Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Interim Annual Operating Rept for 1979". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20235D391  + (Forwards Interesting Item from Newspaper on Side Activities of Two Leaders of anti-Bodega Movement.Clip on Opening of San Onofre Hearing Also Encl)
  • LD-84-013, Forwards Interface Requirement Re Shutdown Cooling Analysis of Reactor Coolant Gas Vent Sys Per Sser 2.Confirmatory Item Closed  + (Forwards Interface Requirement Re Shutdown Cooling Analysis of Reactor Coolant Gas Vent Sys Per Sser 2.Confirmatory Item Closed)
  • LD-84-009, Forwards Interface Requirements Re Block Valves on Atmospheric Dump Valves to Close Out Confirmatory Item 2 of Sser 2 Re Steam Generator Tube Rupture Analysis  + (Forwards Interface Requirements Re Block Valves on Atmospheric Dump Valves to Close Out Confirmatory Item 2 of Sser 2 Re Steam Generator Tube Rupture Analysis)
  • ML19354D670  + (Forwards Interfacing Sys LOCA Insp Rept 50-346/89-201 on 891030-1109.Weakness in DHR Sys Design & Surveillance Deficiencies Noted.Areas of Human Factors & Performance Which Could Affect man-machine Interface Reviewed)
  • ML20059K865  + (Forwards Interfacing Sys LOCA Insp Rept 50-382/90-200 on 900730-0810.Deficiencies in Availability of Design Calculations,Check Valve Maint & Plant Equipment Labeling Noted)
  • ML20043F972  + (Forwards Interfacing Sys LOCA Insp Repts 50-413/90-200 & 50-414/90-200 on 900416-27.No Significant Deficiencies Identified)
  • ML17055C671  + (Forwards Interfacing Sys LOCA at Bwrs, Draft Ltr Rept for May 1986)
  • ML20203H545  + (Forwards Interfacing Sys LOCA at Bwrs,Tasks 1A & 2A, Draft BNL Rept.Rept Based on Info Contained in Fsar,License & Tech Specs & P&Ids & Will Be Used in Resolving Generic Issue 105, Intersystem LOCAs in Bwrs)
  • ML20212M838  + (Forwards Interfacing Sys LOCA at PWRs Tasks 1B & 2B, Draft Ltr Rept)
  • ML20215G245  + (Forwards Interfacing Sys LOCA at PWRs Tasks 2B & 3B, Draft Ltr Rept)
  • ML20210C429  + (Forwards Interfacing Sys LOCA at Pwrs,Tasks 1B & 2B, Draft Ltr Rept Re Generic Issue 105.Comments Requested within 3 Wks)
  • ML20084Q663  + (Forwards Intergranular Corrosion Cracking of Type 304 Stainless Steel in Water Cooled Reactors & Info Needed on Intergranular Corrosion Cracking. Documents Pertinent to Future Meeting on Intergranular Cracking of safe-end)
  • ML20140B419  + (Forwards Intergrated Materials Performance Evaluation Program Rept on Tennessee Agreement State Program.Response to Recommendations Requested)
  • ML19345C191  + (Forwards Interim 10CFR50.48 Suspending Completion Dates for Fire Protection Mods,Effective Upon 801029 Publication in 45FR71569.Rule Will Be Superseded by Revised Rule When Effective)
  • ML19345C181  + (Forwards Interim 10CFR50.48 Suspending Completion Dates for Fire Protection Mods,Effective Upon 801029 Publication in 45FR71569.Rule Will Be Superseded by Revised Rule When Effective)
  • ML19345C186  + (Forwards Interim 10CFR50.48 Suspending Completion Dates for Fire Protection Mods,Effective Upon 801029 Publication in 45FR71569.Rule Will Be Superseded by Revised Rule When Effective)
  • ML19345C145  + (Forwards Interim 10CFR50.48 Suspending Completion Dates for Fire Protection Mods,Effective Upon 801029 Publication in 45FR71569.Rule Will Be Superseded by Revised Rule When Effective)
  • ML20002B136  + (Forwards Interim 10CFR50.48,suspending Completion Date for Previously Approved Fire Protection Mods,Effective 801029. Rule Will Be Superseded by Pending Revision)
  • ML20002B138  + (Forwards Interim 10CFR50.48,suspending Completion Date for Previously Approved Fire Protection Mods,Effective 801029. Rule Will Be Superseded by Pending Revision)
  • ML20002B141  + (Forwards Interim 10CFR50.48,suspending Completion Date for Previously Approved Effective Fire Protection Mods,Effective 801029.Rule Will Be Superseded by Pending Revision)
  • ML20093N058  + (Forwards Interim 10CFR50.55(e) Rept Re QA Program & Mfg Deficiencies Affecting Radiation Monitoring Equipment Supplied by Victoreen,Inc)
  • ML13322B027  + (Forwards Interim Acceptance Criteria for Reactor Vessel Thermal Shield Monitoring Program Developed During First 7 Days of Operation at 85% Power Per Requirements of License Condition 3.M)
  • ML17252A659  + (Forwards Interim Actions to Be Taken by 810515 Re Review of Controls for Handling Heavy Loads Per 801222 & 810203 Requests.Approach Taken in NUREG-0612 to Minimize Likelihood of Heavy Load Drop Impacting Spent Fuel Too Broad)
  • ML16340B497  + (Forwards Interim Agreement on Criteria for Low Power Testing of New Commercial Nuclear Facilities.Fema/Nrc Steering Committee Considers Criteria Adequate & Can Serve as Interim Basis.Certificate of Svc Encl)
  • ML19345A556  + (Forwards Interim All Volatile Treatment Guidelines, Overall Direction All Volatile Treatment Guidelines & Steam Side Water Chemistry Control Specs in Response to NRC 800826 Request for Info)
  • ML17340B411  + (Forwards Interim Annual Operating Rept for 1979.)
