Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Quality Verification Program,Vol 1:Overview Rept, Jul-Sept 1983". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20205D927  + (Forwards Qualifications of NUS PSC Personnel Directly Involved by Mgt Responsibilities or by Actual Operations Performance for Desludging/Solidification Process for Old Source Storage Pool.Procedure Encl)
  • ML20084M380  + (Forwards Quality Action Request RH-00028-ZZ Re Zack Co Welding Procedures.Certification of Welders to Aws D1.3-78 Indefensible Position for Qualifying to D9.1-80 Welding Procedure Spec)
  • ML20083H983  + (Forwards Quality Action Request RS-00106 Generated by QA Dept to Track Quail Program Deficiencies Identified in NIR-012)
  • ML20080C736  + (Forwards Quality Action Request RT-00026 to Provide Tracking in Mpqad Quail Sys Per Nonconformance Identification Rept 014)
  • ML20080T362  + (Forwards Quality Action Requests on Nirs 002-005,describing Actions Taken to Resolve Deficiencies,Per .Review Expected to Be Completed by 831216)
  • ML20147D396  + (Forwards Quality Assurance Prog for Industrial Radiography Lic,Designed to Cover Shipment of Model 650 Source Changers)
  • ML20148N322  + (Forwards Quality Assurance Prog for Packaging of Radioactive Matls for Transport as Req by 10CFR71.51.W/att Co Organizational Chart)
  • ML20147F741  + (Forwards Quality Assurance Program to Comply W/Append E of Part 71)
  • ML20004G128  + (Forwards Quality Classification List,In Response to NRC .List Includes All Items Affecting Safety & Is Properly Referenced in Revised Recovery QA Plan)
  • ML20024A454  + (Forwards Quality Confirmation Program Monthly Status Rept & Summary Sheet for Apr 1983,in Response to)
  • ML20069E639  + (Forwards Quality Confirmation Program Status, Monthly Rept for Feb 1983,per NRC)
  • ML20076J212  + (Forwards Quality Confirmation Program Status as of 830531 & Quality Confirmation Program Status as of 830630)
  • ML20072C631  + (Forwards Quality Confirmation Program Status,Jan 1983)
  • ML20076J799  + (Forwards Quality Confirmation Program Task Descriptions Re Masonry Wall Const,Seismic Columns,Bolting & Coatings,Per Util .Details of Seismic Clearance Walkdowns Under Study)
  • ML20079E240  + (Forwards Quality Confirmation Program, Monthly Rept for Dec 1983,per Rf Warnick)
  • ML20082K524  + (Forwards Quality Confirmation Program, Monthly Rept for Oct 1983)
  • ML20070R908  + (Forwards Quality Confirmation Program,Status as of 821231, for Review)
  • ML20031E434  + (Forwards Quality Plan for Type B Containers,For Approval)
  • ML20062G000  + (Forwards Quality Plan for Underpinning Activities & Quality Plan for Remedial Soils Activities & Soils-Related Work in Quality Areas)
  • ML18066A910  + (Forwards Quality Program Description for Operational Npps, Rev 17)
  • ML18066A911  + (Forwards Quality Program Description for Operational Npps, Rev 17)
  • B14561, Forwards Quality Svcs Dept Audit Rept A30213, MOV Program Assessment,Millstone Station, Per GL 89-10.Independent self-assessment Performed on MOV Program Identified Numerous Strengths & Weaknesses  + (Forwards Quality Svcs Dept Audit Rept A30213, MOV Program Assessment,Millstone Station, Per GL 89-10.Independent self-assessment Performed on MOV Program Identified Numerous Strengths & Weaknesses)
  • ML20209G872  + (Forwards Quality Technology Co Investigative Repts QI-84-057 & QI-84-057-1,per Region IV Request)
  • ML20154Q983  + (Forwards Quality Verification Function Insp Rept 50-382/88-200 on 880201-12.Weaknesses Noted.Util Staff Inadequate in Preventing Recurrence or Occurence of Certain Problems.List of Potential Enforcement Findings Encl)
  • ML17277A853  + (Forwards Quality Verification Program,Vol 1:Overview Rept, Jul-Sept 1983.)
