Forwards Response to Operational Readiness Review Phase Two Rept
ML20058C706
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 10/24/1990
From: Wallace E
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20058C708 List:
References
NUDOCS 9011050012
Download: ML20058C706 (2)


Text

- -

k,e [. I T,

\\e TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 374ol

+

l SN 157B Lookout Place 00T 241980 f

U.S. Nuclear Regulatory Commission-ATTN Document Control Desk Washington, D.C.

20555 i

Gentlemen:

"In the Matter of

)

Docket No.. 50-260 Tennessee Valley Authority

)

p

' BROWNS FERRY NUCLEAR PLANT (BFN) - UNIT 2 RESPONSE-T0 OPERATIONAL READINESS

'J REVIEW (ORR) PHASE TWO REPORT' i

Enclosed is.the response to ORR Phase Two Report as requested by NRC.

The ORR Phase Two Report was submitted to NRC on March 9, 1990.

If there are any questions please telephone Patrick P. Carler at (205) 729-3566.

Very truly yours,-

4 TENNESSEE VALLEY AUTHORITY t

,E.G.Wallace, Manager a

Nuclear Licensing and-Regulatory Affairs

Enclosures

-cc: See page 2 i

'l 1

~ 5 S. k~'

vw k

i

'I 9011050012 901024 k

ADOCK0500g/gG t

PDR P

An Equal Opportunity Employer

I

' ij e,.

U.S. Nuclear Regulatory Commission 00'T 241990 l

ec (Enclosures):

Ms..S. C. Black, Deputy Director Project Directorate II-4 U.S. Nuclear Regulatory Commission One White Flint, North 1

11555 Rockville Pike, Rockville, Maryland 20852 m

NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens Alabama 35609-2000 Mr. Thierry_M. Ross, Project Manager U. S. Nuclear Regulatory Commission One. White Flint, North 11555 Rockville Pike

.Rockville, Maryland 20852 Mr. B. A. Wilson Project Chief l

U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900-Atlanta,' Georgia 30323 i