Text
g6 j 'c.
7FRitRIPAMTAFF i
j ag WOPPP l D/RA DE s/RA N SP ORMA f33
?AO SCS d
-N d
90CUMENTATION TRANSMITTAL
,33 p ga s
To:
Stone & Webster - CIO Transmittal No: CIO-do 3 7 PO Box 1963 Date: 77) g,f99g.
Midland, MI 48640 Attention: QQ%
9 The documentation lis ed below is provided herewith, 7.
as previously provided on 8 8
- as reqE sted by
( he/
Documentation
Description:
O m fy (Can.)
RH-ooo29-2z.
CIO' has _ has not been placed on routine transmittal for the described documentation.
/
7" natttte CC RJCook, NRC Site (w/a, unless voluminous)
JJHarrison, NRC Region _III (w/a, unless voluminous)
DDJohnson, SMO (w/o)
JGKappler, '.NRC ' Region ' IIII(w/a, ' unles s voluminous)
BHPeck, SMO (w/o)
NIReichel,. SMO (w/o)
RAWells, MPQAD (w/o)
M 9
dl CMThompson - File 24.2 (w/a, unless voluminous) 3 8405150345 840508 I(
MIO384-0001A-QLO6 PDR ADOCK 05000329 S
_ ' ' p..p. _ -l
..;..__.7',y,,.
g..y y s :p.. -; -: >.,,, 1 :,_
.,a~
1 e._
.+_s
....,,,.. _,, ;.,. ;,. :,~. -y _
_~.-
se.
'?
O PM fM M M I
j [T -[ e '
1
- 6. QAR Number d
MIDLAND PROJEC
. i RH-00028-ZZ 1
m Consumers QUALITY ASSURANCE DEPARTMENT
- 7. Date issued
- 8. Revisi L
Power 4/24/84 o
CompBRY QUALITY ACTION REQUEST 9.
g j
p g, ot
- 1. Requirement Bechtel Specification 7220-M-151A(0) R,ev 18 Sec 14.9.2 states...
- 1. AWE Related
'{
"Each procedure must be prepared and qualified in accordance with the b Yes No requirements of the Code and this specification." Bechtel Specification 7220-M-151A(0) Rev 18 Sec 14.9.4 = tate:
"L' elders shall be given performance test in accordance with the applicable code."
itFORMMiua unu
- 2. Deficiency ContrarytotheaboverequirementsZack'sweldingprocedareswererevisedtoreflecttherequirement(
AVS 09.1-80. Although these WPS's are now AWS 09.1-80 procedures, Zack is continuing to qualify welders in l
accordance with the requirements of AWS 01.3-78. Additionally the'PORs which support these WPS's were qualifiel the requirements of AWS D1.3-78.
4
- 11. Potential 50.55(e)
Yes No
. QAQ Ori at by
- 4. Discipline / Division /Section
- 5. Response Due Date
- 12. Date Reported to MPQA g
MPQAD HVACA 4/27/84 n N/A l'f ActioniteMo.'
- 15. Item Priority
- 17. S/U Code
- 19. Action Organization R R'eviewed by ZO1000 1
PGM00
- 14. Discipline
- 16. Trend Code
- 18. Resb Code
/1 ste j
M ZZ-50001 Zack The Zack Company M--8h
- 22. Cause The Zack Company welding procedures and
- 23. Proposed Corrective Action
.}
walders are certified in compliance with the rules Welders certified in accordance with C t
of AWS Dl.3-78.
Bechtel recommended that Zack Dl.3-78 prior to May 15, 1984 are quaB change their welding procedure specifications, fied to weld in accordance with the utilizing existing Dl.3-78 procedure qualification rules of AWS D9.1-80.
Welders whose j
rccords, to meet the requirements of AWS D9.1 (see certification begins May 15, 1984 wil3 j
B chtel ltr. #M-151-B-3140 dated 11/21/83). These certify in accordance with the rules e changeswerepreviouslyagreeduponandthenjgggg%SD9.1-80.
g approved by Zack, MPQAD HVACA Ouslity En,iueering e
l and Bechtel. - Diccucci=: xith '."0;c ""fr? Omity 42# 4 8C-W
'l
- 24. Responsible Organization / Person Wor Linue on neXL pa
'25. Proposed Completion Date
- 26. Disposition so-8y Sn5/84 Zack Co. S.M J mithi Q@Siewer T
/ 4Da te'
.PQAE (ASME Only)
Date
- 27. Disposition Ac@en
- 28. Method of Disposition Verification
- 29. QAR Closed by MPQAD Date E OnM Date Acceptable Unacceptable Superceding QAR
n -
QAA NO RH-00028-ZZ MIDuMD PWEr.T
. Am AssuRAnct otraniment
, QUALITY. ACTION REQUEST DATE:
REn C ONTINU ATION - S HEET 0
PAGE R OF M 22.
Cause (Continued)
MPQAD HVACA has'now determined'the'ccrtification of welders to AWS Dl.3578 was not,a'~ defensible pos'ition for qualifying to a '
~ '
D9.1-80 welding proc.edure specification.
MPQAD's position is that welders must.q'ualify to'the specification, (code), for which the
'weldir.s procedure specification is written.
l
?
INfGnu,-
i maiigwegjy E
?
-