Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235D391 + (Forwards Interesting Item from Newspaper on Side Activities of Two Leaders of anti-Bodega Movement.Clip on Opening of San Onofre Hearing Also Encl)
- LD-84-013, Forwards Interface Requirement Re Shutdown Cooling Analysis of Reactor Coolant Gas Vent Sys Per Sser 2.Confirmatory Item Closed + (Forwards Interface Requirement Re Shutdown Cooling Analysis of Reactor Coolant Gas Vent Sys Per Sser 2.Confirmatory Item Closed)
- LD-84-009, Forwards Interface Requirements Re Block Valves on Atmospheric Dump Valves to Close Out Confirmatory Item 2 of Sser 2 Re Steam Generator Tube Rupture Analysis + (Forwards Interface Requirements Re Block Valves on Atmospheric Dump Valves to Close Out Confirmatory Item 2 of Sser 2 Re Steam Generator Tube Rupture Analysis)
- ML19354D670 + (Forwards Interfacing Sys LOCA Insp Rept 50-346/89-201 on 891030-1109.Weakness in DHR Sys Design & Surveillance Deficiencies Noted.Areas of Human Factors & Performance Which Could Affect man-machine Interface Reviewed)
- ML20059K865 + (Forwards Interfacing Sys LOCA Insp Rept 50-382/90-200 on 900730-0810.Deficiencies in Availability of Design Calculations,Check Valve Maint & Plant Equipment Labeling Noted)
- ML20043F972 + (Forwards Interfacing Sys LOCA Insp Repts 50-413/90-200 & 50-414/90-200 on 900416-27.No Significant Deficiencies Identified)
- ML17055C671 + (Forwards Interfacing Sys LOCA at Bwrs, Draft Ltr Rept for May 1986)
- ML20203H545 + (Forwards Interfacing Sys LOCA at Bwrs,Tasks 1A & 2A, Draft BNL Rept.Rept Based on Info Contained in Fsar,License & Tech Specs & P&Ids & Will Be Used in Resolving Generic Issue 105, Intersystem LOCAs in Bwrs)
- ML20212M838 + (Forwards Interfacing Sys LOCA at PWRs Tasks 1B & 2B, Draft Ltr Rept)
- ML20215G245 + (Forwards Interfacing Sys LOCA at PWRs Tasks 2B & 3B, Draft Ltr Rept)
- ML20210C429 + (Forwards Interfacing Sys LOCA at Pwrs,Tasks 1B & 2B, Draft Ltr Rept Re Generic Issue 105.Comments Requested within 3 Wks)
- ML20084Q663 + (Forwards Intergranular Corrosion Cracking of Type 304 Stainless Steel in Water Cooled Reactors & Info Needed on Intergranular Corrosion Cracking. Documents Pertinent to Future Meeting on Intergranular Cracking of safe-end)
- ML20140B419 + (Forwards Intergrated Materials Performance Evaluation Program Rept on Tennessee Agreement State Program.Response to Recommendations Requested)
- ML19345C191 + (Forwards Interim 10CFR50.48 Suspending Completion Dates for Fire Protection Mods,Effective Upon 801029 Publication in 45FR71569.Rule Will Be Superseded by Revised Rule When Effective)
- ML19345C181 + (Forwards Interim 10CFR50.48 Suspending Completion Dates for Fire Protection Mods,Effective Upon 801029 Publication in 45FR71569.Rule Will Be Superseded by Revised Rule When Effective)
- ML19345C186 + (Forwards Interim 10CFR50.48 Suspending Completion Dates for Fire Protection Mods,Effective Upon 801029 Publication in 45FR71569.Rule Will Be Superseded by Revised Rule When Effective)
- ML19345C145 + (Forwards Interim 10CFR50.48 Suspending Completion Dates for Fire Protection Mods,Effective Upon 801029 Publication in 45FR71569.Rule Will Be Superseded by Revised Rule When Effective)
- ML20002B136 + (Forwards Interim 10CFR50.48,suspending Completion Date for Previously Approved Fire Protection Mods,Effective 801029. Rule Will Be Superseded by Pending Revision)
- ML20002B138 + (Forwards Interim 10CFR50.48,suspending Completion Date for Previously Approved Fire Protection Mods,Effective 801029. Rule Will Be Superseded by Pending Revision)
- ML20002B141 + (Forwards Interim 10CFR50.48,suspending Completion Date for Previously Approved Effective Fire Protection Mods,Effective 801029.Rule Will Be Superseded by Pending Revision)
- ML20093N058 + (Forwards Interim 10CFR50.55(e) Rept Re QA Program & Mfg Deficiencies Affecting Radiation Monitoring Equipment Supplied by Victoreen,Inc)
- ML13322B027 + (Forwards Interim Acceptance Criteria for Reactor Vessel Thermal Shield Monitoring Program Developed During First 7 Days of Operation at 85% Power Per Requirements of License Condition 3.M)
- ML17252A659 + (Forwards Interim Actions to Be Taken by 810515 Re Review of Controls for Handling Heavy Loads Per 801222 & 810203 Requests.Approach Taken in NUREG-0612 to Minimize Likelihood of Heavy Load Drop Impacting Spent Fuel Too Broad)
- ML16340B497 + (Forwards Interim Agreement on Criteria for Low Power Testing of New Commercial Nuclear Facilities.Fema/Nrc Steering Committee Considers Criteria Adequate & Can Serve as Interim Basis.Certificate of Svc Encl)
- ML19345A556 + (Forwards Interim All Volatile Treatment Guidelines, Overall Direction All Volatile Treatment Guidelines & Steam Side Water Chemistry Control Specs in Response to NRC 800826 Request for Info)
- PM-80-182, Forwards Interim Annual Operating Rept for 1979 + (Forwards Interim Annual Operating Rept for 1979)
- ML17340B411 + (Forwards Interim Annual Operating Rept for 1979.)
