Forwards Quality Verification Program,Vol 1:Overview Rept, Jul-Sept 1983
ML17277A852
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/21/1983
From: Carlisle C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML17277A853 List:
References
GO2-83-0850, GO2-83-850, NUDOCS 8309300192
Download: ML17277A852 (4)


Text

Washington Public Power Supply System 3000 George Washington Way P.O. Box 968 Richiand, Washington 99352-0968 (509)372-5000 Docket Number 50-397 G02-83-0850 Septeober 21, 1983 RespoaXs to: N/A Response r~ed by: N/A IE FILE COPY,l Mr. J. B. Martin, Regional Administrator Nuclear Regulatory Camnission Region V 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Subject.

Reference:

SUPPLY SYSTEM NUCXZAR PRM1:CT NO.

2 SIZlt~TH PROGRESS REPORT 10CFR50. 54 (f) a)

GO2-80-153, NO Strand to USNRC, "WPPSS Nuclear Project No.

2 Docket No. 50-397, EA.-80-20, Notice of Violation and Additional Infoxmation-10CFR50.54(f)," dated July 17, 1980 b)

GI2-83-188, DM Sternberg to CS Carlisleg NRC Inspection" during June, 1983, of Activities urder CPPR-93, dated August 18, 1983.

This is the sixteenth Progress Report on the actions we have taken in re-gard to our caanitments in Reference a), and covers the activities of our Quality Verification Program (QVP) during the period of July through September, 1983.

At a meeting with NRC Region V representatives at WNP-2, recorded in Reference b), a number of new ~tments were made to respond to your questions.

The QVP developed a schedule for completing the newly ccm-mitted actions and preparing the Overview Report in early Septal~.

Those actions have been ccmpleted and reported, and the QVP Overview Report. is issued herewith.

The report provides a summary of all the acti-vities of the Program, frcm its inception through ccmpletion of the recently-added tasks of NDE verification, special prepurchase and in-active contracts review and inspection, and analysis of CAT team findings.

The past quarter year has been dedicated to accanplishing these tasks and preparing the reports.

8309300i92 83092i PDR ADOCK 05000397 R

ei PDR~"( [, ('

~g o'l )~

E l

I V

JB Martin Septenher 29., l983 Page 2

The Overview Report provides a descriptive sugary, conclusions, and over-all results of the Program.

All of the lower-level, detailed reports have been prepared and reviewed, but, not every one has been finally-approved and issued.

This work proceeds, along with preparation of the sumery task

reports, and vaulting of the Program records, and is ~ted to be com-pleted in another month.

No new information will be recorded in the sunmary task reports.

These are a collection of general information fran individual tasks (description, methodology, results) that is broadly sunaerized in the Overview Report.

We have ccmpleted the cxmnitments made in response to your 50.54(f) re-quest (Reference a), therefore, please consider the enclosure to be our final Progress Report. I am 'enclo'i'ng herewith six copies of the QVP Overview Report for your information and use.

Please contact me if you have any questions on this matter.

Program Director, WNP-2 CSC. BLK.eek

Enclosure:

QVP Ovexview Report cc:

WS Chin, BPA Richland, WA JA Porrest, BGR Richlard, WA PE Grady, BPA WNP-2 JB Knotts, Jr., Devevoise 6 Liberman, Washington, DC ND Lewis, EFSEC, Olympia, WA TA Mangelsdorf, Bechtel WNP-2 A Toth, NRC, Resident Xnspector, WNP-2 JJ Verderber, BSR, WoocUxuy, NY

~

~

~