ML18017B059
| ML18017B059 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 04/30/1980 |
| From: | Mcduffie M CAROLINA POWER & LIGHT CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8005070434 | |
| Download: ML18017B059 (6) | |
Text
0
~
REGULATORY INFORMATION DISTRIBUTION 'SYSTEM (RIDS)
ACCESSION NBR'8005070434 DOC ~ DATE! 80/04/30 NOTARIZED; NO
'OCKET FACIL:50 400 Shearon Harris Nuclear Power Planti Unit ii Carolina 05000400 50 401 Shear on Harris-Nuclear Power Planti Unit 2i Carolina 05000401 50-402 Shear on Harris Nuclear Power Plant< Unit 3i Carolina 05000402 AUTH,NAME AUTHOR AFFILIATION pe MCDUFFIK<M,A, Carolina Power L Light Co.
RKCIP NAME, RECIPIENT AFFILIATION DENTONiH.R.
Office of Nuclear Reactor Regulation
SUBJECT:
Forwards quarterly data rept for 800101 0331 re seismic monitoring program, DISTRIBUTION CODE:
BOOIS COPIES RECEIVED ILTR l ENCL g SIZE I TITLE: PSAR/FSAR AHDTS and Related Correspondence N
LS PC ~+ W~WH%ee%&SpWA&'N~&%&&tWN~W~~WAOW&%~&'WWW%'Wtli1%~W'%++WOH%%+~O+~I+%~
RECIPIENT COPIES ID CODE/NAME LTTR ENCL ACTION:
05 PM NIP~C 1
1 BC ECdg Q 1'
RECIPIENT IO COOK/NAME AO LCcJQ I.A CMg g COP IKS LTTR ENCL 1
0 1
0 INTERNAL!
06 I EE 09 GEOSC IEN BR 11 MECH KNG BR 13 MATL KNG BR 16 ANALYSIS BR 18 AUX SYS BR 20 I.8 C
SYS BR 22 AO SITE TECH 27 EFFL TRT SYS 29 KIRKWOOO AD PLANT SYS AD SITE ANLYSIS HYDRO~METEOR BR OELD 1
1 3
3 1.
1' 2
1 1
1 1
1 1
1 0
1 1
1 1
0 1
0 2
2 1
0 02 NRC POR 08 OPERA LIC BR 10 QAB 12 STRUC ENG BR 15 RKAC SYS BR 17 CORE PERF BR 19 CONTAIN SYS 21 POWER SYS BR 26 ACCONT ANLYS 28 RAD ASMT BR AD FOR ENG AD REAC SAFETY DIRECTOR NRR MPA 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 0
1 0
1 0
1 0
EXTERNALS 03 LPOR 30 ACRS 1
1 10 10 04 NSIC 1
1 Ngy g)
TOTAL NUMBER OF COPIES REQUIRED!
LTTR 52 ENCL 41
e
~,f A,
1 f R
1 f
(
'l I(
N
'I Y
f
Carolina Power tt Light Company
".April 30',
1980 Mr. Harold'R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D. C.
20555 SHEARON HARRIS NUCLEAR POWER PLANT,'NIT NOS. 1, 2, 3, AND 4 DOCKET NOS. 50-400, 50-401; 50-402, AND 50-403 SEISMIC MONITORING PROGRAM
Dear Mr. Denton:
Carolina Power
& Light Company is hereby providing by attachment the fifth quarterly report of the Shearon Harris Nuclear Power Plant (SHNPP)
Seismic Monitoring Program.
This report includes data covering the period January 1, 1980 through March 31, 1980.
Yours very truly, SDF/tl Attachment M. A. McDuffie Senior Vice President Engineering 6 Construction 411 Fayetteville Street o P. O. Box 1551 o Raleigh, N. C. 27602
t:
Quarterly Data Report SHNPP Seismic Monitoring Program Januar 1
1980-March 31 1980 Carolina Power 6 Light Company has completed another quarter of operation of its seismic monitoring program at the Shearon Harris Nuclear Power Plant site near New Hill, North Carolina.
During this period a total of 187 cultural events were recorded with an S-P of less than 5 seconds.
No local earthquakes were detected.
Of these 187 events, 162 were confirmed as being explosions by the respon-sible companies ox agencies.
The remaining 25 events displayed the signature and arxival p'attern typical of previously identified cultural events and none occurred at night or on weekends.
1
\\
Q g
V' ag ~
I
~ l r A