SA.
. 0L:..DIR...
.NR R :.. D/DIR...
'"""^*'>.U.Sd b.;.cc..
.REmch.
.DCrutchf.ield
.GLiin as..
. 0E i.s enhut..
.ECase.....
" ^ " > fua2..
./..../a 2.
../... a z.
Caha2...
.f./.M82.
.../..../8 z....
../..../8 2...
Nac ronu n oomoi sucu e24o OFFICIAL RECORD COPY
-azu2.
1 k
d.
y,.
u, g
([
w e-fis. Christa-flaria Several options would exist to provide full core off-load capability. First, additional racks could be installed in the pool. Second, spent fuel could be shipped to storage facilities operated by General Electric or the Department of Energy. Third, spent fuel could be stored on-site in approved shipping casks.
For the reasons discussed above, I conclude that full core off-load capability does not have to be provided in the Big Rock Point spent fuel pool to operate the plant in a safe manner. And therefore, I decline to take any action to effect a shutdown of the Big Rock Plant.
Enclosed for your infomation is a copy of the notice which is being filed for publication at the Office of the Federal Register.
Sincerely, onge syned b3 H. R. Dentoa j w
Harold R. Denton, Director Office of Nuclear Reactor Regulation
Enclosures:
1.
License Amendnent flo. 52, dtd. April 2, 1982 2.
Notice cc w/cy of Petition and enclosures:
See next page NRR: DIR HDenton
/ /82
""">. R L. 0 N.5...0.L:. 0RB. 8 5 0 ELD, D
- 5,
.DL,; AD/,SA DL: DIR,
NRR: D/DIR,
" " " ^ * ' >. H.ai c.
.REnch.
[
.Q C..... h f.i.c ld..QLa,i.n.a s.,
,D,E i sen hu t.
, E G a s.e,,,,,,,,,, '
^ " > J,.[ /82
[/.g.../.82
/. /82
(/ S 82
/ /82
/ /82
/ /82 we owu m nofo,nucyc 'o OFFICIAL RECORD COPY
+ = =-m m
l I
9
- r'"
E 4 3
e i s w
N 3
c g
=
D k
5 O
ho N
3 3
+-
O
.$ :q]
g g al
- 3 4-u g
o d3 o
e c.
e e
- x, I
B(Im
$ 3 g.-
?
E O $jE
$ k O
.o.
Q e
3
+J
- E3 o
7 O
A T
}
o s
ac u i; y
Q h
J i
5 S
8 5
e<
N u
g N
m
=
W
+
a g
C
~d u
c 8
s a
5 E
2 5
o I
O i
U u
W C
m 7
C u
U k }
h 8.
5
-- 0 I
[0 b
$ S Cg m
M O
o m
g n g,
k, k
(
d (
y)
+'
E S.I d.,e *.
c o e g
3 O o g
o.
.J <
"J J L-3 C
W E
ag a
_ar E.
V 0
?
8 l )g J w
m u A "g* 2 ga 5
u o 2
.g v
.g g e-3 i I
's j.! l 8i l
j 7
$u.
u u
=E m
a 38g[g A
i!
I' N
5 8
mu l
w-t e e
(500 e
li-t
___.-mx___.__.
_ ___,___ _ ____m%.; w a,uaage.,%.m._,,__
E.
I s'
FROM.
ACTION CONTROL DATES CONTROL NO
-l Christa-Ma Ma COMPtoEAouNE 4-30-82
-11758 5
Joann. Bier ~
ACKNOWLE DG MEN T DATE OF DOCUMENT h,p INTERIM REPLY 4,g y 10:
PREPARE FOR SIGNATURE s
Commissioners FINAL 84EPLY CHAIRMAN FILE LOCATION O EXECUTIVE DIRECTOR Denton OTHER:
DESCRIPTION O LETTER OMcMO O REPORT C OTHER SPECI AL INSTRUCTIONS OR REMARKS 2.206 Request to intervene in the startup of Big Rock Point Handle as 2.206 per 0GC.
CLASSIFf ED DATA DOCUMENT / COPY NO.
CLAS$1FICATIONl NUMOER OF PAGES CATEGORY SECY-82-0391 POSTAL REGIST RY NO.
O NSI O no O FRD ASSIGN ED TO:
DATE INFORMATION ROUTING LEG AL REVIEW U FINAL U COPY Cunningham, ELD 4-9-82 Denton/ Case ASSIGNED TO.
DATE NO LEGAL OBJECTIONS liisenhut 4/20/8T 1.
PPAS 5
Thompson O IDMIN 8. CORRES HR 0E h.
</ - 20 2
Ilanauer 6.
Check ext.
gg _AE
'/ -Z/
3.
Mattson 1,
Snyder COMMENTS NOTIFY:
3 4
4.
Vollmer ext.
l-JCAE NOTIFICATION RECOMMENDED:
U YES U NO j
) NRC F ORM 232 EXECUTIVE DIRECTOR FOR OPERATION 0 DO NOT REMOVE THIS COPY PRINCIPAL CORRESPONDENCE CONTROL