  • ML20054C868  + (Forwards Quantitative Fire Hazard Analysis Re 10CFR50,App R, Fire Protection Rule for Operating Plants)
  • ML20215B156  + (Forwards Quantitative Info Requested by NRC to Confirm Trends Noted in Cycle 10 Break Spectrum Analysis Results. Parameters Used in Selection Criteria for Data Used to Determine Appropriate Break Spectra Matrix Listed)
  • ML20138L151  + (Forwards Quantitative Piping Experience Data Supporting Results of Millstone III Seismic Interaction Study, in Response to Request for Addl Info Re Use of Historical Earthquake Data in Evaluation of non-seismic Piping Sys)
  • B11811, Forwards Quantitative Piping Experience Data Supporting Results of Millstone III Seismic Interaction Study, in Response to Request for Addl Info Re Use of Historical Earthquake Data in Evaluation of non-seismic Piping Sys  + (Forwards Quantitative Piping Experience Data Supporting Results of Millstone III Seismic Interaction Study, in Response to Request for Addl Info Re Use of Historical Earthquake Data in Evaluation of non-seismic Piping Sys)
  • ML19256F625  + (Forwards Quantitative Repts Re Effects of Fire Water Piping Rupture on safety-related Equipment.Description of Water Curtain for Fire Areas 6 & 20 & Drawings Encl.Drawings Available in Central Files Only)
  • ML20202J737  + (Forwards Quartely Rept for Transfer of Devices & Sources to Generally Licensed Persons for Period of Jan - March 1997)
  • ML20198L527  + (Forwards Quarter Rept for Period Indicated Which Details All Transfers of Devices Containing Radioactive Matl, Manufactured & Distributed Pursuant to Code of Maryland Regulations 26.12.01.01 & to NRC Jursidiction)
  • ML20137G952  + (Forwards Quarterly 10CFR50.59 Rept for Period 961201-970228 Re Changes,Tests & Experiments for Fort St Vrain Decommissioning)
  • ML20101F807  + (Forwards Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments Affecting Decommissioning of Plant,Covering Period of 951116-960215)
  • ML20065B743  + (Forwards Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments Affecting Decommissioning of Fsv.Rept Covers Period of 931116-940215)
  • ML20073B359  + (Forwards Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments Affecting Decommissioning of Plant,Covering Period of 940516-0817)
  • ML20081E932  + (Forwards Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments for Fsv Decommissioning for Period 941116- 950215,per Condition (b)(2) of NRC 921123 Order Approving Decommissioning Plan & Authorizing Decommissioning of Fsv)
  • ML20132F284  + (Forwards Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments Affecting Decommissioning of Plant,Covering Period of 960901-1130)
  • ML20198G319  + (Forwards Quarterly AM-241 Matl Transfer Repts for Second Quarter of 1994.Devices Used in Gamma Gauges & Distributed Under 10CFR32.52,under State of CA General License 3823-43GL)
  • HL-4652, Forwards Quarterly Amend to FSAR Rev 12D & FHA Rev 9D for Plant Hatch Units 1 & 2  + (Forwards Quarterly Amend to FSAR Rev 12D & FHA Rev 9D for Plant Hatch Units 1 & 2)
  • HL-4558, Forwards Quarterly Amend to Fsar,Rev 12C & Fire Hazards Analysis & Fire Protection Program,Rev 9C  + (Forwards Quarterly Amend to Fsar,Rev 12C & Fire Hazards Analysis & Fire Protection Program,Rev 9C)
  • HL-4398, Forwards Quarterly Amends 12A to FSAR & 9A to Fire Hazards Analysis & Fire Protection Program for Units 1 & 2  + (Forwards Quarterly Amends 12A to FSAR & 9A to Fire Hazards Analysis & Fire Protection Program for Units 1 & 2)
  • ML20216F099  + (Forwards Quarterly Aquatic Toxicity Monitoring Rept for Jul 1997 for Millstone Station, Discharge Serial Numbers 001A,001B,001C & 006.All Test Acceptable Except for Dsn 001A)
  • ML19339A761  + (Forwards Quarterly Cash Flow Statement Schedule Re Applicant Guarantee of Retrospective Premiums for 1977)
  • ML20217A870  + (Forwards Quarterly Compliance Plan Rept for 971201-980228. Info Re Compliance Plan Issues A.1 Through A.5 for Ports & A.1 Through A.7 for Pgdp Considered to Be Proprietary & Exempt from Public Disclosure,Per 10CFR2.790)
  • ML18017B431  + (Forwards Quarterly Data Rept Shearon Harris Power Plant Seismic Monitoring Program for Apr-June 1980.)
  • ML18017B263  + (Forwards Quarterly Data Rept Shearon Harris Nuclear Power Plant Seismic Monitoring Program,Jul-Sept 1980.)
  • ML18017B430  + (Forwards Quarterly Data Rept Shearon Harris Power Plant Seismic Monitoring Program for Apr-June 1980)
  • ML18017B262  + (Forwards Quarterly Data Rept Shearon Harris Nuclear Power Plant Seismic Monitoring Program,Jul-Sept 1980)
  • ML18017B059  + (Forwards Quarterly Data Rept for 800101-0331 Re Seismic Monitoring Program)