Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133A733 + (Forwards Four Pp Changes to Maybell Final Remedial Action Plan Intended to Closeout 40CFR192 Subpart B Requirements at Site.Changes Submitted)
- ML20199H167 + (Forwards Four Proposed Updated Chapter 3 Sections to Sar. Proposed Sections Are Representative of Content & Level of Detail to Be Included in Updated Chapter 3 Section for SSCs Categorized as Grade 1 Through Grade 4)
- ML20216F371 + (Forwards Four Proprietary Copies of Final RAP & Site Design for Stabilization of Naturita Title I Residual Radioactive Matls at Upper Burbank Repository,Uravan,Co. Proprietary Info Withheld)
- ML20050C750 + (Forwards Four Public Opinion Survey Repts Re TMI Situation & Schedules for Supporting Gpu Estimate of Cost of TMI Replacement Energy for Apr 1979 to Dec 1981.Rept Local Resident Perceptions of TMI Withheld)
- ML20094E098 + (Forwards Four Questions & Supporting Documents,For Review & Consideration)
- ML20132G031 + (Forwards Four Questions Re Investigation of Matl Discovered at Emco Recycling That Came from Aircraft Reworking Company & Was Sold to Metal Recycler)
- ML20149L803 + (Forwards Four ROs & One SRO License Certificates)
- ML20198Q131 + (Forwards Four Radioisotope Returned Notifications,Confirming That Described Am-241 Sealed Sources Were Returned to Industrial Dynamics Co,Ltd,On 961130 & 961206)
- PY-CEI-NRR-1521, Forwards Four Relief Requests for Unit 1 Inservice Exam Program Generated Upon Completion of Facility Third Refueling Outage + (Forwards Four Relief Requests for Unit 1 Inservice Exam Program Generated Upon Completion of Facility Third Refueling Outage)
- ML20081H710 + (Forwards Four Representative Analyses of Equipment Design Margin Studies Per Seismic Confirmatory Program & Draft Equipment List of Active Balance of Plant,Components for Cold Shutdown.Proprietary Info Withheld)
- ML20128N816 + (Forwards Four Repts from OECD Describing Current Positions Taken by OECD Member Countries on Source Term.Repts May Be Useful in Preparation for ANS Meeting in Snowbird,Ut.Crest Code Comparison Rept Also Encl.W/O Encls)
- ML18092A194 + (Forwards Four Revised Oversize Drawings Indicating Mod to Circuit Design to Extinguish Red Light Upon Loss of 125-volt Dc Power.Aperture Cards Are Available in PDR)
- ML19249A501 + (Forwards Four Revised Pages to 780314 License Application Re Storage of Unirradiated Reactor Fuel & Radioactive Matl. Revisions Concern Fuel Handling Cranes)
- ML18153C297 + (Forwards Four Safety Concerns Re Maintaining Safe Plant Operations)
- ML20135E461 + (Forwards Four Sets of Pp Changes for Final Long Term Surveillance Plan for Falls City,Disposal Site,Falls City, Tx.Comment & Response Document,Encl)
- HBL-85-047, Forwards Four State of CA Documents Supporting Util Safstor Decommissioning Environ Plan + (Forwards Four State of CA Documents Supporting Util Safstor Decommissioning Environ Plan)
- ML20052E031 + (Forwards Four Sworn Affidavits by Former Employees of Hayward Tyler Pump Co Alleging Misleading Recordkeeping & Faulty Pump Mfg.Physical Exam of Pumps Used in safety- Related Sys Should Be Undertaken by NRC)
- ML20149K985 + (Forwards Four Technical Assistance Requests W/Incident & Event Info,Program Mgt Info,Training Course Info,Technical Info & Other Info)
- ML20034C455 + (Forwards Four Telcon Records Documenting Info Received by Region II from Concerned Individuals Re Health Physics, Security,Safety Concerns & Contaminated Matls Disposal,For Review.Encl Withheld (Ref 10CFR2.790(a)(6) & (7)))
- ML20207S595 + (Forwards Four Transcripts of Interviews by House Committee on Interior & Insular Affairs Re Mystery Man Issue, Including:Jh Chwastyk 830510,WA Marshall 830512,CC Faust 830401 & G Kunder 830516 Interviews.Related Correspondence)
- ML20094E144 + (Forwards Four Year Update for Certification of Vermont Yankee Simulator Per 10CFR55.5)
- JAFP-95-0134, Forwards Four Yr Performance Testing Rept (Per 10CFR55.45(b)) + (Forwards Four Yr Performance Testing Rept (Per 10CFR55.45(b)))
- ML20117C766 + (Forwards Four Yr Rept for CNS Unit One Simulator Per 10CFR55.45 b.5.ii & b.5.vi)
- ML20101U559 + (Forwards Four Yr Rept for Catawba Nuclear Station Unit 1 Simulator,Per 10CFR50.45 b.5.ii & b.5.vi.Rept Consists of List of Failed Test Procedures,Description of Tests Completed (1988-1991) & Next Four Yr Test Schedule)
