ML16340B497
| ML16340B497 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 03/06/1980 |
| From: | Grimes B, Ryan R Federal Emergency Management Agency, NRC - EMERGENCY PREPAREDNESS TASK FORCE |
| To: | Harold Denton, Mcconnell J Federal Emergency Management Agency, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML16340B498 | List: |
| References | |
| NUDOCS 8103180040 | |
| Download: ML16340B497 (4) | |
Text
- ~
~ s
< '~,'.: V '..: l ) 'Uh r
L '~i ~ >>li(~~~>t'JW rl<G'r or(, o. e. "('. $ 5 ATTA(HMENT B :
r","",Otutlou'l. OR:
o<<R. Benton, Director, Office of ttuc]ear Reactor Regula tian, I RC dot>n H. t!cConnr 11, !Lsslstant Assoc1nte 0/rector f'r Population Preparedness
~ FB'R FEt"AftlRC Steering Corrmi ttec
~ ~
EHERGEHCY PREPARED)JESS CRITERIA FOR LOU PO"ER TESTIttG accordance with your emchrrr~rte of lettr.rs,
) oth <lated February 14, l980, the Joint FOlh/ttRC Steer.trrq Corrmitt~e hr.s a~de n <teterio'~nation on i~hether speci( ic emergency preparednr.ss cr$ ter! rr steno)rt tie developed for los power testing auttiorlzathorrs at new comnerc'tn) nuc) cnr power flcilit<es-The Steering Corwi ttee has determined that thr posit.(on in the enclosure
~1th
.i egard Co emergency preparedness for 1oz powr r <estlrig
$ s adequate and c~n serve as an interim basis f'r licensor>g fac! 1! ties for low power testing-The Steering Corrznittee concludes tt>at
$ n vice of ttle fAtnil.al nature of the potential
- hazard, the development-of specific low po~rer testing cr!teria He conclud e conclude that nn appropriate obgectfve for those =f'ac!i]ties beyond Horth Anna.
Salem and Diablo Canyon fs to assess against the upgraded tie',C/tEt'~
cr teria end raktM ffnd<ngs zkth regard to the sign! ftcance of any def$ c$ en for low'ower Zesting a thortznt4onr.
~
a'g~~
Brian K. Grimes, Director Eme~~ency Preparedness Task Group
., Office of'uc)ear Reactor Regu1ation - NAC pe Rob e rt Ry a n, 0 ir'ec t r D>vision of Radiological Emergency Preparedness
- FEJ'A 0
~
Co-Chv L r~nen of th~
FBW/NRC S t>cr! ng ChlrIA(ttQQ Enc1c sure:
Criteria f'r Low Power Testing cc i~/enclo.,ure:
'~3'.'i tiP,C Steer! ng Coom! ttee K.
C "roe)1
- . r. c:.~~
83,03. 1800 IG)
"48 K <'~>>-" >
I4~
/
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the t1atter of PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Nuclear Power Plant, Units Nos.
1 and 2)
Docket Nos.
50-275 O.L.
50-323 O.L.
CERTIFICATE OF SERVICE I hereby certify that copies of NRC
RESPONSE
TO JOINT INTERVENORS'NTERROGATORIES in the above-captioned proceeding have been served on the following by deposit in the United States mail, first class or, as indicated by an asterisk, through deposit in the Nuclear Regulatory Commission's internal mail system, this 16th of March, 1981.
- Elizabeth S. Bowers, Esq.,
Chairman Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D.C.
20555
- Mr. Glenn 0. Bright Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D.C.
20555
- Or. Jerry Kline Atomic Safety and Licensing Board U.
S. Nuclear Regulatory Commission Washington, D.
C.
20555 Philip A. Crane, Jr.,
Esq.
Pacific Gas and Electric Company P.O.
Box 7442 San Francisco, California 94106 Mrs. Elizabeth Apfelberg 1415 Cozadero San Luis Obispo, California 93401 Mrs. Raye Fleming 1920 Mattie Road Shell Beach, California 93449 Mr. Frederick Eissler Scenic Shoreline Preservation Conference, Inc.
4623 More Mesa Drive Santa Barbara, California 93105 Mrs. Sandra A. Silver 1760 Alisal Street San Luis Obispo, California 93401 Mr. Gordon.Silver 1760 Alisal Street San Luis Obispo, California 93401 Richard B. Hubbard MHB Technical Associates 1723 Hamilton Avenue - Suite K
San Jose, California 95125 Andr ew Baldwin, Esq.
124 Spear Street San Francisco, California 94105