  • ML20155B943  + (Forwards Interim Change I88-1 to Rev 11 to QA Program Plan, Including Shifts of Responsibility,Changes in Titles & New Organizational Structure)
  • NOC-AE-00005, Forwards Interim Change Notice 18-1 to STP Emergency Plan. W/Summary of Changes  + (Forwards Interim Change Notice 18-1 to STP Emergency Plan. W/Summary of Changes)
  • NOC-AE-000307, Forwards Interim Change Notice 18-2 to STP Emergency Plan. Changes Do Not Constitute Reduction in Effectiveness of Plan.Summary of Changes Also Encl  + (Forwards Interim Change Notice 18-2 to STP Emergency Plan. Changes Do Not Constitute Reduction in Effectiveness of Plan.Summary of Changes Also Encl)
  • TXX-9340, Forwards Interim Change Request ISI-1R2-005 to Rev 2 to Unit 1 ISI Plan  + (Forwards Interim Change Request ISI-1R2-005 to Rev 2 to Unit 1 ISI Plan)
  • ML20081F107  + (Forwards Interim Change Request ISI-1R3-02 to Rev 3 to Unit 1 ISI Plan)
  • TXX-9653, Forwards Interim Change Request ISI-1R4-001,which Updates Rev 4 of CPSES Unit 1 ISI Program Plan  + (Forwards Interim Change Request ISI-1R4-001,which Updates Rev 4 of CPSES Unit 1 ISI Program Plan)
  • ML20154C442  + (Forwards Interim Change Request ISI-1R5-001 to Unit 1 ISI Plan,Rev 5, Updating NRC Copy of Rev 5.Encl Does Not Contain Request for Relief from ASME Code Requirements)
  • ML20107F463  + (Forwards Interim Change Request ISI-2R0-006 of CPSES Unit 2 ISI Program Plan)
  • ML20069E508  + (Forwards Interim Change Request ISI-2RO-001 to Comanche Peak Ses Unit 2 ISI Program Plan)
  • ML20091K956  + (Forwards Interim Change Request ISI-IR3-003 to Rev 3 to Unit 1 ISI Plan)
  • ML20128B606  + (Forwards Interim Change Request PSI-RO-001 to Preservice Program Plan)
  • ML20128B608  + (Forwards Interim Change Request PSI-RO-001 to Preservice Program Plan.)
  • ML20091L910  + (Forwards Interim Change Requests ISI-RO-001 & 002 to Update Inservice Insp Program Plan)
  • ML19344D899  + (Forwards Interim Charter for Ofc of Analysis & Evaluation of Operational Data.Comments from Interfacing Ofcs Have Been Incorporated.Supporting Documentation Encl)
  • ML20093G906  + (Forwards Interim Closure Rept Re Compliance W/Proposed Upgrades to Reactor Vessel Water Level Measurement Sys Design.Rept Forms Basis for Resolving TMI Action Plan Item II.F.2.Final Rept Will Be Submitted by Late Oct 1984)
  • ML20100F105  + (Forwards Interim Comments on Final Draft Tech Specs.Review Will Be Completed by 841210)
  • ML16340C326  + (Forwards Interim Comments on Phase I of Util Reverification Program.Phase II Encl for Review.Comments Should Be Submitted by 820205)
  • ML19208A960  + (Forwards Interim Const Deficiency Rept 13 Re Reactor Containment Bldg Dome Concrete)
  • ML20211P859  + (Forwards Interim Contractor Rept on Probabilistic Safety Study.Comments on Assumptions,Interpretations & Analyses in Interim Rept Requested as Soon as Possible to Support mid- Aug 1986 Meeting to Discuss Preliminary Observations)
  • ML20011E962  + (Forwards Interim Control Rod Withdrawal Limits for Facility, Cycle 1,per Tech Spec 3.1.1.3,Action a.3)
  • ML19250C075  + (Forwards Interim Criteria Showing Compliance W/Provisions of EPA U Fuel Cycle std,40CFR190,in Response to NRC 790917 Request)
  • ML19250B935  + (Forwards Interim Criteria to Demonstrate Conformance W/Epa U Fuel Cycle Std (40CFR190) by 791201)
  • ML19250B968  + (Forwards Interim Criteria to Demonstrate Conformance w/40CFR190 EPA U Fuel Cycle Std.Individual Licensee Should Not Be Responsible for Releases from U Fuel Cycle Beyond Facility)
  • ML20151H951  + (Forwards Interim Ctr QA Manual & Comment Resolution Sheet)