- ML20155B943 + (Forwards Interim Change I88-1 to Rev 11 to QA Program Plan, Including Shifts of Responsibility,Changes in Titles & New Organizational Structure)
- NOC-AE-00005, Forwards Interim Change Notice 18-1 to STP Emergency Plan. W/Summary of Changes + (Forwards Interim Change Notice 18-1 to STP Emergency Plan. W/Summary of Changes)
- NOC-AE-000307, Forwards Interim Change Notice 18-2 to STP Emergency Plan. Changes Do Not Constitute Reduction in Effectiveness of Plan.Summary of Changes Also Encl + (Forwards Interim Change Notice 18-2 to STP Emergency Plan. Changes Do Not Constitute Reduction in Effectiveness of Plan.Summary of Changes Also Encl)
- TXX-9340, Forwards Interim Change Request ISI-1R2-005 to Rev 2 to Unit 1 ISI Plan + (Forwards Interim Change Request ISI-1R2-005 to Rev 2 to Unit 1 ISI Plan)
- ML20081F107 + (Forwards Interim Change Request ISI-1R3-02 to Rev 3 to Unit 1 ISI Plan)
- TXX-9653, Forwards Interim Change Request ISI-1R4-001,which Updates Rev 4 of CPSES Unit 1 ISI Program Plan + (Forwards Interim Change Request ISI-1R4-001,which Updates Rev 4 of CPSES Unit 1 ISI Program Plan)
- ML20154C442 + (Forwards Interim Change Request ISI-1R5-001 to Unit 1 ISI Plan,Rev 5, Updating NRC Copy of Rev 5.Encl Does Not Contain Request for Relief from ASME Code Requirements)
- ML20107F463 + (Forwards Interim Change Request ISI-2R0-006 of CPSES Unit 2 ISI Program Plan)
- ML20069E508 + (Forwards Interim Change Request ISI-2RO-001 to Comanche Peak Ses Unit 2 ISI Program Plan)
- ML20091K956 + (Forwards Interim Change Request ISI-IR3-003 to Rev 3 to Unit 1 ISI Plan)
- ML20128B606 + (Forwards Interim Change Request PSI-RO-001 to Preservice Program Plan)
- ML20128B608 + (Forwards Interim Change Request PSI-RO-001 to Preservice Program Plan.)
- ML20091L910 + (Forwards Interim Change Requests ISI-RO-001 & 002 to Update Inservice Insp Program Plan)
- ML19344D899 + (Forwards Interim Charter for Ofc of Analysis & Evaluation of Operational Data.Comments from Interfacing Ofcs Have Been Incorporated.Supporting Documentation Encl)
- ML20093G906 + (Forwards Interim Closure Rept Re Compliance W/Proposed Upgrades to Reactor Vessel Water Level Measurement Sys Design.Rept Forms Basis for Resolving TMI Action Plan Item II.F.2.Final Rept Will Be Submitted by Late Oct 1984)
- ML20100F105 + (Forwards Interim Comments on Final Draft Tech Specs.Review Will Be Completed by 841210)
- ML16340C326 + (Forwards Interim Comments on Phase I of Util Reverification Program.Phase II Encl for Review.Comments Should Be Submitted by 820205)
- ML19208A960 + (Forwards Interim Const Deficiency Rept 13 Re Reactor Containment Bldg Dome Concrete)
- ML20211P859 + (Forwards Interim Contractor Rept on Probabilistic Safety Study.Comments on Assumptions,Interpretations & Analyses in Interim Rept Requested as Soon as Possible to Support mid- Aug 1986 Meeting to Discuss Preliminary Observations)
- ML20011E962 + (Forwards Interim Control Rod Withdrawal Limits for Facility, Cycle 1,per Tech Spec 3.1.1.3,Action a.3)
- ML19250C075 + (Forwards Interim Criteria Showing Compliance W/Provisions of EPA U Fuel Cycle std,40CFR190,in Response to NRC 790917 Request)
- ML19250B935 + (Forwards Interim Criteria to Demonstrate Conformance W/Epa U Fuel Cycle Std (40CFR190) by 791201)
- ML19250B968 + (Forwards Interim Criteria to Demonstrate Conformance w/40CFR190 EPA U Fuel Cycle Std.Individual Licensee Should Not Be Responsible for Releases from U Fuel Cycle Beyond Facility)
- ML20151H951 + (Forwards Interim Ctr QA Manual & Comment Resolution Sheet)