ML19208A960
| ML19208A960 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 09/14/1979 |
| From: | Aswell D LOUISIANA POWER & LIGHT CO. |
| To: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| LPL-11994, NUDOCS 7909180355 | |
| Download: ML19208A960 (1) | |
Text
. _ u L.
LOUISIANA P O W E R & L 1 G H T! P O. BOX 6008
- NEW OALEANS. LOUIS!ANA 70174 142 DELARONCE STREET
+ (504) 366-2345
'Tu$'s sEsNU u
- o. t r.wsu.
September 14, 1979 LpL 11994 Q-3-A35.02.01 Q-3-A35.07 Mr. K. V. Seyfrit, Director, R2gion IV U. S. Nuclear Regulatory Co= mission Office of Inspection and Enforcesent 611 Ryan Placa Drive, Suite 1000 Arlington, Texas 76012 SUBJE F: Waterford SES Unit #3 Interim Report of Significant Construction Deficiency Number 13 Reactor Containment Building Dome Concrete
Dear Mr. Seyfrit:
In accordance with the requirements of 10CFR50.55(e), me are submitting two (2) copies of the Interim Report for the subject 5;.gnificant Construction Deficiency No. 13. Additionally as previously agreed to, you will be notified 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to the resumption of placement of concrete in the containment building dome.
Yours very truly, D. L. Aswell DLA:TFG:smd Enclosures cc:
1)
Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Co= mission Washington, D. C. 20555 (with 15 copies of report)
$6()(J[y 5\\
2)
Director
\\
Office of Management Information and Program Control U. S. Nuclesr Regulatory Co= mission 7 0 0918 0 M5s Washington, D. C. 20555 (with one copy of report)