- ML20235P004 + (Forwards Four of Five Invoices Covering Work Performed Under RS-ASB-84-353 for 840615-0814.Quick Payment Discount of 2% Offered.W/O Encls)
- NPL-95-0329, Forwards Four-YR Performance Test Rept + (Forwards Four-YR Performance Test Rept)
- ML20197A885 + (Forwards Fourteen Discrepancy Repts (Drs) Identified During Review Activities for Independent Corrective Action Verification Program)
- ML20217P327 + (Forwards Fourteen Discrepancy Repts (Drs) Identified During Review Activities for Independent Corrective Action Verification Program.Drs Distributed IAW Communications Protocol,PI-MP3-01)
- ML20203B092 + (Forwards Fourteen Drs Identified During Review Activities for Independent Corrective Action Verification Program,Iaw Communications Protocol,PI-MP3-01)
- ML20217Q543 + (Forwards Fourteen Priority One Proposed Changes to Improved TS Nuregs,Nei TS Task Force (TSTF) Traveler Listed Numbers)
- ML20044D728 + (Forwards Fourteen-Day Rept of Reportable Event Re Inadvertent Mod of Univ of Virginia Reactor Console. on 930428,discovered That Reactor Operated for 5.5 H W/Five Major Reactor Automatic Trips Inoperable)
- ML20115G558 + (Forwards Fourteenth Edition of Integrated Implementation Schedule for Units 2 & 3)
- ML20211C600 + (Forwards Fourteenth Monthly Status Rept for 811115-811215, Discussing Actions Taken on Operating Reactors & Licensing Reviews of New Facilities.Aslb Issued 811214 Partial Initial Decision Re TMI-1 Design,Procedures & Emergency Planning)
- ML18017B974 + (Forwards Fourteenth Quarterly Data Rept of Seismic Monitoring Program, Apr-June 1982)
- ML18017B975 + (Forwards Fourteenth Quarterly Data Rept of Seismic Monitoring Program, Apr-June 1982)
- ML20059E874 + (Forwards Fourteenth Quarterly Rept Cleveland Electric Illuminating Co Seismic Monitoring Network Jan-June 1990. Five Microevents Originating within Network & Three Other Events Originating Outside of Network Recorded)
- ML19261C371 + (Forwards Fourteenth Quarterly Rept for Seismic Monitoring Program.Also Forwards 790227 Transmittal Ltr from Wj Cahill, Consolidated Edison of Ny,To a Schwencer,Nrc, & Revisions to Thirteenth Quarterly Rept)
- PY-CEI-NRR-1279, Forwards Fourteenth Quarterly Rept,Cleveland Electric Illuminating Seismic Monitoring Network,Jan-June 1990. One Microearthquake Detected in Epicentral Area of 860131 Leroy Earthquake + (Forwards Fourteenth Quarterly Rept,Cleveland Electric Illuminating Seismic Monitoring Network,Jan-June 1990. One Microearthquake Detected in Epicentral Area of 860131 Leroy Earthquake)
- ML20053D380 + (Forwards Fourteenth Semimonthly Status Rept 14 Re Design Verification Program)
- ML20082R710 + (Forwards Fourth & Fifth Interrogatories on Contention VI-1, Qualifications of Fr Romano & to Aslb. W/Certificate of Svc.Related Correspondence)
- ML20235W589 + (Forwards Fourth 6 Month Pcrv Tendon Interim Surveillance Rept & Proposal for Revised Interim Surveillance Program. Util Proposes Initiation of Revised Program Following Submittal of Fifth 6-month Rept.W/Four Oversize Drawings)
- ML20127C489 + (Forwards Fourth Amended Disclosure Statement for Bondholders Committee Fifth Amended Plan of Reorganization Dtd 921221, Before Us Bankruptcy Court in District of Nh on Behalf of Eua Power Corp)
- ML20093A523 + (Forwards Fourth Biweekly Update of Schedule for Loading of Fuel.Related Correspondence)
- ML13330B178 + (Forwards Fourth Edition of Integrated Living Schedule,Per)
- ML20058H404 + (Forwards Fourth Group of Financial Assurance Submittals, for Review.W/O Encl)
- ML19338E644 + (Forwards Fourth Info Request of Federal Executive Agencies in Response to NRC 790921 Request for Info Re Significant Regulatory Development Affecting General Public Utils)
- ML19309G087 + (Forwards Fourth Interim Deficiency Rept Re High Pressure Core Spray Diesel Generator Switchgear Wiring Discrepancies)
- ML19309G088 + (Forwards Fourth Interim Deficiency Rept Re High Pressure Core Spray Diesel Generator Switchgear Wiring Discrepancies)
- ML19254D901 + (Forwards Fourth Interim Deficiency Rept Re Impact Test Results of Main Feed Pipe Spools)
- ML19254D902 + (Forwards Fourth Interim Deficiency Rept Re Impact Test Results of Main Feed Pipe Spools)
- ML20151B258 + (Forwards Fourth Intermediate Decision,Including 601230 Order Amending License DPR-3 Re Tech Specs Change Procedures. Amend 2 to License DPR-3 Specifies Reactor Change Request Authorization Procedures.W/O Encls)