Forwards Interim Const Deficiency Rept 13 Re Reactor Containment Bldg Dome Concrete
ML19208A960
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/14/1979
From: Aswell D
LOUISIANA POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
LPL-11994, NUDOCS 7909180355
Download: ML19208A960 (1)


Text

. _ u .

L.

'Tu$'s u

sEsNU LOUISIANA 142 DELARONCE STREET P O W E R & L 1 G H T! P O. BOX 6008

  • NEW OALEANS. LOUIS!ANA

+ (504) 366-234570174

o. t r.wsu.

September 14, 1979 ,% %.

LpL 11994 Q-3-A35.02.01 Q-3-A35.07 Mr. K. V. Seyfrit, Director, R2gion IV U. S. Nuclear Regulatory Co= mission Office of Inspection and Enforcesent 611 Ryan Placa Drive, Suite 1000 Arlington, Texas 76012 SUBJE F: Waterford SES Unit #3 Interim Report of Significant Construction Deficiency Number 13 Reactor Containment Building Dome Concrete

Dear Mr. Seyfrit:

In accordance with the requirements of 10CFR50.55(e), me are submitting two (2) copies of the Interim Report for the subject 5;.gnificant Construction Deficiency No. 13. Additionally as previously agreed to, you will be notified 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to the resumption of placement of concrete in the containment building dome.

Yours very truly, D. L. Aswell DLA:TFG:smd Enclosures cc: 1) Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Co= mission Washington, D. C. 20555 (with 15 copies of report) $6()(J[y

2) Director 5\\

Office of Management Information and Program Control U. S. Nuclesr Regulatory Co= mission Washington, D. C. 20555 7 0 0918 0 M5s (with one copy of report)